Project overview

Green Willows Phase Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012825. Green Willows Phase Ii is located at 59 61 62 64 65 66 67 84A 84B 85A 85B 86A 86B 102. This is a Ongoing being developed by Green Lifespaces.

Green Willows Phase Ii has Bungalow Apartments with carpet areas ranging from 723 to 723 Sq.ft. Carpet. The Project has total 11 of which 1 are currently available for sale.

Green Willows Phase Ii is being developed on a total land area of 27696 Sq.ft. Green Willows Phase Ii has 10 Wings / Towers 59,61,Green Willows Phase Ii No 64,Row Villa No 84A B,Row Villa No 85B,Row Villa No 86A,Row Villa No 86B,Villa No 102,Villa No 62,Villa No 85A

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Green Willows Phase Ii
  • Location:
  • 59 61 62 64 65 66 67 84A 84B 85A 85B 86A 86B 102
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Green Lifespaces
  • Phone:
  • Address:
  • Orion Business Park
Project RERA Details
MAHA REARA No: P51700012825
Project Type Mixed
RERA Project Status Ongoing
Architect Navrachana Architect & Interior Designers
Funding Bank G P PARSIK BANK
Proposed Possession 30 Jun 2021
Revised Possession 30 Jun 2021
Extended Possession
Litigations No Litigations
Last Modified 16 Jan 2021
Last Retrived 26 Jul 2025
Green Willows Phase Ii QR Code
Green Willows Phase Ii
MahaRERA - P51700012825
Apartment Details & Configuration
TypeArea
Bungalow106.9 Sq.mts. ( 1151 Sq.ft. )
Bungalow144 Sq.mts. ( 1550 Sq.ft. )
Villa82.64 Sq.mts. ( 890 Sq.ft. )
Bungalow86 Sq.mts. ( 926 Sq.ft. )
Bungalow67.2 Sq.mts. ( 723 Sq.ft. )
Bungalow131 Sq.mts. ( 1410 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Green Willows Phase Iilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space25% completed
25% Complete
-
Community Buildings
Na
Compound Retaining Wall20% completed
20% Complete
-
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
-
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting60% completed
60% Complete
-
Levelling Work80% completed
80% Complete
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains20% completed
20% Complete
-
Street Lighting20% completed
20% Complete
-
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting30% completed
30% Complete
-
Water Supply40% completed
40% Complete
-
Buildings / Wings in Green Willows Phase Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Green Willows Phase Ii by Green Lifespaceslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

27696 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

11 apartments in total
Total
11
Booked
10
Available
1

Saleable Area Statistics (Sq. ft.)

11155 Total
Total
11155
Booked
10266
Available
890
Total 11 apartments in project. 10 apartments booked. 90% apartments booked.
Total 11155 Sq.ft. saleable area. 10266 saleable area booked.
92% area booked.

59

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
59Jun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow106.9 Sq.mts. ( 1151 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building 59Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

61

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
61Jun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow144 Sq.mts. ( 1550 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building 61Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Green Willows Phase Ii No 64

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Green Willows Phase Ii No 64Jan 19002100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Villa82.64 Sq.mts. ( 890 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Green Willows Phase Ii No 64Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked

Row Villa No 84A B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Row Villa No 84A BJun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow86 Sq.mts. ( 926 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 total apartments / 2 apartments booked. 100% apartments booked.
Work Description in Building Row Villa No 84A BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Row Villa No 85B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Row Villa No 85BJun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow67.2 Sq.mts. ( 723 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Row Villa No 85BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Row Villa No 86A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Row Villa No 86AJun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow67.2 Sq.mts. ( 723 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Row Villa No 86ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Row Villa No 86B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Row Villa No 86BJun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow67.2 Sq.mts. ( 723 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Row Villa No 86BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Villa No 102

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Villa No 102Jun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow131 Sq.mts. ( 1410 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Villa No 102Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Villa No 62

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Villa No 62Jun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow131 Sq.mts. ( 1410 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Villa No 62Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Villa No 85A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Villa No 85AJun 20212100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow67.2 Sq.mts. ( 723 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Villa No 85ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Green Lifespaces
for Project
Green Willows Phase Ii
last updated on 26 Jul 2025 as per information obtained from MARA RERA.