Project overview

Godrej Exquisite is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700024496. Godrej Exquisite is located at 141/5, 206/2. This is a New being developed by Godrej Macbricks Private Limited.

Godrej Exquisite has 1 Bed Luxe, 2 Bed Luxe, 2 Bed Premium, 2 Premium, 3 Bed Luxe & 3 Premium Apartments with carpet areas ranging from 463 to 849 Sq.ft. Carpet. The Project has total 678 of which 164 are currently available for sale.

Godrej Exquisite is being developed on a total land area of 157434 Sq.ft. out of which 70300 Sq.ft. i.e 45% is reserved for recreational purposes. Godrej Exquisite has 3 Wings / Towers Tower 1,Tower 2,Tower 3 - Evoke

ProjectDeveloperLocationPossession
EagletonRoma Builders Private Limited99/230-12-2022 00:00:00
HamptonRoma Builders Private Limited99/230-12-2022 00:00:00
CliftonRoma Builders Private Limited99/2 Pt30-12-2022 00:00:00
PrestonRoma Builders Private Limited99/2 Pt30-12-2022 00:00:00
WillowcrestRoma Builders Private Limited99/2 Pt30-12-2022 00:00:00
FairwayRoma Builders Private Limited99/2 Pt30-12-2022 00:00:00
One Park Avenue - Avenue 1Purva Oak Private LimitedS No 114/4 115/230-12-2023 00:00:00
One Park Avenue - Avenue 6Purva Oak Private LimitedS No 115/230-12-2023 00:00:00
Manhattan Phase 2Sai Uma Construction Private Limited128/1,128/2,128/3,129/1A,129/1B,129/2/1,129/2/2,129/2/3,129/2/4,129/2/5,129/2/6,129/2/7,129/2/8,129/2/9,129/3,129/4A,130/1,130/230-12-2023 00:00:00
Jangid Galaxy Tower 7Jangid Contructions400607, Thane30-12-2022 00:00:00
Hill Spring Phase 1Velocity185/2, 185/330-06-2018 00:00:00
Unique GreenMadhu Harshad DoshiOld S No 166 H No 15Pt 16Pt 23Pt 25Pt 26Pt 27Pt 28Pt 32Pt 33Pt30-06-2018 00:00:00
Project Details
  • Project:
    Godrej Exquisite
  • Location:
  • 141/5, 206/2
  • Const. Stage:
    New
  • Possession:
    30 Mar 2025
Developer Details

  • Developer:
    Godrej Macbricks Private Limited
  • Phone:
  • Address:
  • Godrej One
Project RERA Details
MAHA REARA No: P51700024496
Project Type Others
RERA Project Status New
Funding Bank AXIS BANK
Proposed Possession 30 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Jul 2023
Last Retrived 26 Jul 2025
Godrej Exquisite QR Code
Godrej Exquisite
MahaRERA - P51700024496
Apartment Details & Configuration
TypeArea
2 Bed Luxe58.97 Sq.mts. ( 635 Sq.ft. )
2 Bed Premium57.85 Sq.mts. ( 623 Sq.ft. )
3 Bed Luxe60.61 Sq.mts. ( 652 Sq.ft. )
3 Bed Luxe78.92 Sq.mts. ( 849 Sq.ft. )
3 Premium65.38 Sq.mts. ( 704 Sq.ft. )
3 Premium60.4 Sq.mts. ( 650 Sq.ft. )
Office space27.5 Sq.mts. ( 296 Sq.ft. )
Office space27.62 Sq.mts. ( 297 Sq.ft. )
Office space43.79 Sq.mts. ( 471 Sq.ft. )
Office space45.15 Sq.mts. ( 486 Sq.ft. )
Office space47.8 Sq.mts. ( 515 Sq.ft. )
Office space153.82 Sq.mts. ( 1656 Sq.ft. )
Office space175.64 Sq.mts. ( 1891 Sq.ft. )
Office space214.6 Sq.mts. ( 2310 Sq.ft. )
Shop169.34 Sq.mts. ( 1823 Sq.ft. )
Shop57.87 Sq.mts. ( 623 Sq.ft. )
Shop73.23 Sq.mts. ( 788 Sq.ft. )
Shop75.31 Sq.mts. ( 811 Sq.ft. )
Shop61.9 Sq.mts. ( 666 Sq.ft. )
Shop90.17 Sq.mts. ( 971 Sq.ft. )
Shop94.51 Sq.mts. ( 1017 Sq.ft. )
Shop98.39 Sq.mts. ( 1059 Sq.ft. )
Shop114.83 Sq.mts. ( 1236 Sq.ft. )
Shop137.19 Sq.mts. ( 1477 Sq.ft. )
3 Premium61.32 Sq.mts. ( 660 Sq.ft. )
1 Bed Luxe44.16 Sq.mts. ( 475 Sq.ft. )
1 Bed Luxe44.33 Sq.mts. ( 477 Sq.ft. )
1 Bed Luxe44.76 Sq.mts. ( 482 Sq.ft. )
1 Bed Luxe43.02 Sq.mts. ( 463 Sq.ft. )
2 Premium44.09 Sq.mts. ( 475 Sq.ft. )
2 Premium45.49 Sq.mts. ( 490 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Godrej Exquisitelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved Plan
Community Buildings
Clubhouse Provided
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
As Per Approved Plan
Fire Protection And Fire Safety Requirements
As Per Approved Plan
Landscaping & Tree Planting
As Per Approved Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
As Per Approved Plan
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Approved Plan
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
As Per Approved Plan
Buildings / Wings in Godrej Exquisite
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Godrej Exquisite by Godrej Macbricks Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

157434 Sq. ft.

Project Area

70300 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

678 apartments in total
Total
678
Booked
514
Available
164

Saleable Area Statistics (Sq. ft.)

437896 Total
Total
437896
Booked
324309
Available
113587
Total 678 apartments in project. 514 apartments booked. 75% apartments booked.
Total 437896 Sq.ft. saleable area. 324309 saleable area booked.
74% area booked.

Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1Sep 20243910140248
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 Bed Luxe58.97 Sq.mts. ( 635 Sq.ft. )39
30 Booked76% Booked
76% Booked
2 Bed Premium57.85 Sq.mts. ( 623 Sq.ft. )74
62 Booked83% Booked
83% Booked
3 Bed Luxe60.61 Sq.mts. ( 652 Sq.ft. )66
40 Booked60% Booked
60% Booked
3 Bed Luxe78.92 Sq.mts. ( 849 Sq.ft. )12
None Booked0% Booked
0% Booked
3 Premium65.38 Sq.mts. ( 704 Sq.ft. )5
None Booked0% Booked
0% Booked
3 Premium60.4 Sq.mts. ( 650 Sq.ft. )24
19 Booked79% Booked
79% Booked
Office space27.5 Sq.mts. ( 296 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space27.62 Sq.mts. ( 297 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space43.79 Sq.mts. ( 471 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space45.15 Sq.mts. ( 486 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space47.8 Sq.mts. ( 515 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space153.82 Sq.mts. ( 1656 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space175.64 Sq.mts. ( 1891 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space214.6 Sq.mts. ( 2310 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop169.34 Sq.mts. ( 1823 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop57.87 Sq.mts. ( 623 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop73.23 Sq.mts. ( 788 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop75.31 Sq.mts. ( 811 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop61.9 Sq.mts. ( 666 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop90.17 Sq.mts. ( 971 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop94.51 Sq.mts. ( 1017 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop98.39 Sq.mts. ( 1059 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop114.83 Sq.mts. ( 1236 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop137.19 Sq.mts. ( 1477 Sq.ft. )1
1 Booked100% Booked
100% Booked
238 total apartments / 165 apartments booked. 69% apartments booked.
Work Description in Building Tower 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress28% done
28% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress92% done
92% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress55% done
55% Booked

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Sep 20243910140239
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 Bed Luxe58.97 Sq.mts. ( 635 Sq.ft. )39
34 Booked87% Booked
87% Booked
2 Bed Premium57.85 Sq.mts. ( 623 Sq.ft. )74
64 Booked86% Booked
86% Booked
3 Bed Luxe60.61 Sq.mts. ( 652 Sq.ft. )66
40 Booked60% Booked
60% Booked
3 Bed Luxe78.92 Sq.mts. ( 849 Sq.ft. )12
3 Premium61.32 Sq.mts. ( 660 Sq.ft. )24
23 Booked95% Booked
95% Booked
3 Premium65.38 Sq.mts. ( 704 Sq.ft. )5
3 Booked60% Booked
60% Booked
220 total apartments / 166 apartments booked. 75% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress63% done
63% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress87% done
87% Booked

Tower 3 - Evoke

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3 - EvokeSep 20243910140218
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 Bed Luxe44.16 Sq.mts. ( 475 Sq.ft. )13
12 Booked92% Booked
92% Booked
1 Bed Luxe44.33 Sq.mts. ( 477 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 Bed Luxe44.76 Sq.mts. ( 482 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 Bed Luxe43.02 Sq.mts. ( 463 Sq.ft. )31
25 Booked80% Booked
80% Booked
2 Bed Luxe58.97 Sq.mts. ( 635 Sq.ft. )39
37 Booked94% Booked
94% Booked
2 Bed Premium57.85 Sq.mts. ( 623 Sq.ft. )28
22 Booked78% Booked
78% Booked
2 Premium44.09 Sq.mts. ( 475 Sq.ft. )13
11 Booked84% Booked
84% Booked
2 Premium45.49 Sq.mts. ( 490 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 Bed Luxe60.61 Sq.mts. ( 652 Sq.ft. )66
51 Booked77% Booked
77% Booked
3 Bed Luxe78.92 Sq.mts. ( 849 Sq.ft. )12
8 Booked66% Booked
66% Booked
3 Premium61.32 Sq.mts. ( 660 Sq.ft. )10
10 Booked100% Booked
100% Booked
3 Premium65.38 Sq.mts. ( 704 Sq.ft. )1
None Booked0% Booked
0% Booked
220 total apartments / 183 apartments booked. 83% apartments booked.
Work Description in Building Tower 3 - EvokeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress22% done
22% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress61% done
61% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress34% done
34% Booked
Channel Partners
Channel Partners Registered by Developer
Godrej Macbricks Private Limited
for Project
Godrej Exquisite
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation