Project overview

Haware Nakshatra Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000022309. Haware Nakshatra Phase 2 is located at 66/1. This is a New being developed by Haware Infotech Ltd.

Haware Nakshatra Phase 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 329 to 479 Sq.ft. Carpet. The Project has total 57 of which 43 are currently available for sale.

Haware Nakshatra Phase 2 is being developed on a total land area of 18460 Sq.ft. out of which 1851 Sq.ft. i.e 10% is reserved for recreational purposes. Haware Nakshatra Phase 2 has 18 Wings / Towers Bldg No 1,Bldg No 10,Bldg No 13,Bldg No 14,Bldg No 17,Bldg No 2,Bldg No 20,Bldg No 24,Bldg No 25,Bldg No 26,Bldg No 27,Bldg No 28,Bldg No 3,Bldg No 4,Bldg No 5,Bldg No 6,Bldg No 7,Bldg No 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Haware Nakshatra Phase 2
  • Location:
  • 66/1
  • Const. Stage:
    New
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Haware Infotech Ltd
  • Phone:
  • Address:
  • Haware Infotech Park
Project RERA Details
MAHA REARA No: P99000022309
Project Type Residential / Group Housing
RERA Project Status New
Architect Siddhivinayak Associates
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Sep 2019
Last Retrived 28 Jul 2025
Haware Nakshatra Phase 2 QR Code
Haware Nakshatra Phase 2
MahaRERA - P99000022309
Apartment Details & Configuration
TypeArea
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )
1RK19.72 Sq.mts. ( 212 Sq.ft. )
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )
2 BHK44.47 Sq.mts. ( 479 Sq.ft. )
2 BHK44.88 Sq.mts. ( 483 Sq.ft. )
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )
1RK22.06 Sq.mts. ( 237 Sq.ft. )
Shop8.65 Sq.mts. ( 93 Sq.ft. )
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )
Shop12.42 Sq.mts. ( 134 Sq.ft. )
Shop14.11 Sq.mts. ( 152 Sq.ft. )
Shop14.27 Sq.mts. ( 154 Sq.ft. )
Shop14.48 Sq.mts. ( 156 Sq.ft. )
Shop14.28 Sq.mts. ( 154 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Haware Nakshatra Phase 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Done In Overall Project
Clubhouse100% completed
95% Complete
Ready In Overall Project
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done In Overall Project
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Gym100% completed
95% Complete
Ready In Overall Project
Landscaping & Tree Planting100% completed
95% Complete
Done In Overall Project
Mini theatre100% completed
95% Complete
Ready In Overall Project
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done In Overall Project
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done In Overall Project
Street Lighting100% completed
95% Complete
Done In Overall Project
Swimming Pool100% completed
95% Complete
Ready In Overall Project
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Stp Done
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Provided In Overall Project
Buildings / Wings in Haware Nakshatra Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Haware Nakshatra Phase 2 by Haware Infotech Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

18460 Sq. ft.

Project Area

1851 Sq. ft.

Recreational Open Space

Total 18

Wings / Towers in Project

Apartments Statistics

57 apartments in total
Total
57
Booked
14
Available
43

Saleable Area Statistics (Sq. ft.)

19018 Total
Total
19018
Booked
3682
Available
15337
Total 57 apartments in project. 14 apartments booked. 24% apartments booked.
Total 19018 Sq.ft. saleable area. 3682 saleable area booked.
19% area booked.

Bldg No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 1Dec 20205000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 total apartments / 2 apartments booked. 100% apartments booked.
Work Description in Building Bldg No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 10Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 13Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.47 Sq.mts. ( 479 Sq.ft. )2
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 14Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.47 Sq.mts. ( 479 Sq.ft. )2
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 17Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.47 Sq.mts. ( 479 Sq.ft. )2
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 17Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 2Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK44.88 Sq.mts. ( 483 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 total apartments / 3 apartments booked. 100% apartments booked.
Work Description in Building Bldg No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 20

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 20Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.47 Sq.mts. ( 479 Sq.ft. )2
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 20Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 24

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 24Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 24Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 25

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 25Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 25Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 26

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 26Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK22.06 Sq.mts. ( 237 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop8.65 Sq.mts. ( 93 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 26Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 27

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 27Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 27Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 28

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 28Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.46 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 28Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 3Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.82 Sq.mts. ( 386 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 total apartments / 2 apartments booked. 100% apartments booked.
Work Description in Building Bldg No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 4Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK44.88 Sq.mts. ( 483 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 2 apartments booked. 66% apartments booked.
Work Description in Building Bldg No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 5Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.42 Sq.mts. ( 134 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.11 Sq.mts. ( 152 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.27 Sq.mts. ( 154 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.48 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
6 total apartments / 2 apartments booked. 33% apartments booked.
Work Description in Building Bldg No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 6Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.42 Sq.mts. ( 134 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.11 Sq.mts. ( 152 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.27 Sq.mts. ( 154 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.28 Sq.mts. ( 154 Sq.ft. )1
None Booked0% Booked
0% Booked
6 total apartments / 3 apartments booked. 50% apartments booked.
Work Description in Building Bldg No 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 7Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.47 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Bldg No 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 9Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.53 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.58 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.47 Sq.mts. ( 479 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Haware Infotech Ltd
for Project
Haware Nakshatra Phase 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation