Project overview

Gn Firdows is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700022771. Gn Firdows is located at 18-1P, 2, 19-3. This is a New being developed by Gnr Developers.

Gn Firdows has Bungalow Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 127 of which 17 are currently available for sale.

Gn Firdows is being developed on a total land area of 59715 Sq.ft. out of which 8513 Sq.ft. i.e 14% is reserved for recreational purposes. Gn Firdows has 3 Wings / Towers Building No 1,Building No 2,Bungalow

ProjectDeveloperLocationPossession
Ana Avant Garde Phase 1Steelfab Engineering Corporation1335Pt, 1424Pt31-12-2018 00:00:00
Raj EstateD.V.Builders & Developers Pvt. Ltd.11/2/1A,11/2/1B,11/3,4,530-06-2018 00:00:00
Kasturi BlossomSiddhivinayak EnterpriseOld Survey No. 2131-12-2027 00:00:00
Codename StarlifeJp Infra Realty Private Limited111 -1-2 111-2 111-5 111-8-3 111-8-4 119-1 119-2 119-3 119-4 124-1 124-2 124-3 118-4-1 118-5 118-7 125-1 125-231-12-2031 00:00:00
Jp North Imperia - Tower 1Jp Infra Realty Private LimitedSurvey Hissa No 109-9 At Village Ghodbunder Dist And Taluka Thane - 40110730-12-2025 00:00:00
IndradhanushSonam Homes Private Limited20/230-10-2024 00:00:00
Raj AkshayRaj AkshaySurvey No 127 Hissa No 130-12-2025 00:00:00
Tiara Hills Phase I Bldg No 3, 5 And 2Pnk Space Development Pvt Ltd1351,2 1366 1471,2,3 1483,4,7 1491,330-12-2025 00:00:00
Hiral Shree SamarthHiral Homes401107, Thane30-06-2018 00:00:00
Harsh Residency And The Corporate LoungeHarsh Real Estate Private LimitedCts No 5,18 And 3230-12-2021 00:00:00
Man OpusMan Global Ltd.S. No. 53/1 Pt,Cts No. 1475,1556-1561,1565-1567,1625,1643,1644,1711-1713,171631-12-2018 00:00:00
ForestaTejas Vyas40110731-12-2021 00:00:00
Prithvi Pride Phase-IPrithvi Land DevelopersS N 220 H N 1,2,3,430-09-2021 00:00:00
Project Details
  • Project:
    Gn Firdows
  • Location:
  • 18-1P, 2, 19-3
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Gnr Developers
  • Phone:
  • Address:
  • Nirmalnagar Chsl
Project RERA Details
MAHA REARA No: P51700022771
Project Type Residential / Group Housing
RERA Project Status New
Architect Anish & Assoc
Funding Bank BANK OF INDIA
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Oct 2019
Last Retrived 26 Jul 2025
Gn Firdows QR Code
Gn Firdows
MahaRERA - P51700022771
Apartment Details & Configuration
TypeArea
1 BHK32.12 Sq.mts. ( 346 Sq.ft. )
1 BHK32.18 Sq.mts. ( 346 Sq.ft. )
1 BHK33.89 Sq.mts. ( 365 Sq.ft. )
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )
2 BHK40.04 Sq.mts. ( 431 Sq.ft. )
Shop13.09 Sq.mts. ( 141 Sq.ft. )
Shop13.81 Sq.mts. ( 149 Sq.ft. )
Shop13.86 Sq.mts. ( 149 Sq.ft. )
Shop14.87 Sq.mts. ( 160 Sq.ft. )
Shop16.26 Sq.mts. ( 175 Sq.ft. )
Shop16.66 Sq.mts. ( 179 Sq.ft. )
Shop19.02 Sq.mts. ( 205 Sq.ft. )
Shop19.31 Sq.mts. ( 208 Sq.ft. )
Shop19.41 Sq.mts. ( 209 Sq.ft. )
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )
1 BHK33.05 Sq.mts. ( 356 Sq.ft. )
2 BHK40.82 Sq.mts. ( 439 Sq.ft. )
2 BHK40.91 Sq.mts. ( 440 Sq.ft. )
Bungalow0 Sq.mts. ( 0 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Gn Firdowslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
Na
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Gn Firdows
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gn Firdows by Gnr Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

59715 Sq. ft.

Project Area

8513 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

127 apartments in total
Total
127
Booked
110
Available
17

Saleable Area Statistics (Sq. ft.)

43233 Total
Total
43233
Booked
36928
Available
6305
Total 127 apartments in project. 110 apartments booked. 86% apartments booked.
Total 43233 Sq.ft. saleable area. 36928 saleable area booked.
85% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Dec 2023111010013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.12 Sq.mts. ( 346 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK32.18 Sq.mts. ( 346 Sq.ft. )55
48 Booked87% Booked
87% Booked
1 BHK33.89 Sq.mts. ( 365 Sq.ft. )13
13 Booked100% Booked
100% Booked
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )12
10 Booked83% Booked
83% Booked
2 BHK40.04 Sq.mts. ( 431 Sq.ft. )12
12 Booked100% Booked
100% Booked
Shop13.09 Sq.mts. ( 141 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop13.81 Sq.mts. ( 149 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.86 Sq.mts. ( 149 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.87 Sq.mts. ( 160 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop16.26 Sq.mts. ( 175 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.66 Sq.mts. ( 179 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop19.02 Sq.mts. ( 205 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.31 Sq.mts. ( 208 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.41 Sq.mts. ( 209 Sq.ft. )2
2 Booked100% Booked
100% Booked
119 total apartments / 110 apartments booked. 92% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress43% done
43% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Dec 2023210320032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK33.05 Sq.mts. ( 356 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK40.82 Sq.mts. ( 439 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK40.91 Sq.mts. ( 440 Sq.ft. )2
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bungalow

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BungalowDec 20234101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building BungalowCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Gnr Developers
for Project
Gn Firdows
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation