Project overview

Golden Valley is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700002661. Golden Valley is located at S No 22, H No 1/A , And S No 22 H No 3/B. This is a Ongoing being developed by A Plus Realty.

Golden Valley has 1 BHK & 2 BHK Apartments with carpet areas ranging from 267 to 374 Sq.ft. Carpet. The Project has total 426 of which 65 are currently available for sale.

Golden Valley is being developed on a total land area of 110309 Sq.ft. out of which 10228 Sq.ft. i.e 9% is reserved for recreational purposes. Golden Valley has 7 Wings / Towers A Wing,B Wing,C Wing,D Wing,E Wing,F Wing,G Wing

ProjectDeveloperLocationPossession
Atmiya HeightsAkshar GroupGat No 76130-12-2025 00:00:00
Shreeji Nisarg Phase IShreeji DevelopersPlot No 1 Part, Survey No 119/1C, 119/2B30-12-2022 00:00:00
Project Details
  • Project:
    Golden Valley
  • Location:
  • S No 22, H No 1/A , And S No 22 H No 3/B
  • Const. Stage:
    Ongoing
  • Possession:
    03 Feb 2023
Developer Details

  • Developer:
    A Plus Realty
  • Phone:
  • Address:
  • Golden Valley
Project RERA Details
MAHA REARA No: P51700002661
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Destination Architecture Interior Designs
Funding Bank AXIS BANK
Proposed Possession 03 Feb 2023
Revised Possession 03 Feb 2023
Extended Possession
Litigations No Litigations
Last Modified 02 Aug 2017
Last Retrived 26 Jul 2025
Golden Valley QR Code
Golden Valley
MahaRERA - P51700002661
Apartment Details & Configuration
TypeArea
1 BHK23.37 Sq.mts. ( 252 Sq.ft. )
1 BHK24.01 Sq.mts. ( 258 Sq.ft. )
1 BHK25.38 Sq.mts. ( 273 Sq.ft. )
1 BHK27.18 Sq.mts. ( 293 Sq.ft. )
1 BHK28.06 Sq.mts. ( 302 Sq.ft. )
1 BHK28.1 Sq.mts. ( 302 Sq.ft. )
1 BHK29.12 Sq.mts. ( 313 Sq.ft. )
1 BHK33.26 Sq.mts. ( 358 Sq.ft. )
1 BHK34.16 Sq.mts. ( 368 Sq.ft. )
1RK17.18 Sq.mts. ( 185 Sq.ft. )
1RK18.4 Sq.mts. ( 198 Sq.ft. )
1RK18.84 Sq.mts. ( 203 Sq.ft. )
1RK20.62 Sq.mts. ( 222 Sq.ft. )
1RK22.36 Sq.mts. ( 241 Sq.ft. )
SHOP20.76 Sq.mts. ( 223 Sq.ft. )
SHOP11.4 Sq.mts. ( 123 Sq.ft. )
SHOP12.3 Sq.mts. ( 132 Sq.ft. )
SHOP13.99 Sq.mts. ( 151 Sq.ft. )
SHOP14.26 Sq.mts. ( 153 Sq.ft. )
SHOP14.76 Sq.mts. ( 159 Sq.ft. )
1 BHK25.5 Sq.mts. ( 274 Sq.ft. )
1 BHK26.06 Sq.mts. ( 281 Sq.ft. )
1 BHK27 Sq.mts. ( 291 Sq.ft. )
1RK17.5 Sq.mts. ( 188 Sq.ft. )
1RK18.9 Sq.mts. ( 203 Sq.ft. )
1RK19.45 Sq.mts. ( 209 Sq.ft. )
1RK19.52 Sq.mts. ( 210 Sq.ft. )
SHOP18.93 Sq.mts. ( 204 Sq.ft. )
SHOP10.87 Sq.mts. ( 117 Sq.ft. )
1 BHK27.43 Sq.mts. ( 295 Sq.ft. )
1 BHK27.6 Sq.mts. ( 297 Sq.ft. )
1 BHK30.17 Sq.mts. ( 325 Sq.ft. )
1 BHK31.33 Sq.mts. ( 337 Sq.ft. )
1 BHK22.4 Sq.mts. ( 241 Sq.ft. )
1 BHK22.44 Sq.mts. ( 242 Sq.ft. )
1 BHK25.9 Sq.mts. ( 279 Sq.ft. )
1RK26.51 Sq.mts. ( 285 Sq.ft. )
1RK18.18 Sq.mts. ( 196 Sq.ft. )
1RK18.42 Sq.mts. ( 198 Sq.ft. )
1RK18.86 Sq.mts. ( 203 Sq.ft. )
1RK20.78 Sq.mts. ( 224 Sq.ft. )
1 BHK24.93 Sq.mts. ( 268 Sq.ft. )
1 BHK25.04 Sq.mts. ( 270 Sq.ft. )
1 BHK25.26 Sq.mts. ( 272 Sq.ft. )
1 BHK25.58 Sq.mts. ( 275 Sq.ft. )
1 BHK27.37 Sq.mts. ( 295 Sq.ft. )
1 BHK27.83 Sq.mts. ( 300 Sq.ft. )
2 BHK34.7 Sq.mts. ( 374 Sq.ft. )
2 BHK35.01 Sq.mts. ( 377 Sq.ft. )
2 BHK35.1 Sq.mts. ( 378 Sq.ft. )
2 BHK35.73 Sq.mts. ( 385 Sq.ft. )
1 BHK22.83 Sq.mts. ( 246 Sq.ft. )
1 BHK23.58 Sq.mts. ( 254 Sq.ft. )
1 BHK24.03 Sq.mts. ( 259 Sq.ft. )
1 BHK24.82 Sq.mts. ( 267 Sq.ft. )
1 BHK25.24 Sq.mts. ( 272 Sq.ft. )
1 BHK25.97 Sq.mts. ( 280 Sq.ft. )
1 BHK26.82 Sq.mts. ( 289 Sq.ft. )
1 BHK27.21 Sq.mts. ( 293 Sq.ft. )
1RK18.08 Sq.mts. ( 195 Sq.ft. )
1RK18.21 Sq.mts. ( 196 Sq.ft. )
1RK18.36 Sq.mts. ( 198 Sq.ft. )
1RK19.54 Sq.mts. ( 210 Sq.ft. )
1RK19.72 Sq.mts. ( 212 Sq.ft. )
1RK19.89 Sq.mts. ( 214 Sq.ft. )
1RK20.5 Sq.mts. ( 221 Sq.ft. )
1 BHK22.86 Sq.mts. ( 246 Sq.ft. )
1 BHK23.25 Sq.mts. ( 250 Sq.ft. )
1 BHK24.32 Sq.mts. ( 262 Sq.ft. )
1 BHK24.44 Sq.mts. ( 263 Sq.ft. )
1 BHK25.87 Sq.mts. ( 278 Sq.ft. )
1 BHK26.57 Sq.mts. ( 286 Sq.ft. )
1 BHK26.75 Sq.mts. ( 288 Sq.ft. )
1 BHK26.77 Sq.mts. ( 288 Sq.ft. )
1 BHK26.87 Sq.mts. ( 289 Sq.ft. )
1RK17.62 Sq.mts. ( 190 Sq.ft. )
1RK17.84 Sq.mts. ( 192 Sq.ft. )
1RK17.97 Sq.mts. ( 193 Sq.ft. )
1RK18.11 Sq.mts. ( 195 Sq.ft. )
1RK18.13 Sq.mts. ( 195 Sq.ft. )
1RK18.59 Sq.mts. ( 200 Sq.ft. )
1RK18.71 Sq.mts. ( 201 Sq.ft. )
1RK18.78 Sq.mts. ( 202 Sq.ft. )
1RK18.88 Sq.mts. ( 203 Sq.ft. )
1RK19.17 Sq.mts. ( 206 Sq.ft. )
1RK19.42 Sq.mts. ( 209 Sq.ft. )
1RK19.43 Sq.mts. ( 209 Sq.ft. )
1RK19.55 Sq.mts. ( 210 Sq.ft. )
1RK20.26 Sq.mts. ( 218 Sq.ft. )
1 BHK24.81 Sq.mts. ( 267 Sq.ft. )
1 BHK25.23 Sq.mts. ( 272 Sq.ft. )
1 BHK26.89 Sq.mts. ( 289 Sq.ft. )
1 BHK27.36 Sq.mts. ( 295 Sq.ft. )
1 BHK27.53 Sq.mts. ( 296 Sq.ft. )
2 BHK34.77 Sq.mts. ( 374 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Golden Valleylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
In Progress
Electric Meter Room Sub Station Receiving Room10% completed
10% Complete
In Progress
Electrical Meter Room, Sub-Station, Receiving Station
In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Fire Safety Requirements As Per Fire N.O.C.
Landscaping & Tree Planting
Work Not Started Yet
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)10% completed
10% Complete
Septic Tank Work Is In Pregress
Solid Waste Management And Disposal
Na
Storm Water Drains10% completed
10% Complete
Work Not Started Yet
Street Lighting
Not Installed Yet
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Not Started Yet
Water Supply
Work Started
Buildings / Wings in Golden Valley
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Golden Valley by A Plus Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

110309 Sq. ft.

Project Area

10228 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

426 apartments in total
Total
426
Booked
361
Available
65

Saleable Area Statistics (Sq. ft.)

112573 Total
Total
112573
Booked
94827
Available
17746
Total 426 apartments in project. 361 apartments booked. 84% apartments booked.
Total 112573 Sq.ft. saleable area. 94827 saleable area booked.
84% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJan 19005101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.37 Sq.mts. ( 252 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK24.01 Sq.mts. ( 258 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK25.38 Sq.mts. ( 273 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK27.18 Sq.mts. ( 293 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK28.06 Sq.mts. ( 302 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK28.1 Sq.mts. ( 302 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK29.12 Sq.mts. ( 313 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK33.26 Sq.mts. ( 358 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK34.16 Sq.mts. ( 368 Sq.ft. )2
1 Booked50% Booked
50% Booked
1RK17.18 Sq.mts. ( 185 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK18.4 Sq.mts. ( 198 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK18.84 Sq.mts. ( 203 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK20.62 Sq.mts. ( 222 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK22.36 Sq.mts. ( 241 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP20.76 Sq.mts. ( 223 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP11.4 Sq.mts. ( 123 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP12.3 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.99 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.26 Sq.mts. ( 153 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.76 Sq.mts. ( 159 Sq.ft. )2
None Booked0% Booked
0% Booked
36 total apartments / 22 apartments booked. 61% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress56% done
56% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 19005101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.5 Sq.mts. ( 274 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.06 Sq.mts. ( 281 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK27 Sq.mts. ( 291 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK17.5 Sq.mts. ( 188 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK18.9 Sq.mts. ( 203 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.45 Sq.mts. ( 209 Sq.ft. )2
1 Booked50% Booked
50% Booked
1RK19.52 Sq.mts. ( 210 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP18.93 Sq.mts. ( 204 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.87 Sq.mts. ( 117 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP13.99 Sq.mts. ( 151 Sq.ft. )2
2 Booked100% Booked
100% Booked
25 total apartments / 20 apartments booked. 80% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingJan 19005101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.43 Sq.mts. ( 295 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK27.6 Sq.mts. ( 297 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.17 Sq.mts. ( 325 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK31.33 Sq.mts. ( 337 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK22.4 Sq.mts. ( 241 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK22.44 Sq.mts. ( 242 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK25.9 Sq.mts. ( 279 Sq.ft. )2
1 Booked50% Booked
50% Booked
1RK26.51 Sq.mts. ( 285 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK18.18 Sq.mts. ( 196 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK18.42 Sq.mts. ( 198 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK18.86 Sq.mts. ( 203 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK20.78 Sq.mts. ( 224 Sq.ft. )2
2 Booked100% Booked
100% Booked
32 total apartments / 27 apartments booked. 84% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress55% done
55% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingJan 19008101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.93 Sq.mts. ( 268 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK25.04 Sq.mts. ( 270 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK25.26 Sq.mts. ( 272 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK25.38 Sq.mts. ( 273 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.58 Sq.mts. ( 275 Sq.ft. )8
7 Booked87% Booked
87% Booked
1 BHK27.37 Sq.mts. ( 295 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 BHK27.83 Sq.mts. ( 300 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK34.7 Sq.mts. ( 374 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK35.01 Sq.mts. ( 377 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK35.1 Sq.mts. ( 378 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK35.73 Sq.mts. ( 385 Sq.ft. )3
3 Booked100% Booked
100% Booked
56 total apartments / 50 apartments booked. 89% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingJan 19008101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.83 Sq.mts. ( 246 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK23.58 Sq.mts. ( 254 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK24.03 Sq.mts. ( 259 Sq.ft. )12
8 Booked66% Booked
66% Booked
1 BHK24.82 Sq.mts. ( 267 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK25.24 Sq.mts. ( 272 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK25.97 Sq.mts. ( 280 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.82 Sq.mts. ( 289 Sq.ft. )16
14 Booked87% Booked
87% Booked
1 BHK27.21 Sq.mts. ( 293 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK18.08 Sq.mts. ( 195 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK18.21 Sq.mts. ( 196 Sq.ft. )8
8 Booked100% Booked
100% Booked
1RK18.36 Sq.mts. ( 198 Sq.ft. )8
7 Booked87% Booked
87% Booked
1RK19.54 Sq.mts. ( 210 Sq.ft. )3
2 Booked66% Booked
66% Booked
1RK19.72 Sq.mts. ( 212 Sq.ft. )3
2 Booked66% Booked
66% Booked
1RK19.89 Sq.mts. ( 214 Sq.ft. )3
3 Booked100% Booked
100% Booked
1RK20.5 Sq.mts. ( 221 Sq.ft. )6
6 Booked100% Booked
100% Booked
84 total apartments / 73 apartments booked. 86% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingJan 190010101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.86 Sq.mts. ( 246 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK23.25 Sq.mts. ( 250 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK24.32 Sq.mts. ( 262 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK24.44 Sq.mts. ( 263 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK25.87 Sq.mts. ( 278 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK26.57 Sq.mts. ( 286 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK26.75 Sq.mts. ( 288 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 BHK26.77 Sq.mts. ( 288 Sq.ft. )10
9 Booked90% Booked
90% Booked
1 BHK26.87 Sq.mts. ( 289 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK17.62 Sq.mts. ( 190 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK17.84 Sq.mts. ( 192 Sq.ft. )5
4 Booked80% Booked
80% Booked
1RK17.97 Sq.mts. ( 193 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK18.11 Sq.mts. ( 195 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK18.13 Sq.mts. ( 195 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK18.59 Sq.mts. ( 200 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK18.71 Sq.mts. ( 201 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK18.78 Sq.mts. ( 202 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK18.88 Sq.mts. ( 203 Sq.ft. )8
8 Booked100% Booked
100% Booked
1RK19.17 Sq.mts. ( 206 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK19.42 Sq.mts. ( 209 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.43 Sq.mts. ( 209 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.55 Sq.mts. ( 210 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK20.26 Sq.mts. ( 218 Sq.ft. )4
4 Booked100% Booked
100% Booked
121 total apartments / 116 apartments booked. 95% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress57% done
57% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingJan 190010101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.81 Sq.mts. ( 267 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.23 Sq.mts. ( 272 Sq.ft. )8
7 Booked87% Booked
87% Booked
1 BHK26.89 Sq.mts. ( 289 Sq.ft. )10
8 Booked80% Booked
80% Booked
1 BHK27.36 Sq.mts. ( 295 Sq.ft. )10
6 Booked60% Booked
60% Booked
1 BHK27.53 Sq.mts. ( 296 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK34.77 Sq.mts. ( 374 Sq.ft. )36
24 Booked66% Booked
66% Booked
72 total apartments / 53 apartments booked. 73% apartments booked.
Work Description in Building G WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress57% done
57% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
A Plus Realty
for Project
Golden Valley
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation