Project overview

Green View Apartment is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000049207. Green View Apartment is located at Survey No 185 Hissa No 1,2. This is a New being developed by Delight Developers.

Green View Apartment has 1 BHK & Shop Apartments with carpet areas ranging from 118 to 361 Sq.ft. Carpet. The Project has total 456 of which 425 are currently available for sale.

Green View Apartment is being developed on a total land area of 16281 Sq.ft. Green View Apartment has 4 Wings / Towers Building No 3 Wing C,Building No 3 Wing D,Building No 3 Wing E,Building No 3 Wing F

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Green View Apartment
  • Location:
  • Survey No 185 Hissa No 1,2
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Delight Developers
  • Phone:
  • Address:
  • Na
Project RERA Details
MAHA REARA No: P99000049207
Project Type Others
RERA Project Status New
Architect Sanat Mehta
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Feb 2023
Last Retrived 28 Jul 2025
Green View Apartment QR Code
Green View Apartment
MahaRERA - P99000049207
Apartment Details & Configuration
TypeArea
1 BHK26.5 Sq.mts. ( 285 Sq.ft. )
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )
1RK18.05 Sq.mts. ( 194 Sq.ft. )
1 BHK27.35 Sq.mts. ( 294 Sq.ft. )
1 BHK33.53 Sq.mts. ( 361 Sq.ft. )
Shop10.95 Sq.mts. ( 118 Sq.ft. )
Shop11.28 Sq.mts. ( 121 Sq.ft. )
Shop13.08 Sq.mts. ( 141 Sq.ft. )
Shop14.8 Sq.mts. ( 159 Sq.ft. )
Shop15.26 Sq.mts. ( 164 Sq.ft. )
Shop17.84 Sq.mts. ( 192 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Green View Apartmentlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided
Energy management
Will Be Provided
Fire Protection And Fire Safety Requirements
Will Be Provided
Landscaping & Tree Planting
Will Be Provided
Open Parking
Will Be Provided
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Provided
Solid Waste Management And Disposal
Will Be Provided
Storm Water Drains
Will Be Provided
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Will Be Provided
Water Conservation, Rain water Harvesting
Will Be Provided
Water Supply
Will Be Provided
Buildings / Wings in Green View Apartment
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Green View Apartment by Delight Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

16281 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

456 apartments in total
Total
456
Booked
31
Available
425

Saleable Area Statistics (Sq. ft.)

132896 Total
Total
132896
Booked
8193
Available
124703
Total 456 apartments in project. 31 apartments booked. 6% apartments booked.
Total 132896 Sq.ft. saleable area. 8193 saleable area booked.
6% area booked.

Building No 3 Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 Wing CDec 202614101032621
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.5 Sq.mts. ( 285 Sq.ft. )77
None Booked0% Booked
0% Booked
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )29
None Booked0% Booked
0% Booked
1RK18.05 Sq.mts. ( 194 Sq.ft. )4
None Booked0% Booked
0% Booked
110 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 3 Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 3 Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 Wing DDec 202614100032621
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.5 Sq.mts. ( 285 Sq.ft. )80
1 BHK27.35 Sq.mts. ( 294 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )26
1 BHK33.53 Sq.mts. ( 361 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.95 Sq.mts. ( 118 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop11.28 Sq.mts. ( 121 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.08 Sq.mts. ( 141 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop14.8 Sq.mts. ( 159 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop15.26 Sq.mts. ( 164 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop17.84 Sq.mts. ( 192 Sq.ft. )2
1 Booked50% Booked
50% Booked
122 total apartments / 10 apartments booked. 8% apartments booked.
Work Description in Building Building No 3 Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress37% done
37% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress37% done
37% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

Building No 3 Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 Wing EDec 202614101032621
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.5 Sq.mts. ( 285 Sq.ft. )77
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )29
1RK18.05 Sq.mts. ( 194 Sq.ft. )4
1 Booked25% Booked
25% Booked
110 total apartments / 3 apartments booked. 2% apartments booked.
Work Description in Building Building No 3 Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 3 Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3 Wing FDec 202614100032621
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.5 Sq.mts. ( 285 Sq.ft. )74
1 BHK27.35 Sq.mts. ( 294 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )24
6 Booked25% Booked
25% Booked
1 BHK33.53 Sq.mts. ( 361 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.95 Sq.mts. ( 118 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop11.28 Sq.mts. ( 121 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.08 Sq.mts. ( 141 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop14.8 Sq.mts. ( 159 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop15.26 Sq.mts. ( 164 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop17.84 Sq.mts. ( 192 Sq.ft. )2
1 Booked50% Booked
50% Booked
114 total apartments / 18 apartments booked. 15% apartments booked.
Work Description in Building Building No 3 Wing FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress37% done
37% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress37% done
37% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked
Channel Partners
Channel Partners Registered by Developer
Delight Developers
for Project
Green View Apartment
last updated on 28 Jul 2025 as per information obtained from MARA RERA.