Project overview

Hubtown Premiere Residences - Malibu is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800005224. Hubtown Premiere Residences - Malibu is located at 141-A. This is a Ongoing being developed by Hubtown Limited.

Hubtown Premiere Residences - Malibu has 2 BHK, 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 1128 to 901 Sq.ft. Carpet. The Project has total 76 of which 6 are currently available for sale.

Hubtown Premiere Residences - Malibu is being developed on a total land area of 5359 Sq.ft. Hubtown Premiere Residences - Malibu has 2 Wings / Towers Malibu - 14Th To 25Th Floor,Malibu - Upto 13Th Floor

ProjectDeveloperLocationPossession
Platinum Tower - 7Tirupati Gruhpravesh Llp1/6A, Survey No 106 /1A, 195 Pt30-06-2019 00:00:00
Kabra ParadiseKabra Estate And Investment Consultants195 Part/106A31-12-2018 00:00:00
Stadium ViewAcme Avenue Infrastructure Pvt. Ltd.Cts No 835 Part31-12-2019 00:00:00
Project Details
  • Project:
    Hubtown Premiere Residences - Malibu
  • Location:
  • 141-A
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jul 2029
Developer Details

  • Developer:
    Hubtown Limited
  • Phone:
  • Address:
  • Hubtown Seasons
Project RERA Details
MAHA REARA No: P51800005224
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Aakar Architect (Mr. Umesh Pawar)
Funding Bank HDFC BANK
Proposed Possession 31 Jul 2029
Revised Possession 31 Jul 2029
Extended Possession
Litigations No Litigations
Last Modified 17 Mar 2018
Last Retrived 26 Jul 2025
Hubtown Premiere Residences - Malibu QR Code
Hubtown Premiere Residences - Malibu
MahaRERA - P51800005224
Apartment Details & Configuration
TypeArea
2 BHK65.29 Sq.mts. ( 703 Sq.ft. )
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )
2 BHK69.86 Sq.mts. ( 752 Sq.ft. )
2 BHK78.6 Sq.mts. ( 846 Sq.ft. )
2 BHK78.92 Sq.mts. ( 849 Sq.ft. )
2 BHK80.31 Sq.mts. ( 864 Sq.ft. )
2 BHK83.23 Sq.mts. ( 896 Sq.ft. )
2 BHK83.72 Sq.mts. ( 901 Sq.ft. )
2 BHK85.52 Sq.mts. ( 921 Sq.ft. )
2 BHK86.91 Sq.mts. ( 935 Sq.ft. )
3 BHK94.93 Sq.mts. ( 1022 Sq.ft. )
3 BHK105.3 Sq.mts. ( 1133 Sq.ft. )
3 BHK105.62 Sq.mts. ( 1137 Sq.ft. )
3 BHK105.83 Sq.mts. ( 1139 Sq.ft. )
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )
2 BHK65.2 Sq.mts. ( 702 Sq.ft. )
2.5 BHK77.68 Sq.mts. ( 836 Sq.ft. )
2.5 BHK78.12 Sq.mts. ( 841 Sq.ft. )
2.5 BHK82.65 Sq.mts. ( 890 Sq.ft. )
2.5 BHK83.15 Sq.mts. ( 895 Sq.ft. )
3 BHK104.79 Sq.mts. ( 1128 Sq.ft. )
3 BHK105.11 Sq.mts. ( 1131 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hubtown Premiere Residences - Malibulast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Club House
Layout Amenity
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Layout Amenity
Energy management
Layout Amenity
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Building / Layout Amenity
Landscaping & Tree Planting50% completed
50% Complete
Layout Amenity
Open Parking
Layout Amenity
Sewerage (Chamber, Lines, Septic Tank , STP)85% completed
85% Complete
Building / Layout Amenity
Solid Waste Management And Disposal
Layout Amenity
Storm Water Drains50% completed
50% Complete
Layout Amenity
Street Lighting
Layout Amenity
Treatment And Disposal Of Sewage And Sullage Water
Layout Amenity
Water Conservation, Rain water Harvesting
Layout Amenity
Water Supply100% completed
95% Complete
Building / Layout Amenity
Buildings / Wings in Hubtown Premiere Residences - Malibu
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hubtown Premiere Residences - Malibu by Hubtown Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5359 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

76 apartments in total
Total
76
Booked
70
Available
6

Saleable Area Statistics (Sq. ft.)

67870 Total
Total
67870
Booked
63159
Available
4712
Total 76 apartments in project. 70 apartments booked. 92% apartments booked.
Total 67870 Sq.ft. saleable area. 63159 saleable area booked.
93% area booked.

Malibu - 14Th To 25Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Malibu - 14Th To 25Th FloorJul 2028121214092
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.29 Sq.mts. ( 703 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )10
9 Booked90% Booked
90% Booked
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK69.86 Sq.mts. ( 752 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK78.6 Sq.mts. ( 846 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK78.92 Sq.mts. ( 849 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK80.31 Sq.mts. ( 864 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK83.23 Sq.mts. ( 896 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK83.72 Sq.mts. ( 901 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK85.52 Sq.mts. ( 921 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK86.91 Sq.mts. ( 935 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK94.93 Sq.mts. ( 1022 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK105.3 Sq.mts. ( 1133 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK105.62 Sq.mts. ( 1137 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK105.83 Sq.mts. ( 1139 Sq.ft. )1
1 Booked100% Booked
100% Booked
44 total apartments / 41 apartments booked. 93% apartments booked.
Work Description in Building Malibu - 14Th To 25Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress96% done
96% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Malibu - Upto 13Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Malibu - Upto 13Th FloorJul 202891214070
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.94 Sq.mts. ( 699 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK65.2 Sq.mts. ( 702 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )2
1 Booked50% Booked
50% Booked
2.5 BHK77.68 Sq.mts. ( 836 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK78.12 Sq.mts. ( 841 Sq.ft. )3
3 Booked100% Booked
100% Booked
2.5 BHK78.6 Sq.mts. ( 846 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK82.65 Sq.mts. ( 890 Sq.ft. )2
2 Booked100% Booked
100% Booked
2.5 BHK83.15 Sq.mts. ( 895 Sq.ft. )5
5 Booked100% Booked
100% Booked
2.5 BHK83.72 Sq.mts. ( 901 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK104.79 Sq.mts. ( 1128 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK105.11 Sq.mts. ( 1131 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 BHK105.62 Sq.mts. ( 1137 Sq.ft. )2
2 Booked100% Booked
100% Booked
32 total apartments / 29 apartments booked. 90% apartments booked.
Work Description in Building Malibu - Upto 13Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress96% done
96% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress96% done
96% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Hubtown Limited
for Project
Hubtown Premiere Residences - Malibu
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation