Project overview
Houston Residency (A2) - 19Th Floor is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000933. Houston Residency (A2) - 19Th Floor is located at 194B. This is a Ongoing being developed by Rare Townships Private Limited.
Houston Residency (A2) - 19Th Floor has 1 BHK, 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 1096 to 1073 Sq.ft. Carpet. The Project has total 6 of which 2 are currently available for sale.
Houston Residency (A2) - 19Th Floor is being developed on a total land area of 35170 Sq.ft. Houston Residency (A2) - 19Th Floor has 1 Wings / Towers Rising City - Houston Residency - 19 To 28 Floor
| Project | Developer | Location | Possession |
| MAHA REARA No: |
P51800000933 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
Ongoing |
| Architect |
Citygold Management Service Private Limited |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
30 Dec 2024 |
| Revised Possession |
30 Dec 2024 |
| Extended Possession |
30 Dec 2025 |
| Litigations |
No Litigations |
| Last Modified |
11 Oct 2024 |
| Last Retrived |
26 Jul 2025 |
Houston Residency (A2) - 19Th Floor QR Code
Houston Residency (A2) - 19Th Floor
MahaRERA - P51800000933
| Type | Area |
| 1 BHK | 40.68 Sq.mts. ( 438 Sq.ft. ) |
| 1 BHK | 42.88 Sq.mts. ( 462 Sq.ft. ) |
| 2.5 BHK | 76.64 Sq.mts. ( 825 Sq.ft. ) |
| 3 BHK | 99.73 Sq.mts. ( 1073 Sq.ft. ) |
| 3 BHK | 101.85 Sq.mts. ( 1096 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Houston Residency (A2) - 19Th Floorlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Layout Amenity |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Layout Amenity |
|
|
|
Layout Amenity |
Fire Protection And Fire Safety
Requirements
|
|
Layout / Building Amenity |
Landscaping & Tree Planting
|
|
Layout Amenity |
|
|
|
Layout Amenity |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Building / Layout Amenity |
Solid Waste Management And Disposal
|
|
Layout Amenity |
|
|
|
Layout Amenity |
|
|
|
Layout Amenity |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Layout Amenity |
Water Conservation, Rain water Harvesting
|
|
Layout Amenity |
|
|
|
Layout / Building Amenity |
Buildings / Wings in Houston Residency (A2) - 19Th Floor
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Houston Residency (A2) - 19Th Floor by Rare Townships Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
6
apartments in total
Saleable Area Statistics (Sq. ft.)
4968
Total
Total 6 apartments in project. 4 apartments booked. 66% apartments booked.
Total 4968 Sq.ft. saleable area. 2798 saleable area booked.
56% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Rising City - Houston Residency - 19 To 28 Floor | Dec 2023 | 1 | 1 | 0 | 1 | 2 | 4 | 5 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 40.68 Sq.mts. ( 438 Sq.ft. ) | 1 | |
| 1 BHK | 42.88 Sq.mts. ( 462 Sq.ft. ) | 1 | |
| 2.5 BHK | 76.64 Sq.mts. ( 825 Sq.ft. ) | 1 | |
| 3 BHK | 99.73 Sq.mts. ( 1073 Sq.ft. ) | 2 | |
| 3 BHK | 101.85 Sq.mts. ( 1096 Sq.ft. ) | 1 | |
6 total apartments / 4 apartments booked. 66% apartments booked. |
| Work Description in Building Rising City - Houston Residency - 19 To 28 Floor | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Rare Townships Private Limited
for Project
Houston Residency (A2) - 19Th Floor
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |