Project overview

Green Valley is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700017701. Green Valley is located at 65. This is a New being developed by M S Developers.

Green Valley has 1 BHK & 2 BHK Apartments with carpet areas ranging from 4889 to 8749 Sq.ft. Carpet. The Project has total 129 of which 94 are currently available for sale.

Green Valley is being developed on a total land area of 57480 Sq.ft. out of which 5382 Sq.ft. i.e 9% is reserved for recreational purposes. Green Valley has 5 Wings / Towers Clover,Lily,Lotus,Orchid,Rose

ProjectDeveloperLocationPossession
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Shreyas SapphireVinod Premjibhai TrapasiaPlot No- 1D-2 Sector-3A Karanjade Panvel Navi Mumbai31-03-2025 00:00:00
Upper Thane-Mlcp C ShopsMacrotech Developers Limited60/2 Part,60/1 Part31-12-2024 00:00:00
Innovative Infocom And It ParksInnovative Infocom & It Parks Private LimitedPlot No. Gen 71/1 And Gen 71/1/126-11-2027 00:00:00
Prem Ratna PlazaAditi Home MakerSurvey No 84 Hissa No 331-12-2027 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Arnav Wing DPrashant Raghunath PatilGut No 55 Hissa No 131-12-2027 00:00:00
Smit VistaSmit Megastructures(Old) Survey No. 242/17, 18,, ( New) Survey No. 33/17, 1831-12-2029 00:00:00
Ram Smruti Chs LtdSai Prakash Builders And DevelopersPlot No 139 Cts No 392531-12-2026 00:00:00
Kamdhenu CrownKamdhenu GreenPlot No-6+7, Sector-19, Sanpada31-12-2029 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Belvedere IMacrotech Developers Limited25/2A Part 25/2B Part31-07-2028 00:00:00
Jay Meghdoot ChslS R DevelopersS.No.46/H.No.6/A/13,Plot No.2731-12-2025 00:00:00
Foresta EMacrotech Developers Limited53/1(Part), 53/2(Part), 53/3(Part)31-08-2028 00:00:00
Paras Apartment Co-Op. Housing Society LtdShiv Infra1314, Village Kohoj-Khuntvali02-06-2027 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Project Details
  • Project:
    Green Valley
  • Location:
  • 65
  • Const. Stage:
    New
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    M S Developers
  • Phone:
  • Address:
  • Lotus Building
Project RERA Details
MAHA REARA No: P51700017701
Project Type Others
RERA Project Status New
Architect De Con Consultant
Funding Bank THE KALYAN JANATA SAHAKARI BANK LTD.
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 May 2025
Last Retrived 26 Jul 2025
Green Valley QR Code
Green Valley
MahaRERA - P51700017701
Apartment Details & Configuration
TypeArea
1 BHK721.22 Sq.mts. ( 7763 Sq.ft. )
1RK89.08 Sq.mts. ( 959 Sq.ft. )
1 BHK657.51 Sq.mts. ( 7077 Sq.ft. )
1RK42.03 Sq.mts. ( 452 Sq.ft. )
Shop83.31 Sq.mts. ( 897 Sq.ft. )
1 BHK695.05 Sq.mts. ( 7482 Sq.ft. )
2 BHK447 Sq.mts. ( 4812 Sq.ft. )
1RK240.63 Sq.mts. ( 2590 Sq.ft. )
1 BHK812.76 Sq.mts. ( 8749 Sq.ft. )
2 BHK454.24 Sq.mts. ( 4889 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Green Valleylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Yet To Start
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Yet To Start
Open Parking
Yet To Start
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Start
Solid Waste Management And Disposal
Yet To Start
Storm Water Drains
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Yet To Start
Water Conservation, Rain water Harvesting
Na
Water Supply
Yet To Start
Buildings / Wings in Green Valley
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Green Valley by M S Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

57480 Sq. ft.

Project Area

5382 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

129 apartments in total
Total
129
Booked
35
Available
94

Saleable Area Statistics (Sq. ft.)

817084 Total
Total
817084
Booked
220889
Available
596196
Total 129 apartments in project. 35 apartments booked. 27% apartments booked.
Total 817084 Sq.ft. saleable area. 220889 saleable area booked.
27% area booked.

Clover

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
CloverDec 20235201001010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK721.22 Sq.mts. ( 7763 Sq.ft. )24
13 Booked54% Booked
54% Booked
1RK89.08 Sq.mts. ( 959 Sq.ft. )4
None Booked0% Booked
0% Booked
28 total apartments / 13 apartments booked. 46% apartments booked.
Work Description in Building CloverCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Lily

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
LilyDec 20235103030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK657.51 Sq.mts. ( 7077 Sq.ft. )21
14 Booked66% Booked
66% Booked
1RK42.03 Sq.mts. ( 452 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop83.31 Sq.mts. ( 897 Sq.ft. )4
None Booked0% Booked
0% Booked
27 total apartments / 15 apartments booked. 55% apartments booked.
Work Description in Building LilyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Lotus

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
LotusDec 2022820140140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK695.05 Sq.mts. ( 7482 Sq.ft. )22
None Booked0% Booked
0% Booked
2 BHK447 Sq.mts. ( 4812 Sq.ft. )10
None Booked0% Booked
0% Booked
32 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building LotusCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Orchid

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
OrchidDec 2023520100100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK240.63 Sq.mts. ( 2590 Sq.ft. )11
6 Booked54% Booked
54% Booked
11 total apartments / 6 apartments booked. 54% apartments booked.
Work Description in Building OrchidCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress96% done
96% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Rose

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
RoseDec 20188201401414
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK812.76 Sq.mts. ( 8749 Sq.ft. )21
None Booked0% Booked
0% Booked
2 BHK454.24 Sq.mts. ( 4889 Sq.ft. )10
31 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building RoseCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
M S Developers
for Project
Green Valley
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation