Project overview

Greenpark-Orchid is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000010466. Greenpark-Orchid is located at 401502, Palghar. This is a On-Going Project being developed by Relstruct Buildcon Limited.

Greenpark-Orchid has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 254 to 511 Sq.ft. Carpet. The Project has total 114 of which 23 are currently available for sale.

Greenpark-Orchid is being developed on a total land area of 56446 Sq.ft. Greenpark-Orchid has 4 Wings / Towers Building No 1,Building No 2,Building No 3,Building No 4

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Greenpark-Orchid
  • Location:
  • 401502, Palghar
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Relstruct Buildcon Limited
  • Phone:
  • Address:
  • B-201/202, Sunshine Plaza,Junction Of Subhash Lane, Kedarmal Road, Near Children'S Academy School, Malad East, 400097
Project RERA Details
MAHA REARA No: P99000010466
Project Type Others
RERA Project Status On-Going Project
Funding Bank BANK OF INDIA
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Oct 2023
Litigations No Litigations
Last Modified 25 May 2022
Last Retrived 28 Jul 2025
Greenpark-Orchid QR Code
Greenpark-Orchid
MahaRERA - P99000010466
Apartment Details & Configuration
TypeArea
1 BHK30.44 Sq.mts. ( 328 Sq.ft. )
1 BHK34.86 Sq.mts. ( 375 Sq.ft. )
1RK32.07 Sq.mts. ( 345 Sq.ft. )
1RK23.58 Sq.mts. ( 254 Sq.ft. )
2 BHK47.46 Sq.mts. ( 511 Sq.ft. )
1 BHK34.36 Sq.mts. ( 370 Sq.ft. )
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )
1 BHK34.87 Sq.mts. ( 375 Sq.ft. )
1RK23.92 Sq.mts. ( 257 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Greenpark-Orchidlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Borewell Has Been Provided
Buildings / Wings in Greenpark-Orchid
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Greenpark-Orchid by Relstruct Buildcon Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

56446 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

114 apartments in total
Total
114
Booked
91
Available
23

Saleable Area Statistics (Sq. ft.)

40925 Total
Total
40925
Booked
32954
Available
7971
Total 114 apartments in project. 91 apartments booked. 79% apartments booked.
Total 40925 Sq.ft. saleable area. 32954 saleable area booked.
81% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Jan 190031010221
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.44 Sq.mts. ( 328 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK34.86 Sq.mts. ( 375 Sq.ft. )16
15 Booked93% Booked
93% Booked
1RK32.07 Sq.mts. ( 345 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK23.58 Sq.mts. ( 254 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK47.46 Sq.mts. ( 511 Sq.ft. )2
2 Booked100% Booked
100% Booked
27 total apartments / 23 apartments booked. 85% apartments booked.
Work Description in Building Building No 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Jan 190031010221
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.44 Sq.mts. ( 328 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK34.36 Sq.mts. ( 370 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK34.86 Sq.mts. ( 375 Sq.ft. )12
12 Booked100% Booked
100% Booked
1RK23.58 Sq.mts. ( 254 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK47.46 Sq.mts. ( 511 Sq.ft. )3
3 Booked100% Booked
100% Booked
30 total apartments / 23 apartments booked. 76% apartments booked.
Work Description in Building Building No 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Jan 190031010221
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.36 Sq.mts. ( 327 Sq.ft. )9
6 Booked66% Booked
66% Booked
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK34.86 Sq.mts. ( 375 Sq.ft. )12
12 Booked100% Booked
100% Booked
1RK23.58 Sq.mts. ( 254 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK47.46 Sq.mts. ( 511 Sq.ft. )3
3 Booked100% Booked
100% Booked
30 total apartments / 24 apartments booked. 80% apartments booked.
Work Description in Building Building No 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress21% done
21% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Jan 190031010221
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.36 Sq.mts. ( 370 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK34.87 Sq.mts. ( 375 Sq.ft. )5
3 Booked60% Booked
60% Booked
1RK23.58 Sq.mts. ( 254 Sq.ft. )3
3 Booked100% Booked
100% Booked
1RK23.92 Sq.mts. ( 257 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK32.07 Sq.mts. ( 345 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK47.46 Sq.mts. ( 511 Sq.ft. )2
2 Booked100% Booked
100% Booked
27 total apartments / 21 apartments booked. 77% apartments booked.
Work Description in Building Building No 4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress45% done
45% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Relstruct Buildcon Limited
for Project
Greenpark-Orchid
last updated on 28 Jul 2025 as per information obtained from MARA RERA.