Project overview

Hubtown Sunmist A 6Th To Above Floor is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001202. Hubtown Sunmist A 6Th To Above Floor is located at Cts No 426 428 To 430. This is a Ongoing being developed by Hubtown Limited.

Hubtown Sunmist A 6Th To Above Floor has 2 BHK, 4 BHK & 4.5 BHK Apartments with carpet areas ranging from 1080 to 1076 Sq.ft. Carpet. The Project has total 64 of which 5 are currently available for sale.

Hubtown Sunmist A 6Th To Above Floor is being developed on a total land area of 12370 Sq.ft. Hubtown Sunmist A 6Th To Above Floor has 1 Wings / Towers Hubtown Sunmist A 6Th To Above Floor

ProjectDeveloperLocationPossession
Hubtown Sunmist A 6Th To Above FloorHubtown LimitedCts No 426 428 To 43031-12-2019 00:00:00
Nirant ApartmentAditi Constructions6351 To 531-12-2018 00:00:00
Hubtown SolarisHubtown Limited130-12-2022 00:00:00
Mesacon Jewel Wing A And BMesacon ProjectsCts 59430-06-2023 00:00:00
Mesacon Jewel Wing CMesacon ProjectsCts 59430-06-2023 00:00:00
Vivan HomesImprint Estates Pvt LtdSurvey No 223C Cts No 584 584 1 To 16 Old Final Plot No 70 New Plot No 5830-12-2026 00:00:00
Kalpataru YashodhanKalpataru Property Ventures LlpTps - Andheri-Vi Of Village Vile Parle, F.P. No 71 Part30-04-2022 00:00:00
Swashraya Andheri Chs LtdDem Constructions Llp400/2, 400/1, 40029-02-2024 00:00:00
Ground Floor - The Baya GoldspotRenaissance Spaces40009931-12-2023 00:00:00
Express EnclaveMd Globus Realty Pvt Ltd5231To37, 517, 523, 5201To230-09-2020 00:00:00
Pratima Co-Operative Housing SocietySubhash Velji Chawda53-301-08-2018 00:00:00
Veesita ResidencyRite Developers92, 92/1 To 6 And 9430-04-2022 00:00:00
Evergreen WoodsAnkur Mayflower Associates657/1-19, 65730-06-2020 00:00:00
The Summit Business Bay AndheriOmkar Realtors And Developers Private LimitedCts No.265Pt 266Pt 266/93Pt 266/94Pt, 266/95Pt 266/96Pt 266/98Pt 266/99Pt 26630-06-2019 00:00:00
A And O FloranteM/S Charmee EnterprisesSambhaji Nagar, 400069, Mumbai Suburban31-12-2020 00:00:00
DarshanArkade Developers Private LimitedPlot No. 74 B Part 1, 792 A 9 1, 792 A 10 2, Tps - I Of Vile Parle East, 792 A 13 5, 792 A 11 3, 792 A/10-4, 792 A/10-5 I.E. Cts No. 792 A, 792 A 12 430-06-2023 00:00:00
Solaris 14Th FloorHubtown Limited427/6, Cts No. 427/3, 427/7 And 45530-06-2026 00:00:00
Shilpa ChsYash InfraC.T.S 112/5/5 T.No-1229-12-2020 00:00:00
Pruthvi ShakunPruthvi Enterprise252/930-09-2023 00:00:00
VishakhaGreen Tree Lifescapes Llp75801-08-2022 00:00:00
Neumec VinayakNeumec VentureCts 418 C/131-03-2019 00:00:00
Shubhada Co-Operative Housing Society Ltd.Bhoomivijay Properties Private Limited253 253 1 To 830-06-2021 00:00:00
Royal Court - CommercialPsc Properties Private LimitedCts No 36 36/1 To 36/72 Of Village Vile Parle East31-07-2018 00:00:00
Meghdoot ResidencyMilan Interbuilt Private Limited21531-03-2018 00:00:00
Vijayraj ResidencyVijayraj Realtors40005731-07-2024 00:00:00
Chandan Chs LtdAum G M Heights65830-12-2021 00:00:00
CelestiaAriisto Developers Private LimitedCts No 19/11 Of Village Mulund Tal Kurla M.S.D. Near Veena Nagar Off Lbs Marg Mulund West Mumbai30-12-2025 00:00:00
Vireshwar Darshan Chs LtdVireshwar Darshan Chs Ltd63230-06-2024 00:00:00
Gayatri HeightsGayatri Properties71530-06-2026 00:00:00
Pratap EleganceDowntown Lifespaces Llp1931-03-2025 00:00:00
Mahakali HillsMohid Construction Co554 A Pt31-12-2024 00:00:00
Modirealty KalpvrikshModirealty Developers Pvt LtdPlot No. 29 A Of T.P.S Vi/ Cts No. 608/608 1 To 3 & 608B31-03-2025 00:00:00
Udyanjali ChsAshray Developers252/1230-12-2020 00:00:00
Panom Park Phase 1 Wing A B C And C ExtensionPanom Developers LlpCts 331 Cts 331/1 To 2 Cts 332 Cts 332/1 To 42 Cts 333 Pt Cts 354 Pt Cst 354/1 To 17 And Nala Land31-12-2019 00:00:00
The KollageZire Rushi ConstructionCts Nos 328 329 Pt Subdivided Plot F30-12-2022 00:00:00
CallistaJoy And Sayla RealtorsAzad Road30-06-2020 00:00:00
Nityanand Nagar Vibhag Iv Cooperative Housing Society LimitedBajaj International Realty Private Limited684 A 684 A 1 To 6930-06-2021 00:00:00
7Th Floor - C Wing - The Baya GoldspotRenaissance Spaces535 Of Chakala, 529, 528, Andheri East, 529/1 To 529/3230-12-2023 00:00:00
Labh SapphireLabhartirealities579, 579/1 To 579/531-12-2027 00:00:00
Pratap HarmonySheetal Developers106, 106/ 1 To 531-12-2027 00:00:00
56 Park AvenueKrishang Infra Private Limited66531-12-2024 00:00:00
Sale Building 1 - Chamunda Crown And Sale Building 3 - Chamunda ClassicChamunda Builders & DevelopersCts No.294, 295, C.T.S. No.295/1 To 24, 296, 296/1 To 8, 297, 297/1 To 5, 386(Pt), Plot C, Plot F (Old Cts 325(Pt), 387 (Pt)31-12-2026 00:00:00
Project Details
  • Project:
    Hubtown Sunmist A 6Th To Above Floor
  • Location:
  • Cts No 426 428 To 430
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Hubtown Limited
  • Phone:
  • Address:
  • Hubtown Seasons
Project RERA Details
MAHA REARA No: P51800001202
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect City Gold Management Services (Maya Vaidya)
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 27 Jul 2017
Last Retrived 26 Jul 2025
Hubtown Sunmist A 6Th To Above Floor QR Code
Hubtown Sunmist A 6Th To Above Floor
MahaRERA - P51800001202
Apartment Details & Configuration
TypeArea
2 BHK78.26 Sq.mts. ( 842 Sq.ft. )
2 BHK78.29 Sq.mts. ( 843 Sq.ft. )
2 BHK78.3 Sq.mts. ( 843 Sq.ft. )
2 BHK78.32 Sq.mts. ( 843 Sq.ft. )
2 BHK81.03 Sq.mts. ( 872 Sq.ft. )
2 BHK81.64 Sq.mts. ( 879 Sq.ft. )
2 BHK81.76 Sq.mts. ( 880 Sq.ft. )
2 BHK81.84 Sq.mts. ( 881 Sq.ft. )
2 BHK82 Sq.mts. ( 883 Sq.ft. )
2 BHK82.51 Sq.mts. ( 888 Sq.ft. )
2 BHK82.6 Sq.mts. ( 889 Sq.ft. )
2 BHK83.25 Sq.mts. ( 896 Sq.ft. )
2 BHK83.61 Sq.mts. ( 900 Sq.ft. )
2 BHK84.51 Sq.mts. ( 910 Sq.ft. )
2 BHK84.66 Sq.mts. ( 911 Sq.ft. )
2 BHK86.4 Sq.mts. ( 930 Sq.ft. )
2 BHK86.48 Sq.mts. ( 931 Sq.ft. )
2 BHK86.72 Sq.mts. ( 933 Sq.ft. )
2 BHK87.1 Sq.mts. ( 938 Sq.ft. )
2 BHK88.22 Sq.mts. ( 950 Sq.ft. )
2 BHK88.85 Sq.mts. ( 956 Sq.ft. )
2 BHK89.41 Sq.mts. ( 962 Sq.ft. )
2 BHK89.59 Sq.mts. ( 964 Sq.ft. )
2 BHK89.61 Sq.mts. ( 965 Sq.ft. )
2 BHK89.84 Sq.mts. ( 967 Sq.ft. )
2 BHK90.27 Sq.mts. ( 972 Sq.ft. )
2 BHK90.38 Sq.mts. ( 973 Sq.ft. )
2 BHK90.58 Sq.mts. ( 975 Sq.ft. )
2 BHK90.94 Sq.mts. ( 979 Sq.ft. )
2 BHK92.11 Sq.mts. ( 991 Sq.ft. )
2 BHK93.02 Sq.mts. ( 1001 Sq.ft. )
2 BHK93.55 Sq.mts. ( 1007 Sq.ft. )
2 BHK93.93 Sq.mts. ( 1011 Sq.ft. )
2 BHK94.76 Sq.mts. ( 1020 Sq.ft. )
2 BHK95.04 Sq.mts. ( 1023 Sq.ft. )
2 BHK99.96 Sq.mts. ( 1076 Sq.ft. )
2 BHK100.33 Sq.mts. ( 1080 Sq.ft. )
4 BHK141.13 Sq.mts. ( 1519 Sq.ft. )
4.5 BHK150.04 Sq.mts. ( 1615 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hubtown Sunmist A 6Th To Above Floorlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Layout Amenity
Energy management
Layout Amenity
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Building / Layout Amenity
Landscaping & Tree Planting50% completed
50% Complete
Layout Amenity
Open Parking
Layout Amenity
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Building / Layout Amenity
Solid Waste Management And Disposal
Layout Amenity
Storm Water Drains100% completed
95% Complete
Layout Amenity
Street Lighting95% completed
95% Complete
Layout Amenity
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Layout Amenity
Water Conservation, Rain water Harvesting
Layout Amenity
Water Supply90% completed
90% Complete
Building / Layout Amenity
Buildings / Wings in Hubtown Sunmist A 6Th To Above Floor
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hubtown Sunmist A 6Th To Above Floor by Hubtown Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

12370 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

64 apartments in total
Total
64
Booked
59
Available
5

Saleable Area Statistics (Sq. ft.)

60840 Total
Total
60840
Booked
56146
Available
4694
Total 64 apartments in project. 59 apartments booked. 92% apartments booked.
Total 60840 Sq.ft. saleable area. 56146 saleable area booked.
92% area booked.

Hubtown Sunmist A 6Th To Above Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Hubtown Sunmist A 6Th To Above FloorDec 20191013020123
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK78.26 Sq.mts. ( 842 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK78.29 Sq.mts. ( 843 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK78.3 Sq.mts. ( 843 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK78.32 Sq.mts. ( 843 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK81.03 Sq.mts. ( 872 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK81.64 Sq.mts. ( 879 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK81.76 Sq.mts. ( 880 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK81.84 Sq.mts. ( 881 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK82 Sq.mts. ( 883 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK82.51 Sq.mts. ( 888 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK82.6 Sq.mts. ( 889 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK83.25 Sq.mts. ( 896 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK83.61 Sq.mts. ( 900 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK84.51 Sq.mts. ( 910 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK84.66 Sq.mts. ( 911 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK86.4 Sq.mts. ( 930 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK86.48 Sq.mts. ( 931 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK86.72 Sq.mts. ( 933 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK87.1 Sq.mts. ( 938 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK88.22 Sq.mts. ( 950 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK88.85 Sq.mts. ( 956 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK89.41 Sq.mts. ( 962 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK89.59 Sq.mts. ( 964 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK89.61 Sq.mts. ( 965 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK89.84 Sq.mts. ( 967 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK90.27 Sq.mts. ( 972 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK90.38 Sq.mts. ( 973 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK90.58 Sq.mts. ( 975 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK90.94 Sq.mts. ( 979 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK92.11 Sq.mts. ( 991 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK93.02 Sq.mts. ( 1001 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK93.55 Sq.mts. ( 1007 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK93.93 Sq.mts. ( 1011 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK94.76 Sq.mts. ( 1020 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK95.04 Sq.mts. ( 1023 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK99.96 Sq.mts. ( 1076 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK100.33 Sq.mts. ( 1080 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK141.13 Sq.mts. ( 1519 Sq.ft. )1
1 Booked100% Booked
100% Booked
4.5 BHK150.04 Sq.mts. ( 1615 Sq.ft. )1
1 Booked100% Booked
100% Booked
64 total apartments / 59 apartments booked. 92% apartments booked.
Work Description in Building Hubtown Sunmist A 6Th To Above FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress93% done
93% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress93% done
93% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Hubtown Limited
for Project
Hubtown Sunmist A 6Th To Above Floor
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation