Project overview

Gopeshwar Apartment is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800005914. Gopeshwar Apartment is located at Mumbai Suburban, 400099. This is a On-Going Project being developed by Mca Constructions.

Gopeshwar Apartment has 1 BHKTYPE1, 1 BHKTYPE2 & 2 BHKTYPE1 Apartments with carpet areas ranging from 484 to 684 Sq.ft. Carpet. The Project has total 105 of which 62 are currently available for sale.

Gopeshwar Apartment is being developed on a total land area of 51130 Sq.ft. Gopeshwar Apartment has 4 Wings / Towers A Wing,B Wing,C Wing,D Wing

ProjectDeveloperLocationPossession
Meghdoot ResidencyMilan Interbuilt Private Limited21531-03-2018 00:00:00
Hans EleganceShree Hans Realtors Llp1285 1285/1 To 230-09-2018 00:00:00
Ramchandra NiwasShree Tirupati DevelopersPlot No.189, Cts No. 1416, Survey No. 100030-12-2021 00:00:00
Gundecha DesireRockline Developers Pvt. Ltd.Cts 724/731-12-2018 00:00:00
Hubtown Sunmist A 6Th To Above FloorHubtown LimitedCts No 426 428 To 43031-12-2019 00:00:00
Hubtown SolarisHubtown Limited130-12-2022 00:00:00
Express EnclaveMd Globus Realty Pvt Ltd5231To37, 517, 523, 5201To230-09-2020 00:00:00
JuipterMarsland ProjectsMumbai Suburban, 40005528-09-2015 00:00:00
Rustomjee Central ParkCredence Property Developers Private Limited484 - 1 To 7, Cts No. 48430-03-2023 00:00:00
SafalyaVitae Constructions LlpPlot No. 25 / Cts No. 146/4730-06-2018 00:00:00
Vijayraj ResidencyVijayraj Realtors40005731-07-2024 00:00:00
Udyanjali ChsAshray Developers252/1230-12-2020 00:00:00
Panom Park Phase 1 Wing A B C And C ExtensionPanom Developers LlpCts 331 Cts 331/1 To 2 Cts 332 Cts 332/1 To 42 Cts 333 Pt Cts 354 Pt Cst 354/1 To 17 And Nala Land31-12-2019 00:00:00
Shree Madhusudan ChslSpark Builders & Infra Projects Pvt Ltd1165B31-12-2017 00:00:00
Gala QuestKarishma RealtyC.T.S. No.712, 712/1 To 830-06-2024 00:00:00
Amber ViharShah & Shah Construction Corporation365A 365/2A 365/431-03-2025 00:00:00
Pruthvi PushpanjaliFlying Earth Llp252/11 & 252/1430-06-2026 00:00:00
AmrapaliMangal Buildhome Private LimitedCts No 757 757 1 To 1830-12-2021 00:00:00
Medinee NiketanSs EnterpriseBamanwada30-12-2021 00:00:00
Pruthvi ShakunPruthvi Enterprise252/930-09-2023 00:00:00
DarshanArkade Developers Private LimitedPlot No. 74 B Part 1, 792 A 9 1, 792 A 10 2, Tps - I Of Vile Parle East, 792 A 13 5, 792 A 11 3, 792 A/10-4, 792 A/10-5 I.E. Cts No. 792 A, 792 A 12 430-06-2023 00:00:00
Solaris 14Th FloorHubtown Limited427/6, Cts No. 427/3, 427/7 And 45530-06-2026 00:00:00
Krishna Residences Phase 1Krishna Developers Pvt. Ltd379 379/1 And 2 381 382 382/1 To 4 384 386 389 389/1 To 330-12-2026 00:00:00
Satellite GlorySatellite Developers Pvt LtdCts No 13430-12-2020 00:00:00
Nidhaan HouseNidhaan Infracon Private Limited (Formerly Known As Ajab Real Estate Company Private Limited)428-B130-12-2023 00:00:00
VishakhaGreen Tree Lifescapes Llp75801-08-2022 00:00:00
Floors 8 And 9 - The Baya GoldspotRenaissance Spaces529, 529/1 To 529/32, 528/1 To 528/17, 535 Of Village Chakala30-12-2023 00:00:00
The Summit Business Bay AndheriOmkar Realtors And Developers Private LimitedCts No.265Pt 266Pt 266/93Pt 266/94Pt, 266/95Pt 266/96Pt 266/98Pt 266/99Pt 26630-06-2019 00:00:00
Atharv PalaceJagruti Enterprises1277 1277/1 To 330-12-2023 00:00:00
Suba ZirconSuba Realty Private Limited15 16 1730-04-2018 00:00:00
Ground Floor - The Baya GoldspotRenaissance Spaces40009931-12-2023 00:00:00
Mahakali HillsMohid Construction Co554 A Pt31-12-2024 00:00:00
Vishwas Niketan By ViiaanSomani Buildtech Llp146/25, 146/2631-12-2024 00:00:00
Nazareth NiketanMilan Interbuilt Private Limited14031-03-2018 00:00:00
AdityaNavkar Builder And DevelopersMaharashtra31-10-2012 00:00:00
7Th Floor - C Wing - The Baya GoldspotRenaissance Spaces535 Of Chakala, 529, 528, Andheri East, 529/1 To 529/3230-12-2023 00:00:00
Vireshwar Darshan Chs LtdVireshwar Darshan Chs Ltd63230-06-2024 00:00:00
Mantri Our HomePentagon Premises Private Limited822/3 To 631-03-2027 00:00:00
Sale Building 1 - Chamunda Crown And Sale Building 3 - Chamunda ClassicChamunda Builders & DevelopersCts No.294, 295, C.T.S. No.295/1 To 24, 296, 296/1 To 8, 297, 297/1 To 5, 386(Pt), Plot C, Plot F (Old Cts 325(Pt), 387 (Pt)31-12-2026 00:00:00
Project Details
  • Project:
    Gopeshwar Apartment
  • Location:
  • Mumbai Suburban, 400099
  • Const. Stage:
    On-Going Project
  • Possession:
    30 Jun 2016
Developer Details

  • Developer:
    Mca Constructions
  • Phone:
  • Address:
  • 601, Elecon Arcade, Marol Naka, Andheri East, Andheri Kurla Road, 400059
Project RERA Details
MAHA REARA No: P51800005914
Project Type Residential
RERA Project Status On-Going Project
Funding Bank ICICI BANK
Proposed Possession 30 Jun 2016
Revised Possession 30 Dec 2025
Extended Possession
Litigations Yes
Last Modified 07 Aug 2019
Last Retrived 28 Jul 2025
Gopeshwar Apartment QR Code
Gopeshwar Apartment
MahaRERA - P51800005914
Apartment Details & Configuration
TypeArea
1 BHKTYPE145.15 Sq.mts. ( 486 Sq.ft. )
2 BHKTYPE155.65 Sq.mts. ( 599 Sq.ft. )
1 BHKTYPE141.71 Sq.mts. ( 449 Sq.ft. )
1 BHKTYPE144.96 Sq.mts. ( 484 Sq.ft. )
2 BHKTYPE165.22 Sq.mts. ( 702 Sq.ft. )
1 BHKTYPE247.57 Sq.mts. ( 512 Sq.ft. )
2 BHKTYPE163.55 Sq.mts. ( 684 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Gopeshwar Apartmentlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Complete
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Gopeshwar Apartment
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gopeshwar Apartment by Mca Constructionslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

51130 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

105 apartments in total
Total
105
Booked
43
Available
62

Saleable Area Statistics (Sq. ft.)

56888 Total
Total
56888
Booked
22725
Available
34164
Total 105 apartments in project. 43 apartments booked. 40% apartments booked.
Total 56888 Sq.ft. saleable area. 22725 saleable area booked.
40% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 20248101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPE145.15 Sq.mts. ( 486 Sq.ft. )21
15 Booked71% Booked
71% Booked
2 BHKTYPE155.65 Sq.mts. ( 599 Sq.ft. )7
7 Booked100% Booked
100% Booked
28 total apartments / 22 apartments booked. 78% apartments booked.
Work Description in Building A WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 20248101007
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPE141.71 Sq.mts. ( 449 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHKTYPE245.15 Sq.mts. ( 486 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHKTYPE155.65 Sq.mts. ( 599 Sq.ft. )7
7 Booked100% Booked
100% Booked
21 total apartments / 18 apartments booked. 85% apartments booked.
Work Description in Building B WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 202481010026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPE144.96 Sq.mts. ( 484 Sq.ft. )14
2 BHKTYPE165.22 Sq.mts. ( 702 Sq.ft. )14
28 total apartments / 3 apartments booked. 10% apartments booked.
Work Description in Building C WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 202481010014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKTYPE144.96 Sq.mts. ( 484 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHKTYPE247.57 Sq.mts. ( 512 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHKTYPE163.55 Sq.mts. ( 684 Sq.ft. )7
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Mca Constructions
for Project
Gopeshwar Apartment
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation