Project overview

Highland Haven Building 6F Mist-B Phase 5 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005341. Highland Haven Building 6F Mist-B Phase 5 is located at S. N. 75/5, 75/6. This is a Ongoing being developed by Siddhi Krish Developers.

Highland Haven Building 6F Mist-B Phase 5 has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 1092 to 900 Sq.ft. Carpet. The Project has total 378 of which 378 are currently available for sale.

Highland Haven Building 6F Mist-B Phase 5 is being developed on a total land area of 22850 Sq.ft. out of which 10581 Sq.ft. i.e 46% is reserved for recreational purposes. Highland Haven Building 6F Mist-B Phase 5 has 1 Wings / Towers Building 6F- Mist B

ProjectDeveloperLocationPossession
Apollo RetailMacrotech Developers Limited11Pt, 85/8Pt, 85/4Pt30-09-2020 00:00:00
The Icon Phase 1Leading Frontier Private LimitedSurvey No 60/18,60/19,Survey No 61/2A To 61/2F, 61/3,62/3,62/5E,62/6,62/7,62/9C30-12-2022 00:00:00
Runwal Garden City - DahliaRunwal Developers Private LimitedSurvey Nos As Documented30-06-2018 00:00:00
Casa Royale - GrandeLodha Buildcon Private Ltd (Lodha Develoopers Pvt Ltd)161/1A/3P31-01-2018 00:00:00
Dosti Westcounty- Phase 2- Dosti CedarDosti EnterprisesSr No 17/6P, 19/43P, 25/13A,49/1P, 17/3P, 17/5P, 17/9P, 17/14P, 17/10P30-12-2023 00:00:00
Dosti Westcounty-Phase 3-Dosti WestwoodDosti EnterprisesSurvey Nos. 49/7A P30-12-2026 00:00:00
Project Details
  • Project:
    Highland Haven Building 6F Mist-B Phase 5
  • Location:
  • S. N. 75/5, 75/6
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Siddhi Krish Developers
  • Phone:
  • Address:
  • Lake City Mall
Project RERA Details
MAHA REARA No: P51700005341
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Jitesh P Pawar And Associates
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession 31 Dec 2029
Litigations No Litigations
Last Modified 02 Aug 2023
Last Retrived 26 Jul 2025
Highland Haven Building 6F Mist-B Phase 5 QR Code
Highland Haven Building 6F Mist-B Phase 5
MahaRERA - P51700005341
Apartment Details & Configuration
TypeArea
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )
2 BHK56.48 Sq.mts. ( 608 Sq.ft. )
2 BHK58.34 Sq.mts. ( 628 Sq.ft. )
Shop66.11 Sq.mts. ( 712 Sq.ft. )
Shop71.73 Sq.mts. ( 772 Sq.ft. )
Shop71.8 Sq.mts. ( 773 Sq.ft. )
Shop74.93 Sq.mts. ( 807 Sq.ft. )
Shop82 Sq.mts. ( 883 Sq.ft. )
Shop83.6 Sq.mts. ( 900 Sq.ft. )
Shop101.45 Sq.mts. ( 1092 Sq.ft. )
Shop126.87 Sq.mts. ( 1366 Sq.ft. )
Shop144.46 Sq.mts. ( 1555 Sq.ft. )
Shop54.57 Sq.mts. ( 587 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Highland Haven Building 6F Mist-B Phase 5last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Layout
Energy management
As Per Layout
Fire Protection And Fire Safety Requirements
As Per Layout
Landscaping & Tree Planting
As Per Layout
Open Parking
As Per Layout
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Layout
Solid Waste Management And Disposal
As Per Layout
Storm Water Drains
As Per Layout
Street Lighting
As Per Layout
Treatment And Disposal Of Sewage And Sullage Water10% completed
10% Complete
As Per Layout
Water Conservation, Rain water Harvesting
As Per Layout
Water Supply
As Per Layout
Buildings / Wings in Highland Haven Building 6F Mist-B Phase 5
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Highland Haven Building 6F Mist-B Phase 5 by Siddhi Krish Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

22850 Sq. ft.

Project Area

10581 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

378 apartments in total
Total
378
Booked
0
Available
378

Saleable Area Statistics (Sq. ft.)

216182 Total
Total
216182
Booked
0
Available
216182
Total 378 apartments in project. 0 apartments booked. 0% apartments booked.
Total 216182 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building 6F- Mist B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 6F- Mist BDec 20234310111310
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.95 Sq.mts. ( 430 Sq.ft. )110
None Booked0% Booked
0% Booked
2 BHK56.48 Sq.mts. ( 608 Sq.ft. )129
None Booked0% Booked
0% Booked
2 BHK58.34 Sq.mts. ( 628 Sq.ft. )129
None Booked0% Booked
0% Booked
Shop66.11 Sq.mts. ( 712 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop71.73 Sq.mts. ( 772 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop71.8 Sq.mts. ( 773 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop74.93 Sq.mts. ( 807 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop82 Sq.mts. ( 883 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop83.6 Sq.mts. ( 900 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop101.45 Sq.mts. ( 1092 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop126.87 Sq.mts. ( 1366 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop144.46 Sq.mts. ( 1555 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop54.57 Sq.mts. ( 587 Sq.ft. )1
None Booked0% Booked
0% Booked
378 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building 6F- Mist BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress75% done
75% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Siddhi Krish Developers
for Project
Highland Haven Building 6F Mist-B Phase 5
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation