Project overview

Haware Amara is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800049029. Haware Amara is located at Bldg. No. 49, Survey No. 113 (Pt), C.T.S No. 356 (Pt). This is a New being developed by Haware Amara Llp.

Haware Amara has 1 BHK, 1RK & Shop Apartments with carpet areas ranging from 113 to 102 Sq.ft. Carpet. The Project has total 157 of which 43 are currently available for sale.

Haware Amara is being developed on a total land area of 10331 Sq.ft. Haware Amara has 2 Wings / Towers Haware Amara - Wing A,Haware Amara - Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Haware Amara
  • Location:
  • Bldg. No. 49, Survey No. 113 (Pt), C.T.S No. 356 (Pt)
  • Const. Stage:
    New
  • Possession:
    10 Jan 2028
Developer Details

  • Developer:
    Haware Amara Llp
  • Phone:
  • Address:
  • Vardhaman Market
Project RERA Details
MAHA REARA No: P51800049029
Project Type Residential / Group Housing
RERA Project Status New
Architect M/S Vastu Creations
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession 10 Jan 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 30 Jan 2023
Last Retrived 26 Jul 2025
Haware Amara QR Code
Haware Amara
MahaRERA - P51800049029
Apartment Details & Configuration
TypeArea
1 BHK30.13 Sq.mts. ( 324 Sq.ft. )
1 BHK30.67 Sq.mts. ( 330 Sq.ft. )
1 BHK31.53 Sq.mts. ( 339 Sq.ft. )
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )
1 BHK34.85 Sq.mts. ( 375 Sq.ft. )
2 BHK52.04 Sq.mts. ( 560 Sq.ft. )
2 BHK52.05 Sq.mts. ( 560 Sq.ft. )
Shop8.07 Sq.mts. ( 87 Sq.ft. )
Shop8.13 Sq.mts. ( 88 Sq.ft. )
Shop10.35 Sq.mts. ( 111 Sq.ft. )
Shop11.93 Sq.mts. ( 128 Sq.ft. )
Shop14.86 Sq.mts. ( 160 Sq.ft. )
Shop19.34 Sq.mts. ( 208 Sq.ft. )
1 BHK30.23 Sq.mts. ( 325 Sq.ft. )
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )
1 BHK32.1 Sq.mts. ( 346 Sq.ft. )
1RK27.81 Sq.mts. ( 299 Sq.ft. )
Shop8.5 Sq.mts. ( 91 Sq.ft. )
Shop9.52 Sq.mts. ( 102 Sq.ft. )
Shop10.5 Sq.mts. ( 113 Sq.ft. )
Shop10.52 Sq.mts. ( 113 Sq.ft. )
Shop11.14 Sq.mts. ( 120 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Haware Amaralast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Any other Common Areas & facilties, Amenities
Nil
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Nil
Energy management
Na
Fire Protection And Fire Safety Requirements
Nil
Landscaping & Tree Planting
Nil
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Nil
Solid Waste Management And Disposal
Nil
Storm Water Drains
Nil
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Nil
Water Supply
Nil
Buildings / Wings in Haware Amara
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Haware Amara by Haware Amara Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

10331 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

157 apartments in total
Total
157
Booked
114
Available
43

Saleable Area Statistics (Sq. ft.)

49590 Total
Total
49590
Booked
36877
Available
12713
Total 157 apartments in project. 114 apartments booked. 72% apartments booked.
Total 49590 Sq.ft. saleable area. 36877 saleable area booked.
74% area booked.

Haware Amara - Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Haware Amara - Wing AOct 2028231010031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.13 Sq.mts. ( 324 Sq.ft. )20
15 Booked75% Booked
75% Booked
1 BHK30.67 Sq.mts. ( 330 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK31.53 Sq.mts. ( 339 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )6
2 Booked33% Booked
33% Booked
1 BHK34.85 Sq.mts. ( 375 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK52.04 Sq.mts. ( 560 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK52.05 Sq.mts. ( 560 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop8.07 Sq.mts. ( 87 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop8.13 Sq.mts. ( 88 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop10.35 Sq.mts. ( 111 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.93 Sq.mts. ( 128 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.86 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.34 Sq.mts. ( 208 Sq.ft. )1
None Booked0% Booked
0% Booked
59 total apartments / 34 apartments booked. 57% apartments booked.
Work Description in Building Haware Amara - Wing ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Haware Amara - Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Haware Amara - Wing BOct 2028231010023
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.23 Sq.mts. ( 325 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.53 Sq.mts. ( 339 Sq.ft. )30
26 Booked86% Booked
86% Booked
1 BHK32.1 Sq.mts. ( 346 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK32.66 Sq.mts. ( 352 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK34.85 Sq.mts. ( 375 Sq.ft. )2
1 Booked50% Booked
50% Booked
1RK27.81 Sq.mts. ( 299 Sq.ft. )46
42 Booked91% Booked
91% Booked
Shop8.5 Sq.mts. ( 91 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop9.52 Sq.mts. ( 102 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.5 Sq.mts. ( 113 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop10.52 Sq.mts. ( 113 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.14 Sq.mts. ( 120 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.93 Sq.mts. ( 128 Sq.ft. )2
None Booked0% Booked
0% Booked
98 total apartments / 80 apartments booked. 81% apartments booked.
Work Description in Building Haware Amara - Wing BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Haware Amara Llp
for Project
Haware Amara
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation