Project overview

Horizon is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800013296. Horizon is located at Survey 77 Part I, City Survey No304a - 1-4. This is a Ongoing being developed by Ajanta Airavat Infrastructure Limited Liability Partnership.

Horizon has 1 BHK, 1.5 BHK & 2 BHK Apartments with carpet areas ranging from 416 to 596 Sq.ft. Carpet. The Project has total 287 of which 208 are currently available for sale.

Horizon is being developed on a total land area of 55027 Sq.ft. Horizon has 4 Wings / Towers A Wing,B Wing,C Wing,D Wing

ProjectDeveloperLocationPossession
Srishti EleganceSwastik Realtors293 C, 293 /1 To 5, 293 B30-06-2019 00:00:00
Eco WindsEcopark Developers LlpCts No 11931-12-2019 00:00:00
Kalpataru CrestKalpataru Gardens Pvt. Ltd.Cts No 283A-Part Of Village Bhandup31-12-2019 00:00:00
Project Details
  • Project:
    Horizon
  • Location:
  • Survey 77 Part I, City Survey No304a - 1-4
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2020
Developer Details

  • Developer:
    Ajanta Airavat Infrastructure Limited Liability Partnership
  • Phone:
  • Address:
  • Horizon
Project RERA Details
MAHA REARA No: P51800013296
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ashish Bhatt & Associate
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Dec 2020
Revised Possession 30 Dec 2020
Extended Possession 30 Nov 2025
Litigations No Litigations
Last Modified 30 Dec 2024
Last Retrived 26 Jul 2025
Horizon QR Code
Horizon
MahaRERA - P51800013296
Apartment Details & Configuration
TypeArea
2 BHK57.88 Sq.mts. ( 623 Sq.ft. )
2 BHK58.53 Sq.mts. ( 630 Sq.ft. )
2 BHK58.71 Sq.mts. ( 632 Sq.ft. )
1 BHK38.93 Sq.mts. ( 419 Sq.ft. )
1 BHK39.02 Sq.mts. ( 420 Sq.ft. )
1.5 BHK49.05 Sq.mts. ( 528 Sq.ft. )
1.5 Bhk49.24 Sq.mts. ( 530 Sq.ft. )
1.5 BHK48.87 Sq.mts. ( 526 Sq.ft. )
1 BHK38.65 Sq.mts. ( 416 Sq.ft. )
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )
2 BHK55.34 Sq.mts. ( 596 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Horizonlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting
Water Supply
-
Buildings / Wings in Horizon
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Horizon by Ajanta Airavat Infrastructure Limited Liability Partnershiplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

55027 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

287 apartments in total
Total
287
Booked
79
Available
208

Saleable Area Statistics (Sq. ft.)

148259 Total
Total
148259
Booked
42336
Available
105924
Total 287 apartments in project. 79 apartments booked. 27% apartments booked.
Total 148259 Sq.ft. saleable area. 42336 saleable area booked.
29% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMar 20232110101313
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.88 Sq.mts. ( 623 Sq.ft. )17
8 Booked47% Booked
47% Booked
2 BHK58.53 Sq.mts. ( 630 Sq.ft. )44
18 Booked40% Booked
40% Booked
2 BHK58.71 Sq.mts. ( 632 Sq.ft. )16
7 Booked43% Booked
43% Booked
77 total apartments / 33 apartments booked. 42% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress85% done
85% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMar 2023211010121
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.93 Sq.mts. ( 419 Sq.ft. )27
15 Booked55% Booked
55% Booked
1 BHK39.02 Sq.mts. ( 420 Sq.ft. )10
10 Booked100% Booked
100% Booked
1.5 BHK49.05 Sq.mts. ( 528 Sq.ft. )33
14 Booked42% Booked
42% Booked
1.5 Bhk49.24 Sq.mts. ( 530 Sq.ft. )7
7 Booked100% Booked
100% Booked
77 total apartments / 46 apartments booked. 59% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress62% done
62% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 2023211010131
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.93 Sq.mts. ( 419 Sq.ft. )38
None Booked0% Booked
0% Booked
1.5 BHK48.87 Sq.mts. ( 526 Sq.ft. )20
None Booked0% Booked
0% Booked
1.5 BHK49.05 Sq.mts. ( 528 Sq.ft. )20
None Booked0% Booked
0% Booked
78 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
work-in-progress50% done
50% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress50% done
50% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress50% done
50% Booked
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMar 2023201010121
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.65 Sq.mts. ( 416 Sq.ft. )26
None Booked0% Booked
0% Booked
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )1
None Booked0% Booked
0% Booked
1.5 BHK48.87 Sq.mts. ( 526 Sq.ft. )25
None Booked0% Booked
0% Booked
2 BHK55.34 Sq.mts. ( 596 Sq.ft. )3
None Booked0% Booked
0% Booked
55 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Ajanta Airavat Infrastructure Limited Liability Partnership
for Project
Horizon
last updated on 26 Jul 2025 as per information obtained from MARA RERA.