Project overview

Guru Atman A,B ,H is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020725. Guru Atman A,B ,H is located at 20 2111 21 12 24 1A 24 1B. This is a New being developed by Guru Ashish Corporation.

Guru Atman A,B ,H has 1 Bhk & 2 Bhk Apartments with carpet areas ranging from 486 to 676 Sq.ft. Carpet. The Project has total 270 of which 270 are currently available for sale.

Guru Atman A,B ,H is being developed on a total land area of 66532 Sq.ft. out of which 27970 Sq.ft. i.e 42% is reserved for recreational purposes. Guru Atman A,B ,H has 3 Wings / Towers A Wing,B Wing,H Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Guru Atman A,B ,H
  • Location:
  • 20 2111 21 12 24 1A 24 1B
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Guru Ashish Corporation
  • Phone:
  • Address:
  • Western Edge Ii
Project RERA Details
MAHA REARA No: P51700020725
Project Type Others
RERA Project Status New
Architect Credible Designs
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 06 May 2019
Last Retrived 26 Jul 2025
Guru Atman A,B ,H QR Code
Guru Atman A,B ,H
MahaRERA - P51700020725
Apartment Details & Configuration
TypeArea
2 Bhk57.54 Sq.mts. ( 619 Sq.ft. )
2 Bhk57.99 Sq.mts. ( 624 Sq.ft. )
2 Bhk58.45 Sq.mts. ( 629 Sq.ft. )
2 Bhk58.9 Sq.mts. ( 634 Sq.ft. )
2 Bhk60.5 Sq.mts. ( 651 Sq.ft. )
2 Bhk60.59 Sq.mts. ( 652 Sq.ft. )
2 Bhk60.94 Sq.mts. ( 656 Sq.ft. )
2 Bhk60.95 Sq.mts. ( 656 Sq.ft. )
2 Bhk61.04 Sq.mts. ( 657 Sq.ft. )
3 Bhk75.97 Sq.mts. ( 818 Sq.ft. )
3 Bhk80.47 Sq.mts. ( 866 Sq.ft. )
Shop11.01 Sq.mts. ( 119 Sq.ft. )
Shop11.28 Sq.mts. ( 121 Sq.ft. )
Shop12.14 Sq.mts. ( 131 Sq.ft. )
Shop12.48 Sq.mts. ( 134 Sq.ft. )
Shop13.07 Sq.mts. ( 141 Sq.ft. )
Shop13.26 Sq.mts. ( 143 Sq.ft. )
Shop13.92 Sq.mts. ( 150 Sq.ft. )
Shop14.03 Sq.mts. ( 151 Sq.ft. )
Shop14.87 Sq.mts. ( 160 Sq.ft. )
Shop16.1 Sq.mts. ( 173 Sq.ft. )
Shop19.09 Sq.mts. ( 205 Sq.ft. )
2 Bhk58.23 Sq.mts. ( 627 Sq.ft. )
2 Bhk58.49 Sq.mts. ( 630 Sq.ft. )
2 Bhk58.68 Sq.mts. ( 632 Sq.ft. )
2 Bhk58.94 Sq.mts. ( 634 Sq.ft. )
3 Bhk81.54 Sq.mts. ( 878 Sq.ft. )
3 Bhk81.72 Sq.mts. ( 880 Sq.ft. )
Shop11.41 Sq.mts. ( 123 Sq.ft. )
Shop12.41 Sq.mts. ( 134 Sq.ft. )
Shop12.73 Sq.mts. ( 137 Sq.ft. )
Shop16.59 Sq.mts. ( 179 Sq.ft. )
1 Bhk45.11 Sq.mts. ( 486 Sq.ft. )
1 Bhk45.56 Sq.mts. ( 490 Sq.ft. )
1 Bhk47.39 Sq.mts. ( 510 Sq.ft. )
1 Bhk47.84 Sq.mts. ( 515 Sq.ft. )
2 Bhk59.59 Sq.mts. ( 641 Sq.ft. )
2 Bhk60.04 Sq.mts. ( 646 Sq.ft. )
2 Bhk62.36 Sq.mts. ( 671 Sq.ft. )
2 Bhk62.81 Sq.mts. ( 676 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Guru Atman A,B ,Hlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space 80% completed
80% Complete
0
Community Buildings100% completed
95% Complete
Club House Completed
Electrical Meter Room, Sub-Station, Receiving Station
Substation 100% Complete
Energy management
0
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting8% completed
8% Complete
Completed With C To G
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)10% completed
10% Complete
Completed With C To G
Solid Waste Management And Disposal100% completed
95% Complete
Completed With Wings C To G
Storm Water Drains
0
Street Lighting100% completed
95% Complete
Completed With Wings C To G
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed With Wings C To G
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Guru Atman A,B ,H
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Guru Atman A,B ,H by Guru Ashish Corporationlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

66532 Sq. ft.

Project Area

27970 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

270 apartments in total
Total
270
Booked
0
Available
270

Saleable Area Statistics (Sq. ft.)

167600 Total
Total
167600
Booked
0
Available
167600
Total 270 apartments in project. 0 apartments booked. 0% apartments booked.
Total 167600 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 2022231010101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 Bhk57.54 Sq.mts. ( 619 Sq.ft. )11
None Booked0% Booked
0% Booked
2 Bhk57.99 Sq.mts. ( 624 Sq.ft. )12
None Booked0% Booked
0% Booked
2 Bhk58.45 Sq.mts. ( 629 Sq.ft. )11
None Booked0% Booked
0% Booked
2 Bhk58.9 Sq.mts. ( 634 Sq.ft. )12
None Booked0% Booked
0% Booked
2 Bhk60.5 Sq.mts. ( 651 Sq.ft. )11
None Booked0% Booked
0% Booked
2 Bhk60.59 Sq.mts. ( 652 Sq.ft. )18
None Booked0% Booked
0% Booked
2 Bhk60.94 Sq.mts. ( 656 Sq.ft. )9
None Booked0% Booked
0% Booked
2 Bhk60.95 Sq.mts. ( 656 Sq.ft. )12
None Booked0% Booked
0% Booked
2 Bhk61.04 Sq.mts. ( 657 Sq.ft. )9
None Booked0% Booked
0% Booked
3 Bhk75.97 Sq.mts. ( 818 Sq.ft. )3
None Booked0% Booked
0% Booked
3 Bhk80.47 Sq.mts. ( 866 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop11.01 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.28 Sq.mts. ( 121 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.14 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.48 Sq.mts. ( 134 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.07 Sq.mts. ( 141 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.26 Sq.mts. ( 143 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.92 Sq.mts. ( 150 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.03 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.87 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.1 Sq.mts. ( 173 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop19.09 Sq.mts. ( 205 Sq.ft. )1
None Booked0% Booked
0% Booked
122 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 2022231010111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 Bhk58.23 Sq.mts. ( 627 Sq.ft. )11
None Booked0% Booked
0% Booked
2 Bhk58.49 Sq.mts. ( 630 Sq.ft. )11
None Booked0% Booked
0% Booked
2 Bhk58.68 Sq.mts. ( 632 Sq.ft. )12
None Booked0% Booked
0% Booked
2 Bhk58.94 Sq.mts. ( 634 Sq.ft. )12
None Booked0% Booked
0% Booked
2 Bhk60.59 Sq.mts. ( 652 Sq.ft. )18
None Booked0% Booked
0% Booked
2 Bhk61.04 Sq.mts. ( 657 Sq.ft. )18
None Booked0% Booked
0% Booked
3 Bhk75.97 Sq.mts. ( 818 Sq.ft. )3
None Booked0% Booked
0% Booked
3 Bhk80.47 Sq.mts. ( 866 Sq.ft. )2
None Booked0% Booked
0% Booked
3 Bhk81.54 Sq.mts. ( 878 Sq.ft. )11
None Booked0% Booked
0% Booked
3 Bhk81.72 Sq.mts. ( 880 Sq.ft. )12
None Booked0% Booked
0% Booked
Shop11.01 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.41 Sq.mts. ( 123 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.14 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.41 Sq.mts. ( 134 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.73 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.26 Sq.mts. ( 143 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.03 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.87 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.1 Sq.mts. ( 173 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.59 Sq.mts. ( 179 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.09 Sq.mts. ( 205 Sq.ft. )1
None Booked0% Booked
0% Booked
121 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H WingDec 20227101071
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 Bhk45.11 Sq.mts. ( 486 Sq.ft. )3
None Booked0% Booked
0% Booked
1 Bhk45.56 Sq.mts. ( 490 Sq.ft. )4
None Booked0% Booked
0% Booked
1 Bhk47.39 Sq.mts. ( 510 Sq.ft. )3
None Booked0% Booked
0% Booked
1 Bhk47.84 Sq.mts. ( 515 Sq.ft. )4
None Booked0% Booked
0% Booked
2 Bhk59.59 Sq.mts. ( 641 Sq.ft. )3
None Booked0% Booked
0% Booked
2 Bhk60.04 Sq.mts. ( 646 Sq.ft. )4
None Booked0% Booked
0% Booked
2 Bhk62.36 Sq.mts. ( 671 Sq.ft. )3
None Booked0% Booked
0% Booked
2 Bhk62.81 Sq.mts. ( 676 Sq.ft. )3
None Booked0% Booked
0% Booked
27 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Guru Ashish Corporation
for Project
Guru Atman A,B ,H
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation