Project overview
Imperial Paradise Building No.10 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000054036. Imperial Paradise Building No.10 is located at Betegaon Village. This is a New Project being developed by Aditi Builders &Amp; Developers.
Imperial Paradise Building No.10 has 1 BHK, 1RK, 2 BHK & Shop Apartments with carpet areas ranging from 144 to 609 Sq.ft. Carpet. The Project has total 74 of which 74 are currently available for sale.
Imperial Paradise Building No.10 is being developed on a total land area of 31568 Sq.ft. Imperial Paradise Building No.10 has 3 Wings / Towers Imperial Paradise Building No 10 Wing A,Imperial Paradise Building No 10 Wing B,Imperial Paradise Building No 10 Wing C
| Project | Developer | Location | Possession |
-
Developer:
Aditi Builders &Amp; Developers
-
Phone:
-
Address:
-
Shop No 02, Evershine City, Evershine Road, Front Of Sector No 7, Vasai East, 401208
| MAHA REARA No: |
P99000054036 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Architect |
Ajay Wade &Amp; Associates |
| Funding Bank |
ICICI BANK |
| Proposed Possession |
31 Dec 2025 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
14 Dec 2023 |
| Last Retrived |
28 Jul 2025 |
Imperial Paradise Building No.10 QR Code
Imperial Paradise Building No.10
MahaRERA - P99000054036
| Type | Area |
| 1 BHK | 35.82 Sq.mts. ( 386 Sq.ft. ) |
| 1 BHK | 37.39 Sq.mts. ( 402 Sq.ft. ) |
| 1RK | 21.7 Sq.mts. ( 234 Sq.ft. ) |
| 2 BHK | 53.53 Sq.mts. ( 576 Sq.ft. ) |
| 2 BHK | 54.3 Sq.mts. ( 584 Sq.ft. ) |
| 2 BHK | 56.61 Sq.mts. ( 609 Sq.ft. ) |
| Shop | 13.39 Sq.mts. ( 144 Sq.ft. ) |
| Shop | 13.71 Sq.mts. ( 148 Sq.ft. ) |
| Shop | 13.79 Sq.mts. ( 148 Sq.ft. ) |
| Shop | 17.5 Sq.mts. ( 188 Sq.ft. ) |
| 1 BHK | 32.95 Sq.mts. ( 355 Sq.ft. ) |
| 1 BHK | 33.44 Sq.mts. ( 360 Sq.ft. ) |
| 1 BHK | 35.01 Sq.mts. ( 377 Sq.ft. ) |
| 1RK | 20.19 Sq.mts. ( 217 Sq.ft. ) |
| Shop | 10.7 Sq.mts. ( 115 Sq.ft. ) |
| Shop | 13.65 Sq.mts. ( 147 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Imperial Paradise Building No.10last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Work Not Yet Started |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Work Not Yet Started |
|
|
|
Work Not Yet Started |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Work Not Yet Started |
Solid Waste Management And Disposal
|
|
Work Not Yet Started |
|
|
|
Work Not Yet Started |
|
|
|
Work Not Yet Started |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Work Not Yet Started |
|
|
|
Work Not Yet Started |
Buildings / Wings in Imperial Paradise Building No.10
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Imperial Paradise Building No.10 by Aditi Builders &Amp; Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
74
apartments in total
Saleable Area Statistics (Sq. ft.)
26794
Total
Total 74 apartments in project. 0 apartments booked. 0% apartments booked.
Total 26794 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Imperial Paradise Building No 10 Wing A | Dec 2025 | 4 | 0 | 0 | 0 | 0 | 10 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 35.82 Sq.mts. ( 386 Sq.ft. ) | 7 | |
| 1 BHK | 37.39 Sq.mts. ( 402 Sq.ft. ) | 1 | |
| 1RK | 21.7 Sq.mts. ( 234 Sq.ft. ) | 1 | |
| 2 BHK | 53.53 Sq.mts. ( 576 Sq.ft. ) | 1 | |
| 2 BHK | 54.3 Sq.mts. ( 584 Sq.ft. ) | 7 | |
| 2 BHK | 56.61 Sq.mts. ( 609 Sq.ft. ) | 1 | |
| Shop | 13.39 Sq.mts. ( 144 Sq.ft. ) | 1 | |
| Shop | 13.71 Sq.mts. ( 148 Sq.ft. ) | 1 | |
| Shop | 13.79 Sq.mts. ( 148 Sq.ft. ) | 1 | |
| Shop | 17.5 Sq.mts. ( 188 Sq.ft. ) | 4 | |
25 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Imperial Paradise Building No 10 Wing A | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Imperial Paradise Building No 10 Wing B | Dec 2025 | 4 | 1 | 0 | 0 | 0 | 10 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 32.95 Sq.mts. ( 355 Sq.ft. ) | 1 | |
| 1 BHK | 33.44 Sq.mts. ( 360 Sq.ft. ) | 14 | |
| 1 BHK | 35.01 Sq.mts. ( 377 Sq.ft. ) | 2 | |
| 1RK | 20.19 Sq.mts. ( 217 Sq.ft. ) | 1 | |
| Shop | 10.7 Sq.mts. ( 115 Sq.ft. ) | 2 | |
| Shop | 13.65 Sq.mts. ( 147 Sq.ft. ) | 4 | |
24 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Imperial Paradise Building No 10 Wing B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Imperial Paradise Building No 10 Wing C | Dec 2025 | 4 | 0 | 0 | 0 | 0 | 10 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 35.82 Sq.mts. ( 386 Sq.ft. ) | 7 | |
| 1 BHK | 37.39 Sq.mts. ( 402 Sq.ft. ) | 1 | |
| 1RK | 21.7 Sq.mts. ( 234 Sq.ft. ) | 1 | |
| 2 BHK | 53.53 Sq.mts. ( 576 Sq.ft. ) | 1 | |
| 2 BHK | 54.3 Sq.mts. ( 584 Sq.ft. ) | 7 | |
| 2 BHK | 56.61 Sq.mts. ( 609 Sq.ft. ) | 1 | |
| Shop | 13.39 Sq.mts. ( 144 Sq.ft. ) | 1 | |
| Shop | 13.71 Sq.mts. ( 148 Sq.ft. ) | 1 | |
| Shop | 13.79 Sq.mts. ( 148 Sq.ft. ) | 1 | |
| Shop | 17.5 Sq.mts. ( 188 Sq.ft. ) | 4 | |
25 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Imperial Paradise Building No 10 Wing C | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Aditi Builders &Amp; Developers
for Project
Imperial Paradise Building No.10
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |