Project overview

Haware Intelligentia Sigma South Jvlr Wing C is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028288. Haware Intelligentia Sigma South Jvlr Wing C is located at Cts No 352 Pt, Tagore Nagar, Bldg No 18, Mumbai, 400083. This is a New Project being developed by Suresh Haware.

Haware Intelligentia Sigma South Jvlr Wing C has Shop Apartments with carpet areas ranging from 109 to 92 Sq.ft. Carpet. The Project has total 85 of which 85 are currently available for sale.

Haware Intelligentia Sigma South Jvlr Wing C is being developed on a total land area of 13364 Sq.ft. Haware Intelligentia Sigma South Jvlr Wing C has 3 Wings / Towers Wing C Floor 23-27,Wing C Floors 1-22,Wing C Ground Floor

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Haware Intelligentia Sigma South Jvlr Wing C
  • Location:
  • Cts No 352 Pt, Tagore Nagar, Bldg No 18, Mumbai, 400083
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    Suresh Haware
  • Phone:
  • Address:
  • 2305, 23Rd Floor, Haware Infotech Park, Sector 30A, Opp. Inorbit Mall, Vashi, 400705
Project RERA Details
MAHA REARA No: P51800028288
Project Type Residential
RERA Project Status New Project
Architect Space Design
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 31 Aug 2021
Last Retrived 28 Jul 2025
Haware Intelligentia Sigma South Jvlr Wing C QR Code
Haware Intelligentia Sigma South Jvlr Wing C
MahaRERA - P51800028288
Apartment Details & Configuration
TypeArea
Flat 131.35 Sq.mts. ( 337 Sq.ft. )
Flat 226.38 Sq.mts. ( 284 Sq.ft. )
Flat 321.8 Sq.mts. ( 235 Sq.ft. )
Flat Type 3B24.9 Sq.mts. ( 268 Sq.ft. )
Shop6 Sq.mts. ( 65 Sq.ft. )
Shop6.05 Sq.mts. ( 65 Sq.ft. )
Shop6.18 Sq.mts. ( 67 Sq.ft. )
Shop7.28 Sq.mts. ( 78 Sq.ft. )
Shop8.52 Sq.mts. ( 92 Sq.ft. )
Shop10.12 Sq.mts. ( 109 Sq.ft. )
Shop10.16 Sq.mts. ( 109 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Haware Intelligentia Sigma South Jvlr Wing Clast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided
Energy management
Energy Saving Devices Will Be Installed
Fire Protection And Fire Safety Requirements
As Per Cfo Norms
Landscaping & Tree Planting
Will Be Provided
Open Parking
As Per Approved Plans
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Provided As Per Norms
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Provided As Per Norms
Street Lighting
Good Quality Lighting Will Be Installed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Water Conservation Devices Will Be Installed
Water Supply
Will Be Provided
Buildings / Wings in Haware Intelligentia Sigma South Jvlr Wing C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Haware Intelligentia Sigma South Jvlr Wing C by Suresh Hawarelast updated on 28 Jul 2025 as per information obtained from MARA RERA.

13364 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

85 apartments in total
Total
85
Booked
0
Available
85

Saleable Area Statistics (Sq. ft.)

22656 Total
Total
22656
Booked
0
Available
22656
Total 85 apartments in project. 0 apartments booked. 0% apartments booked.
Total 22656 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Wing C Floor 23-27

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C Floor 23-27Dec 20255100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Flat 131.35 Sq.mts. ( 337 Sq.ft. )5
None Booked0% Booked
0% Booked
Flat 226.38 Sq.mts. ( 284 Sq.ft. )5
None Booked0% Booked
0% Booked
Flat 321.8 Sq.mts. ( 235 Sq.ft. )5
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C Floor 23-27Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C Floors 1-22

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C Floors 1-22Dec 202323100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Flat 131.35 Sq.mts. ( 337 Sq.ft. )21
None Booked0% Booked
0% Booked
Flat 226.38 Sq.mts. ( 284 Sq.ft. )20
None Booked0% Booked
0% Booked
Flat 321.8 Sq.mts. ( 235 Sq.ft. )20
None Booked0% Booked
0% Booked
Flat Type 3B24.9 Sq.mts. ( 268 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C Floors 1-22Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C Ground Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C Ground FloorDec 20231100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop6 Sq.mts. ( 65 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop6.05 Sq.mts. ( 65 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop6.18 Sq.mts. ( 67 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop7.28 Sq.mts. ( 78 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop8.52 Sq.mts. ( 92 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.12 Sq.mts. ( 109 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.16 Sq.mts. ( 109 Sq.ft. )1
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C Ground FloorCompletion
Excavation
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Suresh Haware
for Project
Haware Intelligentia Sigma South Jvlr Wing C
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation