Project overview

Hill View Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000010578. Hill View Residency is located at Survey No.2, Hissa No 3 ,5C. This is a Ongoing being developed by Sai Krupa Developers.

Hill View Residency has 1 BHK & 1 RK Apartments with carpet areas ranging from 210 to 304 Sq.ft. Carpet. The Project has total 69 of which 64 are currently available for sale.

Hill View Residency is being developed on a total land area of 23466 Sq.ft. Hill View Residency has 4 Wings / Towers Iris A-Wing,Iris B-Wing,Iris C-Wing,Iris D-Wing

ProjectDeveloperLocationPossession
Green AbodeChirag Kirit ShahPlot No 8 Out Of 746/1A 746/1B 746/2B 746/1B 1C 746/2A31-12-2017 00:00:00
SelenePersipina Developers Private Limited67/0 Part, 68/0 Part30-03-2023 00:00:00
OrionPersipina Developers Private Limited65/1 B Part, 65/2 Part, 67/0 Part30-04-2023 00:00:00
Kanha PlatinumKanha DevelopersPlot No 21731-03-2019 00:00:00
R N AvenueR N Builders1331-12-2017 00:00:00
Swami ArcadeVertical SpacesPlot No 8931-03-2018 00:00:00
Alankaar ResidencyS P Developers22, 22/1 And 8/A130-12-2022 00:00:00
V Balaji BlessV RealityPlot No 3531-05-2019 00:00:00
Yogeshwar Krupa ChsJalaram Associates5630-06-2022 00:00:00
Lamer SolitaireLamer DevelopersPlot No 4131-03-2018 00:00:00
BellezaSaomya Fortune Infra Ventures410206, Raigarh31-12-2015 00:00:00
River ViewMango Homes6230-11-2020 00:00:00
ClioPersipina Developers Private Limited57/1 Part28-10-2020 00:00:00
AuroraPersipina Developers Private Limited57/2 Part, 58/1 A Part30-11-2020 00:00:00
MellonaPersipina Developers Private Limited57/1 Part 59/0 Part28-10-2020 00:00:00
HeliosPersipina Developers Private Limited59/0 Part30-11-2020 00:00:00
AtlasPersipina Developers Private Limited58/1 A Part27-02-2020 00:00:00
AuraPersipina Developers Private Limited57/2 Part 58/1 B Part29-11-2020 00:00:00
ArgusPersipina Developers Private Limited57/1 Part29-11-2020 00:00:00
HermesPersipina Developers Private Limited59/0 Part27-02-2020 00:00:00
MinervaPersipina Developers Private Limited58/1 A Part29-09-2020 00:00:00
Shivam PlazaSeven HeavenPlot No 15130-12-2020 00:00:00
Ritu EnclaveRituraj DevelopersPlot.No.5328-11-2021 00:00:00
ShamalMorajkar Estates Llp21430-06-2022 00:00:00
Ratan VillaTulsi Constructions CompanyPlot No 50/231-03-2019 00:00:00
Krishna DhamLandmark ConstructionPlot No 8931-03-2018 00:00:00
Bankers Tower Co Op Hsg SoBankers Tower Chs3231-12-2017 00:00:00
Retail APersipina Developers Private Limited57/2 Part 58/1 A Part 58/1 B 30-12-2021 00:00:00
Neel Riddhi EmeraldNeel Riddhi EmeraldFinal Plot No 527 B31-03-2019 00:00:00
ZeusPersipina Developers Private Limited68/0 Part30-04-2023 00:00:00
Sai RadiancePrasad EstateFinal Plot No 3331-10-2018 00:00:00
Future HeightsFuture Homes ConstructionsRaigarh, 41020631-03-2021 00:00:00
Hari Om Nagar ChsVastu Infra Builders & Developers119-5/6/730-06-2019 00:00:00
Deep Devansh-3Sambhav Arena LlpPlot No 115 Sector R230-09-2020 00:00:00
Deep Devansh - 2Sambhav Buildcon77 / R130-09-2020 00:00:00
Jindal ResidencyJindal Builders And DevelopersSurvey No 745-130-12-2023 00:00:00
Building No. 1 , Uptown AvenueSimran EnterprisesSurvey No. 743/2,3A30-12-2022 00:00:00
ObeliskShree Chinmay Gaurang InfrastructureSub Plot No. 11, Survey No.746/1A,746/1B30-03-2024 00:00:00
Hill View ResidencySai Krupa DevelopersSurvey No.2, Hissa No 3 ,5C31-12-2018 00:00:00
Sabhari Co-Op Hsg SocietyShubham EnterprisesPlot No.23020-05-2018 00:00:00
Sai SrushtiOm Construction And Developers7 1 C31-12-2019 00:00:00
VestaPersipina Developers Private Limited66/0 Part 67/0 Part30-04-2023 00:00:00
ArtemisPersipina Developers Private Limited67/0 Part30-04-2023 00:00:00
Retail CPersipina Developers Private Limited67/0 Part, 68/0 Part30-03-2022 00:00:00
HeraPersipina Developers Private Limited66/0 Part30-04-2023 00:00:00
FloraPersipina Developers Private Limited67/0 Part, 68/0 Part30-03-2023 00:00:00
VenusPersipina Developers Private Limited65/1 B Part, 66 Part And 67 Part30-04-2023 00:00:00
Sonibai NiwasAnant Nathu GavandPlot No 7630-12-2020 00:00:00
Satyam VistaSatyam GroupPlot-73, Sector-3, Karanjade28-11-2022 00:00:00
Apex ShukanApex BuildconPlot No 62 Sector R4 Pushpak Vadghar30-12-2022 00:00:00
Aarish HeightsDilshad Mushtaq Patel17431-03-2024 00:00:00
Vastu MoryaVastushilp ConstructionsFinal Plot No -76/1, 76/230-04-2026 00:00:00
Saikunj Co-Operative Hsg SocietyRoyal EnterprisesPlot No 2031-05-2024 00:00:00
Sai NiwasMedaparampil Gangadharan SadashivanB-54, Sector-19B, Ulwe31-12-2018 00:00:00
Sai Samartha BlessingsShree Sai Samartha Developers1142,114331-12-2017 00:00:00
Aaiji BlissShri Ganesh Developers11231-12-2019 00:00:00
Dudhe VitevariSurekha Tukaram DudhePlot No 131-12-2019 00:00:00
Aishwarya AppartmentGlamour BuildersPlot No B-3030-12-2020 00:00:00
Pote SolitaireVishwas Gajanan PoteSurvey No.-472/1, 472/2, 748/231-05-2026 00:00:00
Krushna ApartmentDatta Krupa EnterprisesPlot No -12030-12-2022 00:00:00
Saraswati KunjShree Saraswati Builders And DevelopersPlot No-2830-04-2023 00:00:00
Ganeshmurti ApartmentNoor Mohammed Idris Jalgaonkar14930-12-2022 00:00:00
Aaditya Om Sai PrasadAaditya Infrastructures Private LimitedFinal Plot No 195 Sub Plot 131-12-2026 00:00:00
Munot Vastu Exotica -CommercialVastu InfrastructureFinal Plot No. 16/331-03-2027 00:00:00
Shree Guru Ashish Co Op Hsg Society LtdWe Grow Constructions662/A 662/B/1 662/B/230-09-2025 00:00:00
Tulsi Sonata Tulsi ConstructionsPlot No 1 Survey No 797/131-07-2018 00:00:00
Lamer ResidencyLamer Developers485 H No 1 And 231-03-2018 00:00:00
Deep DestinySambhav RealtyPlot No 33 Sector 2A30-09-2020 00:00:00
V VastuAtharva DevelopersPlot No 930-09-2020 00:00:00
Deep Devansh - 4Sambhav AbodePlot No 13230-12-2021 00:00:00
HiramanBashir Miskin ShahPlot No 10931-12-2019 00:00:00
Vaishnavi ResidencyRk Group Of InfraPlot No 11830-06-2023 00:00:00
Kaveri HeightsPradeep Ratan Patil50 1001-12-2025 00:00:00
Geetanjali Beauty Tower ChslJ M M HomesFinal Plot No - 26431-12-2024 00:00:00
MohneshMotwani International ServicesPlot No 13931-12-2019 00:00:00
Saptashrungi ApartmentPradeep Ratan Patil81/231-12-2018 00:00:00
Chalat Group Builders And DevelopersSuvarna Shaji ChalatPlot No 5331-10-2019 00:00:00
Jaguar HeightsRupesh DhumalPlot No 81 Sector R4 Pushpak Node Vadghar28-02-2024 00:00:00
Nilesh PalaceVighnaharta DevelopersPlot No. 1930-09-2024 00:00:00
VighnahartaVighnaharta Developers76/R431-10-2024 00:00:00
Jindal AvenueJindal Builders And DevelopersS.No 796/A,B,C31-12-2024 00:00:00
Shree Aaditya AkshayArvind Mahadev SawlekarCts No 62831-12-2025 00:00:00
Yakub Kachchi HeightsBuild Well Enterprises51231-12-2024 00:00:00
Lotus ApartmentMukesh Shrinath Sharma20430-06-2019 00:00:00
Jayshree RamRachana ConstructionCts Number - 941,96030-03-2022 00:00:00
GaurisutaSai Developers743/130-03-2023 00:00:00
AjinkyaNeelkanth Associates1552/A,B15-12-2021 00:00:00
Green AppleShree Sai Enterprises11230-12-2022 00:00:00
Mangalmurti KrupaMangalmurti Constructions531C And 531B18-07-2022 00:00:00
Keru Mata NiwasShree Ambika Builders & DevelopersPlot No 11530-10-2020 00:00:00
Ambika Niwas Lumbaram Modaram Patel24030-12-2021 00:00:00
Shree Ganesh PlazaPratik Arjunconstruction And Company12930-09-2020 00:00:00
Matrubhumi HeightsShree Ganesh DevelopersPlot No. 03, Sector- R116-06-2026 00:00:00
Laxmi Raghunath NiwasElegance BuildconC. T. S No. - 831, 831 / 1, 831 / 231-12-2025 00:00:00
ChaitrabanPinnacle Builders And DevelopersFinal Plot No. 21, Sub Plot No. 231-12-2024 00:00:00
Ganga HeightsShri Ram DevelopersPlot No - 296A30-10-2023 00:00:00
Omkar VillaAniket Tanaji ChavanPlot No 12330-12-2022 00:00:00
Sai NiwasVighnaharta Homes630-04-2023 00:00:00
SharnamMilcy EnterprisesR1-13230-12-2021 00:00:00
Project Details
  • Project:
    Hill View Residency
  • Location:
  • Survey No.2, Hissa No 3 ,5C
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Sai Krupa Developers
  • Phone:
  • Address:
  • Satra Plaza
Project RERA Details
MAHA REARA No: P52000010578
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Triarch Design Studio
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 19 Mar 2019
Last Retrived 28 Jul 2025
Hill View Residency QR Code
Hill View Residency
MahaRERA - P52000010578
Apartment Details & Configuration
TypeArea
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )
1 BHK28.64 Sq.mts. ( 308 Sq.ft. )
1 BHK28.65 Sq.mts. ( 308 Sq.ft. )
1 RK20.99 Sq.mts. ( 226 Sq.ft. )
1 RK21.48 Sq.mts. ( 231 Sq.ft. )
1 BHK27.99 Sq.mts. ( 301 Sq.ft. )
1 BHK28.16 Sq.mts. ( 303 Sq.ft. )
1 BHK28.71 Sq.mts. ( 309 Sq.ft. )
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )
1 RK22.25 Sq.mts. ( 239 Sq.ft. )
1 BHK27.31 Sq.mts. ( 294 Sq.ft. )
1 BHK27.4 Sq.mts. ( 295 Sq.ft. )
1 BHK27.62 Sq.mts. ( 297 Sq.ft. )
1 BHK27.64 Sq.mts. ( 298 Sq.ft. )
1 BHK27.66 Sq.mts. ( 298 Sq.ft. )
1 BHK28.2 Sq.mts. ( 304 Sq.ft. )
1 RK19.49 Sq.mts. ( 210 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hill View Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp
Solid Waste Management And Disposal
Na
Storm Water Drains
Work In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work In Progress
Water Supply
Work In Progress
Buildings / Wings in Hill View Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hill View Residency by Sai Krupa Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

23466 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

69 apartments in total
Total
69
Booked
5
Available
64

Saleable Area Statistics (Sq. ft.)

20005 Total
Total
20005
Booked
1297
Available
18707
Total 69 apartments in project. 5 apartments booked. 7% apartments booked.
Total 20005 Sq.ft. saleable area. 1297 saleable area booked.
6% area booked.

Iris A-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Iris A-WingJan 19004101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK28.64 Sq.mts. ( 308 Sq.ft. )3
1 Booked33% Booked
33% Booked
1 BHK28.65 Sq.mts. ( 308 Sq.ft. )3
None Booked0% Booked
0% Booked
1 RK20.99 Sq.mts. ( 226 Sq.ft. )3
None Booked0% Booked
0% Booked
12 total apartments / 1 apartments booked. 8% apartments booked.
Work Description in Building Iris A-WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Iris B-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Iris B-WingJan 19004101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.64 Sq.mts. ( 308 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK28.65 Sq.mts. ( 308 Sq.ft. )3
None Booked0% Booked
0% Booked
1 RK21.48 Sq.mts. ( 231 Sq.ft. )3
2 Booked66% Booked
66% Booked
12 total apartments / 2 apartments booked. 16% apartments booked.
Work Description in Building Iris B-WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Iris C-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Iris C-WingJan 19004101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.99 Sq.mts. ( 301 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK28.16 Sq.mts. ( 303 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK28.71 Sq.mts. ( 309 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )3
1 Booked33% Booked
33% Booked
1 RK22.25 Sq.mts. ( 239 Sq.ft. )3
None Booked0% Booked
0% Booked
21 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building Iris C-WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Iris D-Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Iris D-WingJan 19004101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.31 Sq.mts. ( 294 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.4 Sq.mts. ( 295 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.62 Sq.mts. ( 297 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.64 Sq.mts. ( 298 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.66 Sq.mts. ( 298 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK28.2 Sq.mts. ( 304 Sq.ft. )3
None Booked0% Booked
0% Booked
1 RK19.49 Sq.mts. ( 210 Sq.ft. )3
1 Booked33% Booked
33% Booked
24 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building Iris D-WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Sai Krupa Developers
for Project
Hill View Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation