Project overview

Gopalkrishna Sankul is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000031410. Gopalkrishna Sankul is located at Palghar. This is a New Project being developed by Maad Construction.

Gopalkrishna Sankul has 1 BHK & 1RK Apartments with carpet areas ranging from 207 to 282 Sq.ft. Carpet. The Project has total 24 of which 24 are currently available for sale.

Gopalkrishna Sankul is being developed on a total land area of 7347 Sq.ft. Gopalkrishna Sankul has 5 Wings / Towers A Wing,B Wing,C Wing,E Wing,F Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Gopalkrishna Sankul
  • Location:
  • Palghar
  • Const. Stage:
    New Project
  • Possession:
    31 Dec 2023
Developer Details

  • Developer:
    Maad Construction
  • Phone:
  • Address:
  • Building No 3, Gopal Krishna Sankul, Yashvant Pride, Kini Complex, Naigaon Road East, 401208
Project RERA Details
MAHA REARA No: P99000031410
Project Type Residential
RERA Project Status New Project
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Oct 2021
Last Retrived 28 Jul 2025
Gopalkrishna Sankul QR Code
Gopalkrishna Sankul
MahaRERA - P99000031410
Apartment Details & Configuration
TypeArea
1 BHK26.16 Sq.mts. ( 282 Sq.ft. )
1 BHK27.22 Sq.mts. ( 293 Sq.ft. )
1RK19.19 Sq.mts. ( 207 Sq.ft. )
1RK20.58 Sq.mts. ( 222 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Gopalkrishna Sankullast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal100% completed
95% Complete
Done
Storm Water Drains100% completed
95% Complete
Done
Street Lighting100% completed
95% Complete
Done
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Done
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply100% completed
95% Complete
Done
Buildings / Wings in Gopalkrishna Sankul
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gopalkrishna Sankul by Maad Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

7347 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
0
Available
24

Saleable Area Statistics (Sq. ft.)

5839 Total
Total
5839
Booked
0
Available
5839
Total 24 apartments in project. 0 apartments booked. 0% apartments booked.
Total 5839 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202321000052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.16 Sq.mts. ( 282 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK27.22 Sq.mts. ( 293 Sq.ft. )1
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202321010052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.16 Sq.mts. ( 282 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK19.19 Sq.mts. ( 207 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK20.58 Sq.mts. ( 222 Sq.ft. )2
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 202321010052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK19.19 Sq.mts. ( 207 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK20.58 Sq.mts. ( 222 Sq.ft. )2
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingDec 202321010052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK19.19 Sq.mts. ( 207 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK20.58 Sq.mts. ( 222 Sq.ft. )2
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingDec 202321010052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.16 Sq.mts. ( 282 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK19.19 Sq.mts. ( 207 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK20.58 Sq.mts. ( 222 Sq.ft. )2
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Maad Construction
for Project
Gopalkrishna Sankul
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation