Green Avenue 1B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006081. Green Avenue 1B is located at Ke61qela3zr4a4ipnvsxcwbs4lqigpkvrmt+Vfevrbsm+Uqepzt1qo7rkgwb+Lqi. This is a Ongoing being developed by Param Developers.

Green Avenue 1B has 1 BHKTYPEF, 1 BHKTYPEG, 1 BHKTYPEJ, 2 BHKTYPEE, Shop No 10, Shop No 11, Shop No 12, Shop No 13, Shop no 14, Shop No 15 & Shop No 16 Apartments with carpet areas ranging from 137 to 584 Sq.ft. Carpet. The Project has total 95 of which 16 are currently available for sale.

Green Avenue 1B is being developed on a total land area of 57264 Sq.ft. out of which 9091 Sq.ft. i.e 16% is reserved for recreational purposes. Green Avenue 1B has 1 Wings / Towers 1B

ProjectDeveloperLocationPossession
Quality AnnexQuality AnnexTid1fuidtukqxhyjpd3twnm23bunqcfkrk3phkapbca=30-09-2026 00:00:00
Shree Siddhganesh TapovanShree Siddhganesh EnterprisesXovr+9Lhk+Y8f9jhlu+Z9w==30-06-2022 00:00:00
Safa ComplexSafa EnterprisesB8ikovkm56uzwhestf+Jea==30-12-2025 00:00:00
ParamountMetro Dream HomesJxwficnqk+2Jl1ythdpaly448fli7xziokfq0lgnk0x9j5e8ynkibhislyprpvwlmav/Hg80yiongpliw9id1ul+Gm240jhgwcmwwtgkuze=30-12-2026 00:00:00
Shree Shripat VillaShree Shripat Builders &Amp; DevelopersShilgon, Thane, 421204, Near Ganesh Mandir Parisar30-09-2023 00:00:00
Haware My First Home Shil Phata Phase 1 Bldg 1Haware Properties Llp1F8kvr8ual0ct7sim/Zj/M8eghdo2mtb8tnfopuv7sjmcem0qcag3jgqdm3mvex331-12-2030 00:00:00
Haware My First Home Shil Phata Phase 1 Bldg 2Haware Properties Llp1F8kvr8ual0ct7sim/Zj/M8eghdo2mtb8tnfopuv7sjmcem0qcag3jgqdm3mvex331-12-2030 00:00:00
Haware My First Home Shil Phata Phase 2 Bldg 1Haware Properties LlpO2polikr2etr2gib/Uckdrzzgclhmnkh5xz+Ktxgeza=31-12-2030 00:00:00
Haware My First Home Shil Phata Phase 2 Bldg 2Haware Properties LlpO2polikr2etr2gib/Uckdrzzgclhmnkh5xz+Ktxgeza=31-12-2030 00:00:00
Shree Hari ResidencyM/S Shree Odhav Developers2Zjzq6wsxelzdumx69jgbbe1h58cdg9is04w88a+Bpk=30-06-2018 00:00:00
Green HeightsGreen Environment ConstructionsBt22bj2b/Wuttcdpooi5yq==30-12-2023 00:00:00
Green Avenue 1BParam DevelopersKe61qela3zr4a4ipnvsxcwbs4lqigpkvrmt+Vfevrbsm+Uqepzt1qo7rkgwb+Lqi30-12-2021 00:00:00
Sadguru ResidencyRam Laxman DevelopersBt22bj2b/Wuttcdpooi5yq==15-12-2019 00:00:00
Trinity Paradise Phase 1Trinity BuildersRswhoebqmzxw65gydxwnuq==30-03-2025 00:00:00
The Heavens PalaceGayasuddin Riyazuddin KhanS/1Sfoouwgtgwwbzjtv1tpfafq3kodpmeeueda20jo5t4ic4a7uwgnm4zweh1gie30-06-2025 00:00:00
Bharat Ecovistas Phase IiiBharat Realty Venture Private LimitedT7lsps4pbhtaqnr40ayk47kjh8mzahsbmpuuuigp0ri=31-12-2021 00:00:00
Quality Heights IiQuality Construction CoTjb660kt7+Eki2+Vb1qnlp4lplqohxc1ynl8/U9getk=30-12-2025 00:00:00
Mukta LuxuriaMukta RealityKhdikali Thane31-07-2021 00:00:00
Green Avenue 1AParam DevelopersNyqqsz1hmvkj0dycckeb9rdc09xxgo2trra0uaooduv24wiq8wbx4nrhrg/Pxq2n30-09-2018 00:00:00
Radheshyam RoyalRadheyshyam Roshanlal GuptaOkfgwicgbz2/N/6Qyyqxlw==31-12-2019 00:00:00
Sunrise Glory Phase IiSunrise Lifespaces Llp2Da3fpdi+Pdixd3zgzotca==30-12-2022 00:00:00
1St Phase Of ParaisoOm Aditya Associates5L3eogq4qoivr+8Dulyhn2ufpdntdam83f2as6fhzac=30-12-2021 00:00:00
PALMVISTA A1 & A2GLORY TOWNSHIP LLPVillage Daighar30-03-2024 00:00:00
Provident Palmvista B1Provident Housing Limited88/4, 89, 90/1, 90/2/4, 90/2/5, 90/4/230-06-2028 00:00:00
Provident Palmvista D4Provident Housing Limited884, 89, 901, 9024, 9025, 904230-06-2028 00:00:00
Provident Palmvista D3Provident Housing Limited884, 89 901, 9024, 9025, 904230-06-2028 00:00:00
Provident Palmvista D2Provident Housing Limited884, 89, 901, 9024, 9025, 904230-06-2028 00:00:00
Sunrise Glory - Phase ISunrise Lifespaces Llp2Da3fpdi+Pdixd3zgzotca==30-06-2018 00:00:00
Shivam EnclaveRAJARAM CONSTRUCTIONS. No. 47/1/B, S. No. 47/1/C30-09-2027 00:00:00
ATLANTAA ENCLAVE - IIATLANTAA LIMITEDSurvey No 67/B/1, 67/B/231-12-2028 00:00:00
Urban Hills Phase 1Lotus GroupCwwsn9ycd4agzpu8qakgnvqdygbk+Hhkfz32xdwwndre3fpztgxngdqiw067nqhp01-04-2028 00:00:00
Central PlazaAl Abraaj Enterprises31-12-2029 00:00:00
Hira Residency Phase IiAl Saad Constructions31-12-2030 00:00:00
Central VistaThe Capitalist Realty31-12-2030 00:00:00
Solitaire HeightsKanji Murji MangeMpmvmjjlkhj/B3grkq6/Zg==31-03-2029 00:00:00
M K Thakur Complex Phase 2Vraj Ratan Buildcon Pvt LtdCxiszcw3ebrl5vjmpb4mbvjiimpmpefxqpiicucbghy=01-06-2021 00:00:00
Chahu ApartmentMul Aakar DevelopersPfw3drq5qpkthk3bx7ckv/68Nawjcib1cexhtntic0k=30-12-2021 00:00:00
Project Details
  • Project:
    Green Avenue 1B
  • Location:
  • Ke61qela3zr4a4ipnvsxcwbs4lqigpkvrmt+Vfevrbsm+Uqepzt1qo7rkgwb+Lqi
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Param Developers
  • Phone:
  • Address:
  • Riddhi Siddhi
Project RERA Details
MAHA REARA No: P51700006081
Project Type Others
RERA Project Status Ongoing
Architect Archit Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2017
Last Retrived 13 Feb 2026
Green Avenue 1B QR Code
Green Avenue 1B
MahaRERA - P51700006081
Apartment Details & Configuration
TypeArea
1 BHKTYPEF36.93 Sq.mts. ( 398 Sq.ft. )
1 BHKTYPEG35.31 Sq.mts. ( 380 Sq.ft. )
1 BHKTYPEJ36.45 Sq.mts. ( 392 Sq.ft. )
2 BHKTYPEE54.3 Sq.mts. ( 584 Sq.ft. )
Shop No 1014.58 Sq.mts. ( 157 Sq.ft. )
Shop No 1112.75 Sq.mts. ( 137 Sq.ft. )
Shop No 1218.29 Sq.mts. ( 197 Sq.ft. )
Shop no 1415.23 Sq.mts. ( 164 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Green Avenue 1Blast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Done
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking100% completed
95% Complete
Done
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply100% completed
95% Complete
Done
Buildings / Wings in Green Avenue 1B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Green Avenue 1B by Param Developerslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

57264 Sq. ft.

Project Area

9091 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

95 apartments in total
Total
95
Booked
79
Available
16

Saleable Area Statistics (Sq. ft.)

39180 Total
Total
39180
Booked
32167
Available
7013
Total 95 apartments in project. 79 apartments booked. 83% apartments booked.
Total 39180 Sq.ft. saleable area. 32167 saleable area booked.
82% area booked.

1B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1BDec 202024204106
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPEF36.93 Sq.mts. ( 398 Sq.ft. )23
20 Booked86% Booked
86% Booked
1 BHKTYPEG35.31 Sq.mts. ( 380 Sq.ft. )23
19 Booked82% Booked
82% Booked
1 BHKTYPEJ36.45 Sq.mts. ( 392 Sq.ft. )23
18 Booked78% Booked
78% Booked
2 BHKTYPEE54.3 Sq.mts. ( 584 Sq.ft. )19
15 Booked78% Booked
78% Booked
Shop No 1014.58 Sq.mts. ( 157 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No 1112.75 Sq.mts. ( 137 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No 1218.29 Sq.mts. ( 197 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No 1318.29 Sq.mts. ( 197 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop no 1415.23 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No 1514.58 Sq.mts. ( 157 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No 1614.58 Sq.mts. ( 157 Sq.ft. )1
1 Booked100% Booked
100% Booked
95 total apartments / 79 apartments booked. 83% apartments booked.
Work Description in Building 1BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Param Developers
for Project
Green Avenue 1B
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation