Project overview

Hiraco Eminence Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008105. Hiraco Eminence Phase 1 is located at 1442 To 1446, 1491 To 1511, 1586, 1589 To 1600, 1629, 1630, 1646 To 1652. This is a Ongoing being developed by Kashimira Ceramic Products Llp.

Hiraco Eminence Phase 1 has RESIDENTIAL Apartments with carpet areas ranging from 36239 to 36239 Sq.ft. Carpet. The Project has total 381 of which 0 are currently available for sale.

Hiraco Eminence Phase 1 is being developed on a total land area of 157181 Sq.ft. out of which 22127 Sq.ft. i.e 14% is reserved for recreational purposes. Hiraco Eminence Phase 1 has 5 Wings / Towers A Wing,B Wing,C Wing,D Wing,E Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Hiraco Eminence Phase 1
  • Location:
  • 1442 To 1446, 1491 To 1511, 1586, 1589 To 1600, 1629, 1630, 1646 To 1652
  • Const. Stage:
    Ongoing
  • Possession:
    30 Sep 2020
Developer Details

  • Developer:
    Kashimira Ceramic Products Llp
  • Phone:
  • Address:
  • Kashimira Ceramic Products Llp
Project RERA Details
MAHA REARA No: P51800008105
Project Type Others
RERA Project Status Ongoing
Architect Ar.Dilipkumar Mevada
Funding Bank AXIS BANK
Proposed Possession 30 Sep 2020
Revised Possession 30 Sep 2020
Extended Possession
Litigations No Litigations
Last Modified 25 Jul 2018
Last Retrived 26 Jul 2025
Hiraco Eminence Phase 1 QR Code
Hiraco Eminence Phase 1
MahaRERA - P51800008105
Apartment Details & Configuration
TypeArea
RESIDENTIAL3361.66 Sq.mts. ( 36185 Sq.ft. )
RESIDENTIAL3750.88 Sq.mts. ( 40374 Sq.ft. )
RESIDENTIAL4237.38 Sq.mts. ( 45611 Sq.ft. )
RESIDENTIAL3366.7 Sq.mts. ( 36239 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hiraco Eminence Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Nil
Community Buildings
Nil
Electrical Meter Room, Sub-Station, Receiving Station
Nil
Energy management
Na
Fire Protection And Fire Safety Requirements
Nil
Landscaping & Tree Planting
Nil
Open Parking
Nil
Sewerage (Chamber, Lines, Septic Tank , STP)
Nil
Solid Waste Management And Disposal
Nil
Storm Water Drains
Nil
Street Lighting
Nil
Treatment And Disposal Of Sewage And Sullage Water
Nil
Water Conservation, Rain water Harvesting
Nil
Water Supply
Nil
Buildings / Wings in Hiraco Eminence Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hiraco Eminence Phase 1 by Kashimira Ceramic Products Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

157181 Sq. ft.

Project Area

22127 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

381 apartments in total
Total
381
Booked
381
Available
0

Saleable Area Statistics (Sq. ft.)

15049013 Total
Total
15049013
Booked
15049013
Available
0
Total 381 apartments in project. 381 apartments booked. 100% apartments booked.
Total 15049013 Sq.ft. saleable area. 15049013 saleable area booked.
100% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJan 19001810121047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL3361.66 Sq.mts. ( 36185 Sq.ft. )86
86 Booked100% Booked
100% Booked
86 total apartments / 86 apartments booked. 100% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress80% done
80% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 19001810121047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL3750.88 Sq.mts. ( 40374 Sq.ft. )68
68 Booked100% Booked
100% Booked
68 total apartments / 68 apartments booked. 100% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress80% done
80% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingJan 19001810121047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL4237.38 Sq.mts. ( 45611 Sq.ft. )73
73 Booked100% Booked
100% Booked
73 total apartments / 73 apartments booked. 100% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress80% done
80% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingJan 19001810121047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL3750.88 Sq.mts. ( 40374 Sq.ft. )68
68 Booked100% Booked
100% Booked
68 total apartments / 68 apartments booked. 100% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress80% done
80% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingJan 19001810121047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL3366.7 Sq.mts. ( 36239 Sq.ft. )86
86 Booked100% Booked
100% Booked
86 total apartments / 86 apartments booked. 100% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress80% done
80% Booked
Channel Partners
Channel Partners Registered by Developer
Kashimira Ceramic Products Llp
for Project
Hiraco Eminence Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation