Project overview
Haware Intelligentia Sigma South Jvlr Wing C is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028288. Haware Intelligentia Sigma South Jvlr Wing C is located at Cts No 352 Pt, Tagore Nagar, Bldg No 18, Mumbai, 400083. This is a New Project being developed by Suresh Haware.
Haware Intelligentia Sigma South Jvlr Wing C has Shop Apartments with carpet areas ranging from 109 to 92 Sq.ft. Carpet. The Project has total 85 of which 85 are currently available for sale.
Haware Intelligentia Sigma South Jvlr Wing C is being developed on a total land area of 13364 Sq.ft. Haware Intelligentia Sigma South Jvlr Wing C has 3 Wings / Towers Wing C Floor 23-27,Wing C Floors 1-22,Wing C Ground Floor
| Project | Developer | Location | Possession |
-
Project:
Haware Intelligentia Sigma South Jvlr Wing C
-
Location:
-
Cts No 352 Pt, Tagore Nagar, Bldg No 18, Mumbai, 400083
-
Const. Stage:
New Project
-
Possession:
30 Jun 2026
-
Developer:
Suresh Haware
-
Phone:
-
Address:
-
2305, 23Rd Floor, Haware Infotech Park, Sector 30A, Opp. Inorbit Mall, Vashi, 400705
| MAHA REARA No: |
P51800028288 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Architect |
Space Design |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
30 Jun 2026 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
31 Aug 2021 |
| Last Retrived |
28 Jul 2025 |
Haware Intelligentia Sigma South Jvlr Wing C QR Code
Haware Intelligentia Sigma South Jvlr Wing C
MahaRERA - P51800028288
| Type | Area |
| Flat 1 | 31.35 Sq.mts. ( 337 Sq.ft. ) |
| Flat 2 | 26.38 Sq.mts. ( 284 Sq.ft. ) |
| Flat 3 | 21.8 Sq.mts. ( 235 Sq.ft. ) |
| Flat Type 3B | 24.9 Sq.mts. ( 268 Sq.ft. ) |
| Shop | 6 Sq.mts. ( 65 Sq.ft. ) |
| Shop | 6.05 Sq.mts. ( 65 Sq.ft. ) |
| Shop | 6.18 Sq.mts. ( 67 Sq.ft. ) |
| Shop | 7.28 Sq.mts. ( 78 Sq.ft. ) |
| Shop | 8.52 Sq.mts. ( 92 Sq.ft. ) |
| Shop | 10.12 Sq.mts. ( 109 Sq.ft. ) |
| Shop | 10.16 Sq.mts. ( 109 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Haware Intelligentia Sigma South Jvlr Wing Clast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Will Be Provided |
|
|
|
Energy Saving Devices Will Be Installed |
Fire Protection And Fire Safety
Requirements
|
|
As Per Cfo Norms |
Landscaping & Tree Planting
|
|
Will Be Provided |
|
|
|
As Per Approved Plans |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Will Be Provided As Per Norms |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Will Be Provided As Per Norms |
|
|
|
Good Quality Lighting Will Be Installed |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Water Conservation Devices Will Be Installed |
|
|
|
Will Be Provided |
Buildings / Wings in Haware Intelligentia Sigma South Jvlr Wing C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Haware Intelligentia Sigma South Jvlr Wing C by Suresh Hawarelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
85
apartments in total
Saleable Area Statistics (Sq. ft.)
22656
Total
Total 85 apartments in project. 0 apartments booked. 0% apartments booked.
Total 22656 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing C Floor 23-27 | Dec 2025 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| Flat 1 | 31.35 Sq.mts. ( 337 Sq.ft. ) | 5 | |
| Flat 2 | 26.38 Sq.mts. ( 284 Sq.ft. ) | 5 | |
| Flat 3 | 21.8 Sq.mts. ( 235 Sq.ft. ) | 5 | |
15 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing C Floor 23-27 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing C Floors 1-22 | Dec 2023 | 23 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| Flat 1 | 31.35 Sq.mts. ( 337 Sq.ft. ) | 21 | |
| Flat 2 | 26.38 Sq.mts. ( 284 Sq.ft. ) | 20 | |
| Flat 3 | 21.8 Sq.mts. ( 235 Sq.ft. ) | 20 | |
| Flat Type 3B | 24.9 Sq.mts. ( 268 Sq.ft. ) | 1 | |
62 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing C Floors 1-22 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing C Ground Floor | Dec 2023 | 1 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| Shop | 6 Sq.mts. ( 65 Sq.ft. ) | 2 | |
| Shop | 6.05 Sq.mts. ( 65 Sq.ft. ) | 1 | |
| Shop | 6.18 Sq.mts. ( 67 Sq.ft. ) | 1 | |
| Shop | 7.28 Sq.mts. ( 78 Sq.ft. ) | 1 | |
| Shop | 8.52 Sq.mts. ( 92 Sq.ft. ) | 1 | |
| Shop | 10.12 Sq.mts. ( 109 Sq.ft. ) | 1 | |
| Shop | 10.16 Sq.mts. ( 109 Sq.ft. ) | 1 | |
8 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing C Ground Floor | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Suresh Haware
for Project
Haware Intelligentia Sigma South Jvlr Wing C
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |