Project overview

Green Valley Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020467. Green Valley Phase I is located at 63 Part, 64/2 Part, 66/2 Part. This is a New being developed by Green Developers.

Green Valley Phase I has FLAT 1 BHK Apartments with carpet areas ranging from 330 to 330 Sq.ft. Carpet. The Project has total 160 of which 160 are currently available for sale.

Green Valley Phase I is being developed on a total land area of 60115 Sq.ft. Green Valley Phase I has 2 Wings / Towers Building A2,Building Ews/Lig B1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Green Valley Phase I
  • Location:
  • 63 Part, 64/2 Part, 66/2 Part
  • Const. Stage:
    New
  • Possession:
    01 Apr 2025
Developer Details

  • Developer:
    Green Developers
  • Phone:
  • Address:
  • Sana Apartment
Project RERA Details
MAHA REARA No: P51700020467
Project Type Others
RERA Project Status New
Architect Sandeep Prabhu
Funding Bank UNION BANK OF INDIA
Proposed Possession 01 Apr 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Apr 2019
Last Retrived 26 Jul 2025
Green Valley Phase I QR Code
Green Valley Phase I
MahaRERA - P51700020467
Apartment Details & Configuration
TypeArea
1 BHK44.77 Sq.mts. ( 482 Sq.ft. )
1 BHK45.72 Sq.mts. ( 492 Sq.ft. )
2 BHK65.41 Sq.mts. ( 704 Sq.ft. )
2 BHK67.33 Sq.mts. ( 725 Sq.ft. )
2 BHK67.66 Sq.mts. ( 728 Sq.ft. )
2 BHK69.7 Sq.mts. ( 750 Sq.ft. )
Shop24.4 Sq.mts. ( 263 Sq.ft. )
Shop30.92 Sq.mts. ( 333 Sq.ft. )
Shop31.32 Sq.mts. ( 337 Sq.ft. )
Shop31.58 Sq.mts. ( 340 Sq.ft. )
Shop32 Sq.mts. ( 344 Sq.ft. )
Shop32.54 Sq.mts. ( 350 Sq.ft. )
Shop33.55 Sq.mts. ( 361 Sq.ft. )
Shop33.69 Sq.mts. ( 363 Sq.ft. )
Shop33.89 Sq.mts. ( 365 Sq.ft. )
Shop38.89 Sq.mts. ( 419 Sq.ft. )
Shop41.61 Sq.mts. ( 448 Sq.ft. )
Shop41.84 Sq.mts. ( 450 Sq.ft. )
Shop44.64 Sq.mts. ( 481 Sq.ft. )
FLAT 1 BHK30.64 Sq.mts. ( 330 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Green Valley Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Commenced
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Commenced
Energy management
Solarwater Heating System Tobe Installed Before Oc
Fire Protection And Fire Safety Requirements
Work Not Commenced
Landscaping & Tree Planting
Work Not Commenced
Open Parking
Work Not Commenced
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Commenced
Solid Waste Management And Disposal
Work Not Commenced
Storm Water Drains
Work Not Commenced
Street Lighting
Work Not Commenced
Treatment And Disposal Of Sewage And Sullage Water
Work Not Commenced
Water Conservation, Rain water Harvesting
Rain Water Harvesting To Be Implemented Before Oc
Water Supply
Connection After Occupation Certificate
Buildings / Wings in Green Valley Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Green Valley Phase I by Green Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

60115 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

160 apartments in total
Total
160
Booked
0
Available
160

Saleable Area Statistics (Sq. ft.)

81931 Total
Total
81931
Booked
0
Available
81931
Total 160 apartments in project. 0 apartments booked. 0% apartments booked.
Total 81931 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building A2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building A2Jan 2024241011300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.77 Sq.mts. ( 482 Sq.ft. )24
None Booked0% Booked
0% Booked
1 BHK45.72 Sq.mts. ( 492 Sq.ft. )42
None Booked0% Booked
0% Booked
2 BHK65.41 Sq.mts. ( 704 Sq.ft. )14
None Booked0% Booked
0% Booked
2 BHK67.33 Sq.mts. ( 725 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK67.66 Sq.mts. ( 728 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK69.7 Sq.mts. ( 750 Sq.ft. )10
None Booked0% Booked
0% Booked
Shop24.4 Sq.mts. ( 263 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop30.92 Sq.mts. ( 333 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop31.32 Sq.mts. ( 337 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop31.58 Sq.mts. ( 340 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32 Sq.mts. ( 344 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32.54 Sq.mts. ( 350 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop33.55 Sq.mts. ( 361 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop33.69 Sq.mts. ( 363 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop33.89 Sq.mts. ( 365 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.89 Sq.mts. ( 419 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop41.61 Sq.mts. ( 448 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop41.84 Sq.mts. ( 450 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop44.64 Sq.mts. ( 481 Sq.ft. )1
None Booked0% Booked
0% Booked
127 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building A2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress43% done
43% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress43% done
43% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress48% done
48% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress88% done
88% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress88% done
88% Booked

Building Ews/Lig B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Ews/Lig B1Jan 20247101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT 1 BHK30.64 Sq.mts. ( 330 Sq.ft. )33
None Booked0% Booked
0% Booked
33 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Ews/Lig B1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Green Developers
for Project
Green Valley Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation