Project overview

Highland Haven Building 7G Mist-A Phase 6 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700004403. Highland Haven Building 7G Mist-A Phase 6 is located at S. N. 75/5. This is a Ongoing being developed by Siddhi Krish Developers.

Highland Haven Building 7G Mist-A Phase 6 has 1 BHK TYPE 1, 1 BHK TYPE 2, 2 BHK TYPE 1 & 2 BHK TYPE 2 Apartments with carpet areas ranging from 445 to 620 Sq.ft. Carpet. The Project has total 178 of which 148 are currently available for sale.

Highland Haven Building 7G Mist-A Phase 6 is being developed on a total land area of 24230 Sq.ft. out of which 4445 Sq.ft. i.e 18% is reserved for recreational purposes. Highland Haven Building 7G Mist-A Phase 6 has 1 Wings / Towers Building 7G- Mist A

ProjectDeveloperLocationPossession
Shree Siddhivinayak EnterprisesShree Siddhivinayak Enterprises309,311 To 317, 321,32401-12-2018 00:00:00
Kaveri KrishnaShree Shakti Developers235 236/131-12-2017 00:00:00
Highland Haven Building 6F Mist-B Phase 5Siddhi Krish DevelopersS. N. 75/5, 75/630-12-2024 00:00:00
Project Details
  • Project:
    Highland Haven Building 7G Mist-A Phase 6
  • Location:
  • S. N. 75/5
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Siddhi Krish Developers
  • Phone:
  • Address:
  • Lake City Mall
Project RERA Details
MAHA REARA No: P51700004403
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Jitesh P Pawar And Associates
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Last Modified 09 Aug 2017
Last Retrived 26 Jul 2025
Highland Haven Building 7G Mist-A Phase 6 QR Code
Highland Haven Building 7G Mist-A Phase 6
MahaRERA - P51700004403
Apartment Details & Configuration
TypeArea
1 BHK TYPE 141.34 Sq.mts. ( 445 Sq.ft. )
1 BHK TYPE 241.81 Sq.mts. ( 450 Sq.ft. )
2 BHK TYPE 156.67 Sq.mts. ( 610 Sq.ft. )
2 BHK TYPE 257.6 Sq.mts. ( 620 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Highland Haven Building 7G Mist-A Phase 6last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Layout
Energy management
As Per Layout
Fire Protection And Fire Safety Requirements
As Per Layout
Landscaping & Tree Planting
As Per Layout
Open Parking
As Per Layout
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Layout
Solid Waste Management And Disposal
As Per Layout
Storm Water Drains
As Per Layout
Street Lighting
As Per Layout
Treatment And Disposal Of Sewage And Sullage Water10% completed
10% Complete
As Per Layout
Water Conservation, Rain water Harvesting
As Per Layout
Water Supply
As Per Layout
Buildings / Wings in Highland Haven Building 7G Mist-A Phase 6
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Highland Haven Building 7G Mist-A Phase 6 by Siddhi Krish Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

24230 Sq. ft.

Project Area

4445 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

178 apartments in total
Total
178
Booked
30
Available
148

Saleable Area Statistics (Sq. ft.)

89872 Total
Total
89872
Booked
15250
Available
74621
Total 178 apartments in project. 30 apartments booked. 16% apartments booked.
Total 89872 Sq.ft. saleable area. 15250 saleable area booked.
17% area booked.

Building 7G- Mist A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 7G- Mist ADec 20233110111300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 141.34 Sq.mts. ( 445 Sq.ft. )60
12 Booked20% Booked
20% Booked
1 BHK TYPE 241.81 Sq.mts. ( 450 Sq.ft. )57
2 BHK TYPE 156.67 Sq.mts. ( 610 Sq.ft. )30
6 Booked20% Booked
20% Booked
2 BHK TYPE 257.6 Sq.mts. ( 620 Sq.ft. )31
178 total apartments / 30 apartments booked. 16% apartments booked.
Work Description in Building Building 7G- Mist ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked
Channel Partners
Channel Partners Registered by Developer
Siddhi Krish Developers
for Project
Highland Haven Building 7G Mist-A Phase 6
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation