Project overview

Hitesh Devesh Paradise is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017184. Hitesh Devesh Paradise is located at S No 85 H No 3P Plot 3, 4. This is a New being developed by Jai Ambe Construction.

Hitesh Devesh Paradise has 1 BHK Apartments with carpet areas ranging from 304 to 332 Sq.ft. Carpet. The Project has total 33 of which 7 are currently available for sale.

Hitesh Devesh Paradise is being developed on a total land area of 7623 Sq.ft. Hitesh Devesh Paradise has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Hitesh Devesh Paradise
  • Location:
  • S No 85 H No 3P Plot 3, 4
  • Const. Stage:
    New
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Jai Ambe Construction
  • Phone:
  • Address:
  • Vinayakeshwar Complex
Project RERA Details
MAHA REARA No: P51700017184
Project Type Residential / Group Housing
RERA Project Status New
Architect Pramod V Patil & Associates
Funding Bank FEDERAL BANK
Proposed Possession 30 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Jan 2022
Last Retrived 26 Jul 2025
Hitesh Devesh Paradise QR Code
Hitesh Devesh Paradise
MahaRERA - P51700017184
Apartment Details & Configuration
TypeArea
1 BHK26.44 Sq.mts. ( 285 Sq.ft. )
1 BHK27.46 Sq.mts. ( 296 Sq.ft. )
1RK20.84 Sq.mts. ( 224 Sq.ft. )
2 BHK38.61 Sq.mts. ( 416 Sq.ft. )
SHOP5.64 Sq.mts. ( 61 Sq.ft. )
SHOP6.23 Sq.mts. ( 67 Sq.ft. )
SHOP8.61 Sq.mts. ( 93 Sq.ft. )
SHOP11.32 Sq.mts. ( 122 Sq.ft. )
1 BHK28.25 Sq.mts. ( 304 Sq.ft. )
1 BHK29.22 Sq.mts. ( 315 Sq.ft. )
1 BHK30.81 Sq.mts. ( 332 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hitesh Devesh Paradiselast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
At Time Of Completion
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
At Time Of Completion
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
In Progress
Water Supply
After Completion
Buildings / Wings in Hitesh Devesh Paradise
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hitesh Devesh Paradise by Jai Ambe Constructionlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

7623 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

33 apartments in total
Total
33
Booked
26
Available
7

Saleable Area Statistics (Sq. ft.)

9717 Total
Total
9717
Booked
7317
Available
2400
Total 33 apartments in project. 26 apartments booked. 78% apartments booked.
Total 9717 Sq.ft. saleable area. 7317 saleable area booked.
75% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.44 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK27.46 Sq.mts. ( 296 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK20.84 Sq.mts. ( 224 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK38.61 Sq.mts. ( 416 Sq.ft. )5
3 Booked60% Booked
60% Booked
SHOP5.64 Sq.mts. ( 61 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP6.23 Sq.mts. ( 67 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.61 Sq.mts. ( 93 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.32 Sq.mts. ( 122 Sq.ft. )1
1 Booked100% Booked
100% Booked
18 total apartments / 16 apartments booked. 88% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.25 Sq.mts. ( 304 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK29.22 Sq.mts. ( 315 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK30.81 Sq.mts. ( 332 Sq.ft. )5
4 Booked80% Booked
80% Booked
15 total apartments / 10 apartments booked. 66% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jai Ambe Construction
for Project
Hitesh Devesh Paradise
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation