Project overview

Godrej Rks is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800023915. Godrej Rks is located at Comprised Within Cts No 673, 783 Part, 673/1 To 673/20. This is a New being developed by Godrej Projects Development Limited.

Godrej Rks has 3 BHK, 4 BHK, Pent house & Penthouse Apartments with carpet areas ranging from 1218 to 2717 Sq.ft. Carpet. The Project has total 145 of which 14 are currently available for sale.

Godrej Rks is being developed on a total land area of 83909 Sq.ft. out of which 19083 Sq.ft. i.e 23% is reserved for recreational purposes. Godrej Rks has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Cts Nos.53/Pt And 52/Pt30-05-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.831 -Pt31-12-2019 00:00:00
PanoramaEkta Shubham VentureCts No 1746/2131-12-2019 00:00:00
Pure GoldSudhir Vasu Shetty119 And 119 131-03-2018 00:00:00
EdificeBuildproCts 302 Plot No 3431-12-2017 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.1417, 1417/1 To 631-03-2019 00:00:00
Harvest MoonCalvin PropertiesCts No 1389 Plot No 460 Chembur31-12-2019 00:00:00
Sabari Palm ViewSabari Developers LlpCts No 1746 By 1331-03-2019 00:00:00
Krishvi ResidencyShagun Chembur (Aop)176031-12-2019 00:00:00
Little Malabar HillPardis Construction Llp267/1 And 267/2, Cts No 267 Part30-09-2020 00:00:00
Sabari ShobhaSabari Developers LlpCts 1612, 1612-1 To 4 Chembur Village30-11-2020 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction CompanyCts No 8 A31-12-2018 00:00:00
Amrita PriveSkree Krishna PropertiesCts No. 1450, Plot No 532 Of Ss Ii30-06-2019 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles & Developers Pvt.Ltd.973/1 To 9, Plot No.117, Cts Nos. 97331-12-2019 00:00:00
Project Details
  • Project:
    Godrej Rks
  • Location:
  • Comprised Within Cts No 673, 783 Part, 673/1 To 673/20
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Godrej Projects Development Limited
  • Phone:
  • Address:
  • Godrej One
Project RERA Details
MAHA REARA No: P51800023915
Project Type Others
RERA Project Status New
Funding Bank AXIS BANK
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Nov 2021
Last Retrived 26 Jul 2025
Godrej Rks QR Code
Godrej Rks
MahaRERA - P51800023915
Apartment Details & Configuration
TypeArea
3 BHK113.16 Sq.mts. ( 1218 Sq.ft. )
3 BHK125.45 Sq.mts. ( 1350 Sq.ft. )
4 BHK187.47 Sq.mts. ( 2018 Sq.ft. )
Shop198.47 Sq.mts. ( 2136 Sq.ft. )
Shop259.36 Sq.mts. ( 2792 Sq.ft. )
Shop178.45 Sq.mts. ( 1921 Sq.ft. )
Shop178.92 Sq.mts. ( 1926 Sq.ft. )
Shop182.93 Sq.mts. ( 1969 Sq.ft. )
Shop91.6 Sq.mts. ( 986 Sq.ft. )
2 BHK49.98 Sq.mts. ( 538 Sq.ft. )
2 BHK89.37 Sq.mts. ( 962 Sq.ft. )
3 BHK117.1 Sq.mts. ( 1260 Sq.ft. )
Pent house252.43 Sq.mts. ( 2717 Sq.ft. )
Penthouse247.39 Sq.mts. ( 2663 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Godrej Rkslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Approved Plan
Energy management100% completed
95% Complete
As Per Approved Plan &Amp; Moef Guidelines
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Guidelines &Amp; Approval
Landscaping & Tree Planting100% completed
95% Complete
As Per Approved Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Design
Solid Waste Management And Disposal100% completed
95% Complete
Provision For Owc
Storm Water Drains100% completed
95% Complete
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Stp Provided
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Approved Plan
Water Supply100% completed
95% Complete
Mcgm - Water Department
Buildings / Wings in Godrej Rks
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Godrej Rks by Godrej Projects Development Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

83909 Sq. ft.

Project Area

19083 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

145 apartments in total
Total
145
Booked
131
Available
14

Saleable Area Statistics (Sq. ft.)

194916 Total
Total
194916
Booked
170381
Available
24535
Total 145 apartments in project. 131 apartments booked. 90% apartments booked.
Total 194916 Sq.ft. saleable area. 170381 saleable area booked.
87% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 20241513100157
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK113.16 Sq.mts. ( 1218 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK125.45 Sq.mts. ( 1350 Sq.ft. )22
18 Booked81% Booked
81% Booked
4 BHK187.47 Sq.mts. ( 2018 Sq.ft. )13
11 Booked84% Booked
84% Booked
Shop198.47 Sq.mts. ( 2136 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop259.36 Sq.mts. ( 2792 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop178.45 Sq.mts. ( 1921 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop178.92 Sq.mts. ( 1926 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop182.93 Sq.mts. ( 1969 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop91.6 Sq.mts. ( 986 Sq.ft. )1
None Booked0% Booked
0% Booked
54 total apartments / 42 apartments booked. 77% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress96% done
96% Booked
Sanitary Fittings within the flats / premises
work-in-progress96% done
96% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 2024161310055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK49.98 Sq.mts. ( 538 Sq.ft. )25
25 Booked100% Booked
100% Booked
2 BHK89.37 Sq.mts. ( 962 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK117.1 Sq.mts. ( 1260 Sq.ft. )12
12 Booked100% Booked
100% Booked
38 total apartments / 38 apartments booked. 100% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress96% done
96% Booked
Sanitary Fittings within the flats / premises
work-in-progress96% done
96% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 20241513100132
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK113.16 Sq.mts. ( 1218 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK125.45 Sq.mts. ( 1350 Sq.ft. )24
23 Booked95% Booked
95% Booked
4 BHK187.47 Sq.mts. ( 2018 Sq.ft. )14
13 Booked92% Booked
92% Booked
Pent house252.43 Sq.mts. ( 2717 Sq.ft. )1
1 Booked100% Booked
100% Booked
Penthouse247.39 Sq.mts. ( 2663 Sq.ft. )1
1 Booked100% Booked
100% Booked
53 total apartments / 51 apartments booked. 96% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress96% done
96% Booked
Sanitary Fittings within the flats / premises
work-in-progress96% done
96% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Godrej Projects Development Limited
for Project
Godrej Rks
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation