Project overview

Highland Haven Building 1A Dew-B Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006850. Highland Haven Building 1A Dew-B Phase 1 is located at S. N. 83/3 Part, 83/1/3 Part. This is a Ongoing being developed by Siddhi Krish Developers.

Highland Haven Building 1A Dew-B Phase 1 has 1.5 BHK, 2 BHK, SHOP TYPE 1, SHOP TYPE 2, SHOP TYPE 3, SHOP TYPE 4, SHOP TYPE 5 & SHOP TYPE 6 Apartments with carpet areas ranging from 200 to 861 Sq.ft. Carpet. The Project has total 94 of which 24 are currently available for sale.

Highland Haven Building 1A Dew-B Phase 1 is being developed on a total land area of 36520 Sq.ft. out of which 4445 Sq.ft. i.e 12% is reserved for recreational purposes. Highland Haven Building 1A Dew-B Phase 1 has 1 Wings / Towers Building 1A- Dew B

ProjectDeveloperLocationPossession
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Shree Siddhivinayak EnterprisesShree Siddhivinayak Enterprises309,311 To 317, 321,32401-12-2018 00:00:00
Paramount FKalpataru Homes Private LimitedSno 115/4/2 Pt 115/5 Pt 115/6 Pt 115/7/2 Pt 115/8/2 Pt 115/10/2 Pt Of Village Majiwade30-09-2024 00:00:00
Rustomjee La Vie Wing AKapstone Constructions Private LimitedPlot No 8A Survey No 329/3 Pt Of Village Majiwade31-12-2028 00:00:00
Project Details
  • Project:
    Highland Haven Building 1A Dew-B Phase 1
  • Location:
  • S. N. 83/3 Part, 83/1/3 Part
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Siddhi Krish Developers
  • Phone:
  • Address:
  • Lake City Mall
Project RERA Details
MAHA REARA No: P51700006850
Project Type Others
RERA Project Status Ongoing
Architect Jitesh P Pawar And Associates
Funding Bank HDFC BANK
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession
Litigations No Litigations
Last Modified 16 Aug 2017
Last Retrived 26 Jul 2025
Highland Haven Building 1A Dew-B Phase 1 QR Code
Highland Haven Building 1A Dew-B Phase 1
MahaRERA - P51700006850
Apartment Details & Configuration
TypeArea
1.5 BHK50.54 Sq.mts. ( 544 Sq.ft. )
2 BHK54.44 Sq.mts. ( 586 Sq.ft. )
SHOP TYPE 170.14 Sq.mts. ( 755 Sq.ft. )
SHOP TYPE 279.99 Sq.mts. ( 861 Sq.ft. )
SHOP TYPE 321.09 Sq.mts. ( 227 Sq.ft. )
SHOP TYPE 418.58 Sq.mts. ( 200 Sq.ft. )
SHOP TYPE 527.69 Sq.mts. ( 298 Sq.ft. )
SHOP TYPE 621.18 Sq.mts. ( 228 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Highland Haven Building 1A Dew-B Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space60% completed
60% Complete
As Per Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
As Per Layout
Energy management80% completed
80% Complete
As Per Layout
Fire Protection And Fire Safety Requirements70% completed
70% Complete
As Per Layout
Landscaping & Tree Planting30% completed
30% Complete
As Per Layout
Open Parking60% completed
60% Complete
As Per Layout
Sewerage (Chamber, Lines, Septic Tank , STP)60% completed
60% Complete
As Per Layout
Solid Waste Management And Disposal15% completed
15% Complete
As Per Layout
Storm Water Drains55% completed
55% Complete
As Per Layout
Street Lighting30% completed
30% Complete
As Per Layout
Treatment And Disposal Of Sewage And Sullage Water70% completed
70% Complete
As Per Layout
Water Conservation, Rain water Harvesting80% completed
80% Complete
As Per Layout
Water Supply60% completed
60% Complete
As Per Layout
Buildings / Wings in Highland Haven Building 1A Dew-B Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Highland Haven Building 1A Dew-B Phase 1 by Siddhi Krish Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

36520 Sq. ft.

Project Area

4445 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

94 apartments in total
Total
94
Booked
70
Available
24

Saleable Area Statistics (Sq. ft.)

52373 Total
Total
52373
Booked
39114
Available
13259
Total 94 apartments in project. 70 apartments booked. 74% apartments booked.
Total 52373 Sq.ft. saleable area. 39114 saleable area booked.
75% area booked.

Building 1A- Dew B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1A- Dew BMar 2019241011970
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK50.54 Sq.mts. ( 544 Sq.ft. )42
30 Booked71% Booked
71% Booked
2 BHK54.44 Sq.mts. ( 586 Sq.ft. )46
38 Booked82% Booked
82% Booked
SHOP TYPE 170.14 Sq.mts. ( 755 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 279.99 Sq.mts. ( 861 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 321.09 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 418.58 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 527.69 Sq.mts. ( 298 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP TYPE 621.18 Sq.mts. ( 228 Sq.ft. )1
1 Booked100% Booked
100% Booked
94 total apartments / 70 apartments booked. 74% apartments booked.
Work Description in Building Building 1A- Dew BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Siddhi Krish Developers
for Project
Highland Haven Building 1A Dew-B Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation