Project overview

Hiraco Eminence Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008104. Hiraco Eminence Phase 2 is located at 1723 To 1726, 1793. This is a Ongoing being developed by Kashimira Ceramic Products Llp.

Hiraco Eminence Phase 2 has RESIDENTIAL Apartments with carpet areas ranging from 41329 to 41329 Sq.ft. Carpet. The Project has total 198 of which 44 are currently available for sale.

Hiraco Eminence Phase 2 is being developed on a total land area of 93543 Sq.ft. out of which 13330 Sq.ft. i.e 14% is reserved for recreational purposes. Hiraco Eminence Phase 2 has 3 Wings / Towers A Wing,B Wing,C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Hiraco Eminence Phase 2
  • Location:
  • 1723 To 1726, 1793
  • Const. Stage:
    Ongoing
  • Possession:
    30 Sep 2020
Developer Details

  • Developer:
    Kashimira Ceramic Products Llp
  • Phone:
  • Address:
  • Kashimira Ceramic Products Llp
Project RERA Details
MAHA REARA No: P51800008104
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ar.Dilipkumar Mevada
Funding Bank AXIS BANK
Proposed Possession 30 Sep 2020
Revised Possession 30 Sep 2020
Extended Possession
Litigations No Litigations
Last Modified 25 Jul 2018
Last Retrived 26 Jul 2025
Hiraco Eminence Phase 2 QR Code
Hiraco Eminence Phase 2
MahaRERA - P51800008104
Apartment Details & Configuration
TypeArea
RESIDENTIAL3839.59 Sq.mts. ( 41329 Sq.ft. )
RESIDENTIAL4096.54 Sq.mts. ( 44095 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hiraco Eminence Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Nil
Community Buildings
Nil
Electrical Meter Room, Sub-Station, Receiving Station
Nil
Energy management
Na
Fire Protection And Fire Safety Requirements
Nil
Landscaping & Tree Planting
Nil
Open Parking
Nil
Sewerage (Chamber, Lines, Septic Tank , STP)
Nil
Solid Waste Management And Disposal
Nil
Storm Water Drains
Nil
Street Lighting
Nil
Treatment And Disposal Of Sewage And Sullage Water
Nil
Water Conservation, Rain water Harvesting
Nil
Water Supply
Nil
Buildings / Wings in Hiraco Eminence Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hiraco Eminence Phase 2 by Kashimira Ceramic Products Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

93543 Sq. ft.

Project Area

13330 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

198 apartments in total
Total
198
Booked
154
Available
44

Saleable Area Statistics (Sq. ft.)

8371286 Total
Total
8371286
Booked
6500244
Available
1871042
Total 198 apartments in project. 154 apartments booked. 77% apartments booked.
Total 8371286 Sq.ft. saleable area. 6500244 saleable area booked.
78% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJan 19001110121743
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL3839.59 Sq.mts. ( 41329 Sq.ft. )65
56 Booked86% Booked
86% Booked
65 total apartments / 56 apartments booked. 86% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress55% done
55% Booked
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
work-in-progress90% done
90% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 19001210121743
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL4096.54 Sq.mts. ( 44095 Sq.ft. )68
49 Booked72% Booked
72% Booked
68 total apartments / 49 apartments booked. 72% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress55% done
55% Booked
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
work-in-progress90% done
90% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingJan 19001110121641
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL3839.59 Sq.mts. ( 41329 Sq.ft. )65
49 Booked75% Booked
75% Booked
65 total apartments / 49 apartments booked. 75% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress55% done
55% Booked
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
work-in-progress90% done
90% Booked
Channel Partners
Channel Partners Registered by Developer
Kashimira Ceramic Products Llp
for Project
Hiraco Eminence Phase 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.