Project overview

Hdil Paradise City Sector 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000012539. Hdil Paradise City Sector 2 is located at S No 942 Pt. This is a Ongoing being developed by Housing Development And Infrastructure Ltd.

Hdil Paradise City Sector 2 has RESIDENTIAL Apartments with carpet areas ranging from 262 to 398 Sq.ft. Carpet. The Project has total 1576 of which 359 are currently available for sale.

Hdil Paradise City Sector 2 is being developed on a total land area of 418492 Sq.ft. Hdil Paradise City Sector 2 has 20 Wings / Towers Building No 1,Building No 10,Building No 11,Building No 12,Building No 13,Building No 14,Building No 15,Building No 16,Building No 17,Building No 18,Building No 19,Building No 2,Building No 20,Building No 3,Building No 4,Building No 5,Building No 6,Building No 7,Building No 8,Building No 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Hdil Paradise City Sector 2
  • Location:
  • S No 942 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Sep 2018
Developer Details

  • Developer:
    Housing Development And Infrastructure Ltd
  • Phone:
  • Address:
  • Hdil Towers
Project RERA Details
MAHA REARA No: P99000012539
Project Type Others
RERA Project Status Ongoing
Architect Ajay Wade & Assocites
Funding Bank
Proposed Possession 30 Sep 2018
Revised Possession 30 Sep 2018
Extended Possession 30 Sep 2019
Litigations No Litigations
Last Modified 24 Sep 2018
Last Retrived 28 Jul 2025
Hdil Paradise City Sector 2 QR Code
Hdil Paradise City Sector 2
MahaRERA - P99000012539
Apartment Details & Configuration
TypeArea
RESIDENTIAL79.7 Sq.mts. ( 858 Sq.ft. )
RESIDENTIAL81.09 Sq.mts. ( 873 Sq.ft. )
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )
COMMERCIAL9.33 Sq.mts. ( 100 Sq.ft. )
COMMERCIAL9.87 Sq.mts. ( 106 Sq.ft. )
COMMERCIAL10.59 Sq.mts. ( 114 Sq.ft. )
COMMERCIAL10.81 Sq.mts. ( 116 Sq.ft. )
COMMERCIAL12.6 Sq.mts. ( 136 Sq.ft. )
COMMERCIAL12.84 Sq.mts. ( 138 Sq.ft. )
COMMERCIAL12.99 Sq.mts. ( 140 Sq.ft. )
COMMERCIAL13.08 Sq.mts. ( 141 Sq.ft. )
COMMERCIAL13.17 Sq.mts. ( 142 Sq.ft. )
COMMERCIAL13.77 Sq.mts. ( 148 Sq.ft. )
COMMERCIAL14.16 Sq.mts. ( 152 Sq.ft. )
COMMERCIAL14.51 Sq.mts. ( 156 Sq.ft. )
COMMERCIAL17.14 Sq.mts. ( 184 Sq.ft. )
COMMERCIAL17.27 Sq.mts. ( 186 Sq.ft. )
RESIDENTIAL25.18 Sq.mts. ( 271 Sq.ft. )
RESIDENTIAL30.34 Sq.mts. ( 327 Sq.ft. )
RESIDENTIAL30.76 Sq.mts. ( 331 Sq.ft. )
RESIDENTIAL40.91 Sq.mts. ( 440 Sq.ft. )
RESIDENTIAL42.1 Sq.mts. ( 453 Sq.ft. )
RESIDENTIAL45.47 Sq.mts. ( 489 Sq.ft. )
RESIDENTIAL39.97 Sq.mts. ( 430 Sq.ft. )
RESIDENTIAL33.32 Sq.mts. ( 359 Sq.ft. )
RESIDENTIAL42.6 Sq.mts. ( 459 Sq.ft. )
COMMERCIAL10.54 Sq.mts. ( 113 Sq.ft. )
COMMERCIAL10.8 Sq.mts. ( 116 Sq.ft. )
COMMERCIAL12.69 Sq.mts. ( 137 Sq.ft. )
COMMERCIAL14.66 Sq.mts. ( 158 Sq.ft. )
COMMERCIAL15.18 Sq.mts. ( 163 Sq.ft. )
COMMERCIAL16.79 Sq.mts. ( 181 Sq.ft. )
COMMERCIAL17.41 Sq.mts. ( 187 Sq.ft. )
RESIDENTIAL23.13 Sq.mts. ( 249 Sq.ft. )
RESIDENTIAL28.58 Sq.mts. ( 308 Sq.ft. )
RESIDENTIAL31.55 Sq.mts. ( 340 Sq.ft. )
RESIDENTIAL30.8 Sq.mts. ( 332 Sq.ft. )
RESIDENTIAL37.01 Sq.mts. ( 398 Sq.ft. )
RESIDENTIAL41.84 Sq.mts. ( 450 Sq.ft. )
RESIDENTIAL46.39 Sq.mts. ( 499 Sq.ft. )
COMMERCIAL10.75 Sq.mts. ( 116 Sq.ft. )
COMMERCIAL12.77 Sq.mts. ( 137 Sq.ft. )
COMMERCIAL14.36 Sq.mts. ( 155 Sq.ft. )
COMMERCIAL14.46 Sq.mts. ( 156 Sq.ft. )
COMMERCIAL14.95 Sq.mts. ( 161 Sq.ft. )
RESIDENTIAL43.13 Sq.mts. ( 464 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Hdil Paradise City Sector 2 last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Commence
Energy management
Yet To Commence
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Yet To Commence
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Commence
Solid Waste Management And Disposal
Yet To Commence
Storm Water Drains50% completed
50% Complete
Work In Progress
Street Lighting
Yet To Commence
Treatment And Disposal Of Sewage And Sullage Water
Yet To Commence
Water Conservation, Rain water Harvesting
Yet To Commence
Water Supply
Yet To Commence
Buildings / Wings in Hdil Paradise City Sector 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Hdil Paradise City Sector 2 by Housing Development And Infrastructure Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

418492 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 20

Wings / Towers in Project

Apartments Statistics

1576 apartments in total
Total
1576
Booked
1217
Available
359

Saleable Area Statistics (Sq. ft.)

503452 Total
Total
503452
Booked
386785
Available
116667
Total 1576 apartments in project. 1217 apartments booked. 77% apartments booked.
Total 503452 Sq.ft. saleable area. 386785 saleable area booked.
77% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Jan 190051010013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL79.7 Sq.mts. ( 858 Sq.ft. )14
9 Booked64% Booked
64% Booked
RESIDENTIAL81.09 Sq.mts. ( 873 Sq.ft. )12
8 Booked66% Booked
66% Booked
26 total apartments / 17 apartments booked. 65% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 10Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
19 Booked79% Booked
79% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
3 Booked50% Booked
50% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
20 Booked83% Booked
83% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 71 apartments booked. 82% apartments booked.
Work Description in Building Building No 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress55% done
55% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Building No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 11Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
21 Booked87% Booked
87% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
2 Booked50% Booked
50% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
6 Booked100% Booked
100% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
24 Booked100% Booked
100% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
4 Booked80% Booked
80% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 78 apartments booked. 90% apartments booked.
Work Description in Building Building No 11Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 12Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
24 Booked100% Booked
100% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
6 Booked100% Booked
100% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
18 Booked75% Booked
75% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
2 Booked50% Booked
50% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 77 apartments booked. 89% apartments booked.
Work Description in Building Building No 12Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 13Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL9.33 Sq.mts. ( 100 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL9.87 Sq.mts. ( 106 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL10.59 Sq.mts. ( 114 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL10.81 Sq.mts. ( 116 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL12.6 Sq.mts. ( 136 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL12.84 Sq.mts. ( 138 Sq.ft. )2
1 Booked50% Booked
50% Booked
COMMERCIAL12.99 Sq.mts. ( 140 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL13.08 Sq.mts. ( 141 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL13.17 Sq.mts. ( 142 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL13.77 Sq.mts. ( 148 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL14.16 Sq.mts. ( 152 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL14.51 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL17.14 Sq.mts. ( 184 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL17.27 Sq.mts. ( 186 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )21
17 Booked80% Booked
80% Booked
RESIDENTIAL25.18 Sq.mts. ( 271 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )21
14 Booked66% Booked
66% Booked
RESIDENTIAL30.34 Sq.mts. ( 327 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL30.76 Sq.mts. ( 331 Sq.ft. )8
5 Booked62% Booked
62% Booked
RESIDENTIAL40.91 Sq.mts. ( 440 Sq.ft. )7
6 Booked85% Booked
85% Booked
RESIDENTIAL42.1 Sq.mts. ( 453 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL45.47 Sq.mts. ( 489 Sq.ft. )1
1 Booked100% Booked
100% Booked
93 total apartments / 77 apartments booked. 82% apartments booked.
Work Description in Building Building No 13Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 14Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL9.33 Sq.mts. ( 100 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL9.87 Sq.mts. ( 106 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL10.59 Sq.mts. ( 114 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL10.81 Sq.mts. ( 116 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL12.6 Sq.mts. ( 136 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL12.84 Sq.mts. ( 138 Sq.ft. )2
2 Booked100% Booked
100% Booked
COMMERCIAL12.99 Sq.mts. ( 140 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL13.08 Sq.mts. ( 141 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL13.17 Sq.mts. ( 142 Sq.ft. )3
2 Booked66% Booked
66% Booked
COMMERCIAL17.27 Sq.mts. ( 186 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL14.16 Sq.mts. ( 152 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL14.51 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMRCIAL17.14 Sq.mts. ( 184 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMRCIAL13.77 Sq.mts. ( 148 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )21
17 Booked80% Booked
80% Booked
RESIDENTIAL25.18 Sq.mts. ( 271 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )21
16 Booked76% Booked
76% Booked
RESIDENTIAL30.34 Sq.mts. ( 327 Sq.ft. )3
2 Booked66% Booked
66% Booked
RESIDENTIAL30.76 Sq.mts. ( 331 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL40.91 Sq.mts. ( 440 Sq.ft. )7
7 Booked100% Booked
100% Booked
RESIDENTIAL42.1 Sq.mts. ( 453 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL45.47 Sq.mts. ( 489 Sq.ft. )1
None Booked0% Booked
0% Booked
93 total apartments / 75 apartments booked. 80% apartments booked.
Work Description in Building Building No 14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 15Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
22 Booked91% Booked
91% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
5 Booked62% Booked
62% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
6 Booked75% Booked
75% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
4 Booked66% Booked
66% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
21 Booked87% Booked
87% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
3 Booked60% Booked
60% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 70 apartments booked. 81% apartments booked.
Work Description in Building Building No 15Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 16

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 16Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
19 Booked79% Booked
79% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
6 Booked100% Booked
100% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
15 Booked62% Booked
62% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
4 Booked80% Booked
80% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDNETIAL28.71 Sq.mts. ( 309 Sq.ft. )8
4 Booked50% Booked
50% Booked
86 total apartments / 63 apartments booked. 73% apartments booked.
Work Description in Building Building No 16Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 17Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
18 Booked75% Booked
75% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
5 Booked83% Booked
83% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
21 Booked87% Booked
87% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
3 Booked60% Booked
60% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
None Booked0% Booked
0% Booked
86 total apartments / 71 apartments booked. 82% apartments booked.
Work Description in Building Building No 17Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 18

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 18Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
REESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
19 Booked79% Booked
79% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
2 Booked50% Booked
50% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
2 Booked40% Booked
40% Booked
RESIDENTIAL39.97 Sq.mts. ( 430 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
19 Booked79% Booked
79% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
6 Booked75% Booked
75% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
4 Booked50% Booked
50% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
2 Booked33% Booked
33% Booked
86 total apartments / 58 apartments booked. 67% apartments booked.
Work Description in Building Building No 18Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 19

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 19Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
19 Booked79% Booked
79% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
4 Booked66% Booked
66% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
21 Booked87% Booked
87% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 75 apartments booked. 87% apartments booked.
Work Description in Building Building No 19Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Jan 19005101009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL33.32 Sq.mts. ( 359 Sq.ft. )26
9 Booked34% Booked
34% Booked
RESIDENTIAL42.6 Sq.mts. ( 459 Sq.ft. )30
23 Booked76% Booked
76% Booked
56 total apartments / 32 apartments booked. 57% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 20

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 20Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL9.33 Sq.mts. ( 100 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL10.54 Sq.mts. ( 113 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL10.59 Sq.mts. ( 114 Sq.ft. )3
2 Booked66% Booked
66% Booked
COMMERCIAL10.8 Sq.mts. ( 116 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL12.69 Sq.mts. ( 137 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL12.84 Sq.mts. ( 138 Sq.ft. )2
1 Booked50% Booked
50% Booked
COMMERCIAL13.08 Sq.mts. ( 141 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL13.17 Sq.mts. ( 142 Sq.ft. )3
2 Booked66% Booked
66% Booked
COMMERCIAL14.66 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL15.18 Sq.mts. ( 163 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL16.79 Sq.mts. ( 181 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL17.14 Sq.mts. ( 184 Sq.ft. )3
2 Booked66% Booked
66% Booked
COMMERCIAL17.27 Sq.mts. ( 186 Sq.ft. )3
2 Booked66% Booked
66% Booked
COMMERCIAL17.41 Sq.mts. ( 187 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL23.13 Sq.mts. ( 249 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )21
21 Booked100% Booked
100% Booked
RESIDENTIAL25.18 Sq.mts. ( 271 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )7
7 Booked100% Booked
100% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL28.58 Sq.mts. ( 308 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )21
19 Booked90% Booked
90% Booked
RESIDENTIAL30.34 Sq.mts. ( 327 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )3
2 Booked66% Booked
66% Booked
RESIDENTIAL31.55 Sq.mts. ( 340 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )2
2 Booked100% Booked
100% Booked
103 total apartments / 88 apartments booked. 85% apartments booked.
Work Description in Building Building No 20Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Jan 19005101002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL30.8 Sq.mts. ( 332 Sq.ft. )24
17 Booked70% Booked
70% Booked
RESIDENTIAL37.01 Sq.mts. ( 398 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL41.84 Sq.mts. ( 450 Sq.ft. )24
17 Booked70% Booked
70% Booked
RESIDENTIAL46.39 Sq.mts. ( 499 Sq.ft. )6
3 Booked50% Booked
50% Booked
56 total apartments / 39 apartments booked. 69% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Jan 19005101002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL30.8 Sq.mts. ( 332 Sq.ft. )24
13 Booked54% Booked
54% Booked
RESIDENTIAL37.01 Sq.mts. ( 398 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDENTIAL41.84 Sq.mts. ( 450 Sq.ft. )24
17 Booked70% Booked
70% Booked
RESIDENTIAL46.39 Sq.mts. ( 499 Sq.ft. )6
5 Booked83% Booked
83% Booked
56 total apartments / 37 apartments booked. 66% apartments booked.
Work Description in Building Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5Jan 19005101009
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL33.32 Sq.mts. ( 359 Sq.ft. )26
13 Booked50% Booked
50% Booked
RESIDENTIAL42.6 Sq.mts. ( 459 Sq.ft. )30
21 Booked70% Booked
70% Booked
56 total apartments / 34 apartments booked. 60% apartments booked.
Work Description in Building Building No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 6Jan 19005101004
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL10.75 Sq.mts. ( 116 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL12.77 Sq.mts. ( 137 Sq.ft. )6
None Booked0% Booked
0% Booked
COMMERCIAL14.36 Sq.mts. ( 155 Sq.ft. )6
COMMERCIAL14.46 Sq.mts. ( 156 Sq.ft. )4
None Booked0% Booked
0% Booked
COMMERCIAL14.95 Sq.mts. ( 161 Sq.ft. )6
RESIDENTIAL30.8 Sq.mts. ( 332 Sq.ft. )24
10 Booked41% Booked
41% Booked
RESIDENTIAL37.01 Sq.mts. ( 398 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL41.84 Sq.mts. ( 450 Sq.ft. )18
12 Booked66% Booked
66% Booked
RESIDENTIAL43.13 Sq.mts. ( 464 Sq.ft. )6
6 Booked100% Booked
100% Booked
74 total apartments / 30 apartments booked. 40% apartments booked.
Work Description in Building Building No 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 7Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL9.33 Sq.mts. ( 100 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL10.54 Sq.mts. ( 113 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL10.59 Sq.mts. ( 114 Sq.ft. )3
1 Booked33% Booked
33% Booked
COMMERCIAL10.8 Sq.mts. ( 116 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL12.69 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL12.84 Sq.mts. ( 138 Sq.ft. )2
2 Booked100% Booked
100% Booked
COMMERCIAL13.08 Sq.mts. ( 141 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL13.17 Sq.mts. ( 142 Sq.ft. )3
2 Booked66% Booked
66% Booked
COMMERCIAL14.66 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMMERCIAL15.18 Sq.mts. ( 163 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL16.79 Sq.mts. ( 181 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL17.14 Sq.mts. ( 184 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL17.27 Sq.mts. ( 186 Sq.ft. )3
3 Booked100% Booked
100% Booked
COMMERCIAL17.41 Sq.mts. ( 187 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL23.13 Sq.mts. ( 249 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )21
19 Booked90% Booked
90% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )7
5 Booked71% Booked
71% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL28.58 Sq.mts. ( 308 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )21
18 Booked85% Booked
85% Booked
RESIDENTIAL30.34 Sq.mts. ( 327 Sq.ft. )3
2 Booked66% Booked
66% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL31.55 Sq.mts. ( 340 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )2
2 Booked100% Booked
100% Booked
RESIDNETIAL25.18 Sq.mts. ( 271 Sq.ft. )3
3 Booked100% Booked
100% Booked
103 total apartments / 84 apartments booked. 81% apartments booked.
Work Description in Building Building No 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Building No 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 8Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
18 Booked75% Booked
75% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
5 Booked83% Booked
83% Booked
RESIDNETIAL29.86 Sq.mts. ( 321 Sq.ft. )24
18 Booked75% Booked
75% Booked
RESIDNETIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDNETIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 71 apartments booked. 82% apartments booked.
Work Description in Building Building No 8Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Building No 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 9Jan 19005101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL24.34 Sq.mts. ( 262 Sq.ft. )24
17 Booked70% Booked
70% Booked
RESIDENTIAL27.22 Sq.mts. ( 293 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL28.46 Sq.mts. ( 306 Sq.ft. )4
3 Booked75% Booked
75% Booked
RESIDENTIAL28.71 Sq.mts. ( 309 Sq.ft. )8
6 Booked75% Booked
75% Booked
RESIDENTIAL29.32 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL29.41 Sq.mts. ( 317 Sq.ft. )6
4 Booked66% Booked
66% Booked
RESIDENTIAL29.86 Sq.mts. ( 321 Sq.ft. )24
21 Booked87% Booked
87% Booked
RESIDENTIAL30.45 Sq.mts. ( 328 Sq.ft. )4
4 Booked100% Booked
100% Booked
RESIDENTIAL33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL34.07 Sq.mts. ( 367 Sq.ft. )5
4 Booked80% Booked
80% Booked
RESIDENTIAL36.97 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
86 total apartments / 70 apartments booked. 81% apartments booked.
Work Description in Building Building No 9Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Housing Development And Infrastructure Ltd
for Project
Hdil Paradise City Sector 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation