Project overview

Himbindu is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003502. Himbindu is located at 292/21 To 30, 292 Pt. This is a Ongoing being developed by M/S. Sahajanand Developers.

Himbindu has 1 RK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 1081 to 729 Sq.ft. Carpet. The Project has total 29 of which 6 are currently available for sale.

Himbindu is being developed on a total land area of 8775 Sq.ft. Himbindu has 1 Wings / Towers Himbindu

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Himbindu
  • Location:
  • 292/21 To 30, 292 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    M/S. Sahajanand Developers
  • Phone:
  • Address:
  • Palm Spring Centre
Project RERA Details
MAHA REARA No: P51800003502
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect M/S. B.S.Barot
Funding Bank STATE BANK OF INDIA
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 30 May 2022
Litigations No Litigations
Last Modified 08 Sep 2021
Last Retrived 26 Jul 2025
Himbindu QR Code
Himbindu
MahaRERA - P51800003502
Apartment Details & Configuration
TypeArea
1 RK37.31 Sq.mts. ( 402 Sq.ft. )
2 BHK67.66 Sq.mts. ( 728 Sq.ft. )
2 BHK67.75 Sq.mts. ( 729 Sq.ft. )
3 BHK100.46 Sq.mts. ( 1081 Sq.ft. )
3 BHK100.82 Sq.mts. ( 1085 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Himbindulast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electrical Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Fire Dept Noc
Landscaping & Tree Planting
Only Tree Plantation
Open Parking
2
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Provided Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting
Water Supply
Will Be Provided Before Oc
Buildings / Wings in Himbindu
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Himbindu by M/S. Sahajanand Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8775 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

29 apartments in total
Total
29
Booked
23
Available
6

Saleable Area Statistics (Sq. ft.)

26113 Total
Total
26113
Booked
20329
Available
5784
Total 29 apartments in project. 23 apartments booked. 79% apartments booked.
Total 26113 Sq.ft. saleable area. 20329 saleable area booked.
78% area booked.

Himbindu

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
HimbinduDec 2018131010219
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK37.31 Sq.mts. ( 402 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.66 Sq.mts. ( 728 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.75 Sq.mts. ( 729 Sq.ft. )12
10 Booked83% Booked
83% Booked
3 BHK100.46 Sq.mts. ( 1081 Sq.ft. )12
8 Booked66% Booked
66% Booked
3 BHK100.82 Sq.mts. ( 1085 Sq.ft. )3
3 Booked100% Booked
100% Booked
29 total apartments / 23 apartments booked. 79% apartments booked.
Work Description in Building HimbinduCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress48% done
48% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Sahajanand Developers
for Project
Himbindu
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation