Project overview
Gopalkrishna Sankul is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000031410. Gopalkrishna Sankul is located at Palghar. This is a New Project being developed by Maad Construction.
Gopalkrishna Sankul has 1 BHK & 1RK Apartments with carpet areas ranging from 207 to 282 Sq.ft. Carpet. The Project has total 24 of which 24 are currently available for sale.
Gopalkrishna Sankul is being developed on a total land area of 7347 Sq.ft. Gopalkrishna Sankul has 5 Wings / Towers A Wing,B Wing,C Wing,E Wing,F Wing
| Project | Developer | Location | Possession |
-
Project:
Gopalkrishna Sankul
-
Location:
-
Palghar
-
Const. Stage:
New Project
-
Possession:
31 Dec 2023
-
Developer:
Maad Construction
-
Phone:
-
Address:
-
Building No 3, Gopal Krishna Sankul, Yashvant Pride, Kini Complex, Naigaon Road East, 401208
| MAHA REARA No: |
P99000031410 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
31 Dec 2023 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
18 Oct 2021 |
| Last Retrived |
28 Jul 2025 |
Gopalkrishna Sankul QR Code
Gopalkrishna Sankul
MahaRERA - P99000031410
| Type | Area |
| 1 BHK | 26.16 Sq.mts. ( 282 Sq.ft. ) |
| 1 BHK | 27.22 Sq.mts. ( 293 Sq.ft. ) |
| 1RK | 19.19 Sq.mts. ( 207 Sq.ft. ) |
| 1RK | 20.58 Sq.mts. ( 222 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Gopalkrishna Sankullast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
Done |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements100% completed
|
|
Done |
Landscaping & Tree Planting100% completed
|
|
Done |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Done |
Solid Waste Management And Disposal100% completed
|
|
Done |
Storm Water Drains100% completed
|
|
Done |
Street Lighting100% completed
|
|
Done |
Treatment And Disposal Of Sewage And Sullage Water100% completed
|
|
Done |
Water Conservation, Rain water Harvesting100% completed
|
|
Done |
Water Supply100% completed
|
|
Done |
Buildings / Wings in Gopalkrishna Sankul
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gopalkrishna Sankul by Maad Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
24
apartments in total
Saleable Area Statistics (Sq. ft.)
5839
Total
Total 24 apartments in project. 0 apartments booked. 0% apartments booked.
Total 5839 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A Wing | Dec 2023 | 2 | 1 | 0 | 0 | 0 | 0 | 52 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 26.16 Sq.mts. ( 282 Sq.ft. ) | 5 | |
| 1 BHK | 27.22 Sq.mts. ( 293 Sq.ft. ) | 1 | |
6 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B Wing | Dec 2023 | 2 | 1 | 0 | 1 | 0 | 0 | 52 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 26.16 Sq.mts. ( 282 Sq.ft. ) | 1 | |
| 1RK | 19.19 Sq.mts. ( 207 Sq.ft. ) | 1 | |
| 1RK | 20.58 Sq.mts. ( 222 Sq.ft. ) | 2 | |
4 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building B Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| C Wing | Dec 2023 | 2 | 1 | 0 | 1 | 0 | 0 | 52 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1RK | 19.19 Sq.mts. ( 207 Sq.ft. ) | 2 | |
| 1RK | 20.58 Sq.mts. ( 222 Sq.ft. ) | 2 | |
4 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building C Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| E Wing | Dec 2023 | 2 | 1 | 0 | 1 | 0 | 0 | 52 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1RK | 19.19 Sq.mts. ( 207 Sq.ft. ) | 2 | |
| 1RK | 20.58 Sq.mts. ( 222 Sq.ft. ) | 2 | |
4 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building E Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| F Wing | Dec 2023 | 2 | 1 | 0 | 1 | 0 | 0 | 52 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 26.16 Sq.mts. ( 282 Sq.ft. ) | 3 | |
| 1RK | 19.19 Sq.mts. ( 207 Sq.ft. ) | 1 | |
| 1RK | 20.58 Sq.mts. ( 222 Sq.ft. ) | 2 | |
6 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building F Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Maad Construction
for Project
Gopalkrishna Sankul
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |