Project overview

Harshal Co-Op Housing Society Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700049194. Harshal Co-Op Housing Society Ltd is located at 34. This is a New being developed by Veena Developers.

Harshal Co-Op Housing Society Ltd has 1 BHK, 1 BHK REHAB, 1 RK REHAB, 1RK, 2 BHK REHAB, 2 bHK REHAB, 3 BHK REHAB & 4 BHK Apartments with carpet areas ranging from 1406 to 817 Sq.ft. Carpet. The Project has total 30 of which 8 are currently available for sale.

Harshal Co-Op Housing Society Ltd is being developed on a total land area of 5446 Sq.ft. Harshal Co-Op Housing Society Ltd has 1 Wings / Towers Harshal Co-Op Housing Society Ltd

ProjectDeveloperLocationPossession
NandigramYogesh Kishor MahajanTikka No 5, 62A/131-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNew S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,731-12-2027 00:00:00
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
The EmpressUnique Shanti Developers LlpOld S.No.479/230-03-2023 00:00:00
Lotus ParkReal Enterprise842-A, Plot No. 02,0330-12-2022 00:00:00
Ten X Era Raymond Realty Tower CRaymond Limited121 Pt 83/3 83/130-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder & DevelopersSurvey No 13 Hissa No 6(A) Plot No 2631-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarThane31-12-2027 00:00:00
Raviraj ApartmentRajendra GhorpadeS.No 85,H. No 11, Plot No 930-12-2022 00:00:00
Krupa SindhuAshish Waman GoleS No 48 H No 8/428-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesTika No 16 Cts No 7830-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyS No 29/A H No 19 Plot No 8730-09-2019 00:00:00
Mauli MadhusudhanRameshwar Patil42160530-03-2023 00:00:00
Salangpur NirmanSalangpur Nirman252 6,7 Part30-12-2022 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
Silver ArcadeSiddhivinayak Enterprises5831-12-2018 00:00:00
Orion Business ParkNeminath EnterprisesGut No 33 Pt31-03-2019 00:00:00
Payal PrideMit Enterprises10430-03-2022 00:00:00
Panvelkar Estate - GreenfordPanvelkar Infrastructures Private LimitedSurvey No. 42 Hissa No 2 And 330-12-2022 00:00:00
Plot 1 Sector 10 GhansoliCidco Of Maharashtra Ltd.Plot No 130-06-2021 00:00:00
Kashi Darshan B WingVarad Raj Construction98/1920-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersThane19-01-2026 00:00:00
Narang Privado - BNarang Realty Private Limited146/5/B And 146/6/B/131-03-2028 00:00:00
Golden Hills B- 3Vihang Enterprises921,923,9241,9243,928130-12-2024 00:00:00
Classic ResidencyClassic ConstructionThane30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersSurvey No. 28 H.No 530-03-2026 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private Limited1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 1483130-12-2023 00:00:00
Highland Springs B4- A WingSiddhi Real Estate Developers74/5Apart30-06-2023 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai31-12-2025 00:00:00
Suyog ApartmentTelange Builders & Developers Private Limited4693 To 469930-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction7015A/1A30-06-2023 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private Limited67/2/P, 67/3A, Sub Plot B30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedGut No 42/131-12-2018 00:00:00
Jai MatadeeAaradhana Developers37531-03-2018 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.50602-10-2026 00:00:00
Teri KudratVishnu Jethanand BadlaniPlot No 433, Sheet No 48, Cts No 2578331-10-2024 00:00:00
Kanha ResidencyKulkarnii Builder105A/4/2/3/4/5/4114-05-2025 00:00:00
One Indiabulls Thane - 1Tapir Constructions Limited71/1/A/1/1, 71/229-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/430-12-2021 00:00:00
Saket ImperialNirmaan Realty9570,957107-08-2025 00:00:00
Maruti Square Building No 7Maruti Dwellers Private LimitedNew Survey Nos 63 66 And 69 Pt31-12-2027 00:00:00
Paramount FKalpataru Homes Private LimitedSno 115/4/2 Pt 115/5 Pt 115/6 Pt 115/7/2 Pt 115/8/2 Pt 115/10/2 Pt Of Village Majiwade30-09-2024 00:00:00
Nirman SignatureShree Sha DevelopersSuevey No.180 Hissa No.3/231-03-2026 00:00:00
Hcs HorizonHcs Realtors LlpOld Survey No 271 New Survey No 82 Hissa No 1131-12-2026 00:00:00
Maplewoods Phase 1M/S Bks Galaxy Realtors Llp51(2) 56 And 57(2)31-12-2028 00:00:00
Sarthi ElanzaSarthi DevelopersS No-264/58 Plot No-5531-10-2023 00:00:00
Bsc It ParkBansal Steel CorporationA21601-06-2024 00:00:00
Runwal Lands EndRunwal Construction Private Limited20/3 Part30-06-2029 00:00:00
Cosmos Horizon Phase IiConcorde Developers192/2A30-03-2024 00:00:00
Simone ResidencyM R M DevelopersDaighar Village30-12-2022 00:00:00
Delta WoodsDelta Venture1883Pt30-09-2023 00:00:00
Trinity MokshRattanraj LifespacesS No 64 1 And 64 231-03-2025 00:00:00
Ganesh BhuvanMagnum Homes66830-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresS No 5/4/D 5/4/B 5/23/B30-06-2025 00:00:00
Paramount EKalpataru Homes Private LimitedS.No. 115/10/2-Part And 115/8/2-Part Of Village Majiwada30-06-2025 00:00:00
Madhu VillaShree Krishna EnterprisesSurvey No. 18 / House No. 2230-12-2022 00:00:00
Shapoorji Pallonji The Impulse- Phase 1Jaykali Developers Private LimitedS. No.509, 510P30-06-2024 00:00:00
Spm Dream City Phase 1D K BuildconS No 52 H No 4/531-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedSno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum30-06-2025 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt Ltd108/1 And 93 Part31-12-2027 00:00:00
Shivsai ParadiseBharat Agri Fert & Realty Realty Ltd112/2A,3,4,5/1,5/2,5/330-12-2028 00:00:00
RubaShreyas Enterprises112/5/430-09-2020 00:00:00
OrchidMehta RealtorsS No 378/131-03-2019 00:00:00
Shreeji LandmarkVinayak DevelopersSurvey No 46 Hissa No 5-130-12-2029 00:00:00
Hyde Park Residency F4 Building PhaseNexus Builders And Developers Pvt Ltd47/1/2, 47/1/3, 47/1/4, 47/1/5, 47/1/7, 47/1/9, 47/1/1030-12-2021 00:00:00
Bhagwan Krishna NiwasQuick Developers27/1201-07-2024 00:00:00
ZenithRunwal Developers Private LimitedSurvey No 51 Hissa No 1 To 15 Survey No 52 Hissa No 1 To 3 Survey No 5330-09-2028 00:00:00
Urban Nest Bldg - 1Cllaro Enterprises Llp127-1A31-12-2024 00:00:00
Seven Eleven CourtyardS.S.S AssoicatesThane30-11-2025 00:00:00
Shivanjali HeightsShivanjali ConstructionSurvey No 73, 74, 75, 7630-06-2022 00:00:00
Newa Bhakti Park B WingNewa Technocity (I) Private LimitedIt 631-12-2027 00:00:00
Skyrise ResidencyNishith Subandhu LuharPlot No 6/Cts No 7469/S No 38/B/630-07-2025 00:00:00
Priyanka ParadisePriyanka Regency LlpPlot 16A Sector 24 Sanpada Navi Mumbai31-12-2024 00:00:00
Green SquareSquarefeet Enterprises166/3131-12-2027 00:00:00
Larkins NestPride Property Developers68/13/3F And 68/13/3G31-12-2025 00:00:00
Shanti LegacyAnmol InfraOld S. No. 368, New S. No. 7031-03-2025 00:00:00
Thanekar Palacio Phase IiThanekar Construction LlpSurvey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6 & 731-12-2026 00:00:00
Veer GalaxyYash InfraSector 2 , 108/4C , 108/4D31-07-2025 00:00:00
Priyanka AvenuePriyanka Regency LlpPlot No 29 Sector 1531-03-2028 00:00:00
Shalimar Co.Op Hsg Soc LtdNeena Shailesh Paranjape1548, 1549 , 155030-04-2024 00:00:00
Arihant City Phase-Ii - N BuildingArihant Enterprises49/1P,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P30-06-2026 00:00:00
The Icon Phase 1Leading Frontier Private LimitedSurvey No 60/18,60/19,Survey No 61/2A To 61/2F, 61/3,62/3,62/5E,62/6,62/7,62/9C30-12-2022 00:00:00
Vardhman Garden Phase IiDiwali Construction CompanyThane31-12-2022 00:00:00
Vardhman VatikaDiwali DevelopersSurvey No 21 Part And 22 Part31-12-2019 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedGut No.45/2,46/2,47,49/4,49/9,49/11,49/1230-12-2023 00:00:00
Shree Moreshwar Chs LtdAjay Sanjay MohorikarS No 33 H No. 6/15 Cts No 897331-12-2024 00:00:00
Swami Narendra ResidencyRaj Ratneshwari Developers274/1-B31-12-2026 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private Limited509 And 510/A31-12-2027 00:00:00
Saurabh HeightsS K DevelopersS. No. 81 H No.14 P .No 1/B31-03-2026 00:00:00
Audumber CrownAudumber Builders & DevelopersS No 25, H No3/3, Plot No 131-12-2026 00:00:00
Srinathji VishwashreeSrinathji ConstructionsTika No 8, Cts No 13/A/131-12-2025 00:00:00
Arihant City Phase-Ii - M BuildingArihant Enterprises49/1P,49/2,49/3,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P30-06-2026 00:00:00
Arihant City Phase-Ii - L BuildingArihant Enterprises49/1P,49/2,49/3P,50/1P,52/1P,52/1P,53/1P,53/1P,53/1P,53/2P,55P,55P,55P,56P30-06-2026 00:00:00
Rukmani ResidencyClay Nest Developers42130831-12-2027 00:00:00
Shree Chintamani Co Op Hsg Soc LtdShree Ganesh Construction400602, Thane, Kumbharwada Shivaji Path31-03-2024 00:00:00
Laxmi ArcadeSatish Kashinath Gujarathi36231-12-2024 00:00:00
Dosti West County - Dosti Nest - Phase 2Dosti Enterprises25/7(Pt) 25/9(Pt) 25/10A(Pt) 44/1(Pt) 43/1(Pt)30-06-2027 00:00:00
Umiya Nakshatra HeightsM/S. Jigar EnterpriseS No/H No 64/2 And 64/1/431-12-2027 00:00:00
KrishnapingakshaPrashant Tukaram BaeetS No 51 , H No 2/A/26 , Plot No 2631-12-2026 00:00:00
Navsundaram Co Op Hsg SocietyShreekanth DevelopersS No 4 ,H No 18 , Plot No 2 & Plot No 331-03-2026 00:00:00
Om Ashish ChsGreen Heights Infra42150331-12-2025 00:00:00
Delta VrindavanDelta VentureCts 1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 2103 2157 2221 2222 2294 2158 2295 174130-09-2020 00:00:00
Elegant OlympiaElegant Homes2314-05-2018 00:00:00
Krishna - B WingNeelkanth Palm Realty149/4/1 Pt, 412/2 Pt30-05-2022 00:00:00
Indraprasth Wing CSonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Project Details
  • Project:
    Harshal Co-Op Housing Society Ltd
  • Location:
  • 34
  • Const. Stage:
    New
  • Possession:
    30 Sep 2024
Developer Details

  • Developer:
    Veena Developers
  • Phone:
  • Address:
  • Jai Aakansha Chs
Project RERA Details
MAHA REARA No: P51700049194
Project Type Residential / Group Housing
RERA Project Status New
Architect Innovative Design
Funding Bank G P PARSIK BANK
Proposed Possession 30 Sep 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Feb 2023
Last Retrived 26 Jul 2025
Harshal Co-Op Housing Society Ltd QR Code
Harshal Co-Op Housing Society Ltd
MahaRERA - P51700049194
Apartment Details & Configuration
TypeArea
1 BHK41.6 Sq.mts. ( 448 Sq.ft. )
1 BHK41.92 Sq.mts. ( 451 Sq.ft. )
1 BHK41.97 Sq.mts. ( 452 Sq.ft. )
1 BHK43.31 Sq.mts. ( 466 Sq.ft. )
1 BHK46.26 Sq.mts. ( 498 Sq.ft. )
1 BHK REHAB38.98 Sq.mts. ( 420 Sq.ft. )
1 RK REHAB30.89 Sq.mts. ( 332 Sq.ft. )
1RK27.9 Sq.mts. ( 300 Sq.ft. )
2 BHK REHAB52.22 Sq.mts. ( 562 Sq.ft. )
2 BHK REHAB56.77 Sq.mts. ( 611 Sq.ft. )
2 bHK REHAB57.97 Sq.mts. ( 624 Sq.ft. )
2 BHK REHAB58.08 Sq.mts. ( 625 Sq.ft. )
2 BHK REHAB58.23 Sq.mts. ( 627 Sq.ft. )
2 BHK REHAB61.15 Sq.mts. ( 658 Sq.ft. )
3 BHK REHAB71.29 Sq.mts. ( 767 Sq.ft. )
3 BHK REHAB75.89 Sq.mts. ( 817 Sq.ft. )
4 BHK130.61 Sq.mts. ( 1406 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Harshal Co-Op Housing Society Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply100% completed
95% Complete
As Per Tmc Nomes
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Na
Storm Water Drains100% completed
95% Complete
As Per Cfo Terms
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work In Progress
Open Parking100% completed
95% Complete
Work In Progress
Landscaping & Tree Planting100% completed
95% Complete
As Per Tmc Nomes
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Work In Progress
Energy management100% completed
95% Complete
Work In Progress
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work In Progress
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Harshal Co-Op Housing Society Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Harshal Co-Op Housing Society Ltd by Veena Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5446 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

30 apartments in total
Total
30
Booked
22
Available
8

Saleable Area Statistics (Sq. ft.)

15962 Total
Total
15962
Booked
12679
Available
3284
Total 30 apartments in project. 22 apartments booked. 73% apartments booked.
Total 15962 Sq.ft. saleable area. 12679 saleable area booked.
79% area booked.

Harshal Co-Op Housing Society Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Harshal Co-Op Housing Society LtdSep 202481010820
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.6 Sq.mts. ( 448 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK41.92 Sq.mts. ( 451 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK41.97 Sq.mts. ( 452 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK43.31 Sq.mts. ( 466 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK46.26 Sq.mts. ( 498 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK REHAB38.98 Sq.mts. ( 420 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 RK REHAB30.89 Sq.mts. ( 332 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK30.89 Sq.mts. ( 332 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK27.9 Sq.mts. ( 300 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK REHAB52.22 Sq.mts. ( 562 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK REHAB56.77 Sq.mts. ( 611 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 bHK REHAB57.97 Sq.mts. ( 624 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK REHAB58.08 Sq.mts. ( 625 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK REHAB58.23 Sq.mts. ( 627 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK REHAB61.15 Sq.mts. ( 658 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB71.29 Sq.mts. ( 767 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK REHAB75.89 Sq.mts. ( 817 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK130.61 Sq.mts. ( 1406 Sq.ft. )1
1 Booked100% Booked
100% Booked
30 total apartments / 22 apartments booked. 73% apartments booked.
Work Description in Building Harshal Co-Op Housing Society LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Veena Developers
for Project
Harshal Co-Op Housing Society Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation