Project overview

Gaurav Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700007276. Gaurav Enclave is located at 401107, Thane. This is a On-Going Project being developed by Ravi Developments.

Gaurav Enclave has 2 BHK, 3 BHK & Shop Apartments with carpet areas ranging from 166 to 782 Sq.ft. Carpet. The Project has total 108 of which 65 are currently available for sale.

Gaurav Enclave is being developed on a total land area of 21610 Sq.ft. Gaurav Enclave has 2 Wings / Towers Gaurav Enclave Building 1,Gaurav Enclave Building 2

ProjectDeveloperLocationPossession
ArcadiaJangid PropertiesNew Survey Number 60/230-04-2018 00:00:00
12Th AvenueSadguru Baba Developers LlpMira Road31-12-2021 00:00:00
Shubham GardenShubham Drashti EnterprisesNew 1712 30-04-2022 00:00:00
Raj EnclaveRatna Priya BuildersOld Sno 331 New Sno 27 Hno 5 Of Village Goddev30-12-2022 00:00:00
Keystone ClassicKeystone Classic401107, Thane30-04-2020 00:00:00
BhargavR N EnterprisesS.N 191 H.N.2B31-12-2019 00:00:00
Mangal Pushp HeightsSunil Mangilal JainOld Sno 668 New Sno 257 Hno 1 /7 Village Bhayander Dist Thane30-12-2023 00:00:00
Ideal ParkIdeal Builder & Developers84 Hissa No 115-08-2019 00:00:00
Shalom JoveCottadiyil EnterprisesOld Sno 563, 566 New Sno 205,219 Hno 1 And 5 Village Bhayander Dist Thane31-12-2018 00:00:00
Sheetal Complex Wing D EAbhay Builders401107, Thane05-08-2018 00:00:00
Lodha Mira Road Project 1Macrotech Developers Limited90/3, 91/2, 98/228-11-2022 00:00:00
Balaji HeightsShree Balaji RealityOld Sno 2217 New Sno 195730-04-2018 00:00:00
Anand Park D WingR K DevelopmentOld S.N.223 N.S.No.191 H.No.178631-07-2018 00:00:00
Skyline-Ii-MhadaUnique Shanti Neminath Developers LlpS No 216P, 221P31-03-2018 00:00:00
MahadevshreeM.M.Construction3308,9, 3311A31-01-2021 00:00:00
Sai PlazaShree Sai Shakti Developers19 New Hissa No 1 6B And 15 Hissa No 1030-12-2023 00:00:00
Sector Vi/E-6Shantistar Builders736 Bhayander Village30-09-2020 00:00:00
Shree Ambesh Complex And Ambesh BhavanShree Ambesh ConstructionThane, 40110531-07-2020 00:00:00
Unique Orbit-IUnique Shanti RealtorsS No. 401 H No 4B Off Village Ghoddev Mira Road East Thane 30-12-2020 00:00:00
Ruheena AppartmentSairajdevelop401104, Thane31-12-2020 00:00:00
V. M. HeightsSwayam DevelopersThane, 40110731-12-2018 00:00:00
Heeru SadanHemant JainThane, 40110101-09-2018 00:00:00
N G Silver SpringRna Builders (Ng)3102P, 3111115-12-2018 00:00:00
Annapurna JyotiAnnapurna AssociatesSno 227 Hno 130-12-2021 00:00:00
Bhau Padmann ApartmentGujarat Land DevelopersSno 238 New Sno 187 Hsno 3 Navghar Village Mira Bhayandar Municipal Corporation31-12-2019 00:00:00
Mini MarketHemant S JainOld Survey 136/1Pt New Survey 98/1 A And C31-12-2018 00:00:00
Skywards RegencySkywards Vision Developers119 1N 1C 1D Mauje Davle Thane30-06-2020 00:00:00
YashshantiSiddhivinayak DevelopersOld Sno 2102 New 95218-10-2018 00:00:00
Arihant PlazaArihant DevelopersOld Sno 2508 New Sno 46831-12-2019 00:00:00
Imperial Heights Phase I - A And B WingAkshar Shanti Realtors Private Limited12/130-12-2024 00:00:00
Jyoti BreezeVenkatesh Construction79/3,74/2,75/130-12-2023 00:00:00
Raj OaksRaj Corporation476 Part Old , 120 / 2 New31-12-2019 00:00:00
Ostwal Orchid Building No. 9 To 12Asha EnterprisesS No.55/3,5,7 S No.56/2,4,6,7,8,9,10,11,13 S No. 57/1,2,3,5,6,7,9,10,1230-12-2023 00:00:00
Laxmi HeightsLaxmi AssociatesS.No Old 215 , New 198 Hissa No 1, Village Navghar30-12-2023 00:00:00
Mayfair Mira PrideMayfair Maru DevelopersOld Survey No.476 (Pt.) New Survey No.120/3 Of Village Bhayander30-12-2028 00:00:00
Nida Amisha HeightsSai Krupa DevelopersOld Survey No 21 Part And New Survey No 76 Hissa No 401-07-2026 00:00:00
Deepak ApartmentSilver & Rashi ConstructionsNew 54 H No 6 And 725-12-2018 00:00:00
Shreenath AvenueShreenath Enterprises1031-03-2018 00:00:00
Prithvi SnehPrithvi Buildworth Constructions401107, Thane31-12-2025 00:00:00
Kakad Paradise Phase 2Kakad Housing CorporationPart Of 48/4 48/5 48/10 48/11 48/14 48/22 48/23 48/20 48/15 48/18 48/19 48/21 46/3 46/2 45/130-06-2024 00:00:00
Unique Aurum-IiUnique Shanti Developers Llp459, Hissa No.4-Village Navghar, Dist. Thane30-09-2018 00:00:00
Venkatesh Jyot Bldg No 5Shree Balaji Builders And DevelopersNew 377/1-7 Old 684/1-7 New 212/3Pt-3Pt-2-4-5 Old 553/3 Pt/3Pt 2-4-530-12-2021 00:00:00
Golden City ComplexShree J.P. BuildersOld Sno 464 New Sno 140 Hno 130-12-2021 00:00:00
Sunder Angan Phase IiSunder Angan Developers167/8, 169/730-12-2021 00:00:00
Sadguru Complex Bldg No 9Sadguru BuildersSurvey No 425/7, 425/830-12-2028 00:00:00
Walchand Nagar - 2Prakash Hamirmal JainOld S No 220 New S No 430-04-2018 00:00:00
Poonam SquareRohit Devendra GoyalOld S No 45230-12-2021 00:00:00
The Address Building No.7/8/9Strawberry Constructions Pvt. Ltd.S.No.407/3, 411/3,6,9, 412/1,2,4,6, 413/3P, 4, 5P, 6,7, 414/1,2Pt30-06-2021 00:00:00
Ambrosia And AsterJangid PropertiesNew Survey No 60/230-04-2019 00:00:00
Gaurav EnclaveRavi Developments401107, Thane31-12-2021 00:00:00
Siddhachal ResidencyHitech Developers257/1/131-08-2019 00:00:00
N G Tivoli Phase IRna Builders (Ng)Old Survey No 420 New Survey No 116 H No 430-12-2022 00:00:00
Leela ApartmentShubham Builders And DevelopersOld Sno 312 New Sno 44 Hissa No 1/Pt30-12-2022 00:00:00
Ritu RayyanRitu Infrastructure Pvt LtdNew Sno 151 Pardi No 2130-12-2021 00:00:00
Shanti OneShantistar Builders40110731-12-2019 00:00:00
Skyline-IiUnique Shanti Neminath Developers LlpOld S No. Bearing 216P, 221P222p Off Village Penkar Pada Dist Thane30-06-2018 00:00:00
DeveshOm Construction CoOld Sno 295 New Sno 178 Hno 13,1528-08-2023 00:00:00
Dev RatnaSdc Developers Private Limited185631-12-2019 00:00:00
New Prakash Apartment ChsJasmine RealtySurvey No 142 And 143 Old Survey No 51 And 46 New Hissa No 7A And 131-12-2019 00:00:00
The Address Building No.5Strawberry Constructions Pvt. Ltd.S.No.407/3, 411/3,6,9, 412/1,2,4,6, 413/3P,6,7, 414/1/,Pt30-12-2022 00:00:00
Raviraj SpringMira Housing Development Corporation15215-12-2018 00:00:00
Jeevan Asha HeightsNirmiti ConstructionsS. No.480O 112N H. No.1,2,730-12-2021 00:00:00
Borivali Yash Prabha Chs LtdUnique Shanti Developers LlpPlot No.719 Tps Iii30-12-2020 00:00:00
Vasudev Sky HighShree Prathamesh DeveloperOld Sno 304 New Sn0 177 Hissa No 230-06-2019 00:00:00
Rashmi SignatureHemendra Bosmiya40110730-12-2017 00:00:00
Shree Shashwat Bldg20Uday Ghanshyam Naik181 7A 7B 9 10 182 3 4 5 6 830-06-2021 00:00:00
Shraddha HeightsShraddha ConstructionsPlot No 16 Gut No 216 Old Survey Number 53/130-04-2018 00:00:00
N G Diamond Hill A Phase IiiRna Builders (Ng)4426A, 4432B31-12-2024 00:00:00
N G Diamond Hill C Phase IvRna Builders (Ng)Navghar31-12-2024 00:00:00
Raj Heritage 2Raj Realty Builders & Developers Private LimitedSn No 383 Old 61 New H No 1A S No 380 Old 67 New H No 6,10 S No 381 Old 66 New H No 3,5,6,831-03-2026 00:00:00
Imperial HeightsSkheights Pvt LtdCts4278 To 4285,4287,4302To4305,4307To4313,4303To4350,4382,438330-09-2020 00:00:00
PinnacoloSkd Realty LlpOld Survey No 445, New Survey No 12930-06-2018 00:00:00
Tower A To D On Cts No 104Pt, 106Pt, 224/1A, 224/1B In Village Ghodbunder, Mira Road Rna Corp Pvt. LtdS. No. 106 Pt,224/1A Pt31-07-2018 00:00:00
Ostwal PointShree Ostwal Builders LtdSurvey No.290 Hissa No.5A, 9, 11 And 1231-12-2018 00:00:00
Venkatesh Kumkum Bldg No 10Shree Balaji Builders And DevelopersNew 377/1-7 Old 684/1-7 New 212/3Pt-3Pt-2-4-5 Old 553/3 Pt/3Pt 2-4-5 30-12-2023 00:00:00
Gaurav CrestRavi Developments871A,87 1 Pt30-12-2023 00:00:00
Tower E To I On Cts No 104Pt, 106Pt, 224/1A, 224/1B In Village Ghodbunder, Mira RoadRna Corp Pvt. LtdS. No. 106 Pt, 224/1A Pt,224/1B Pt31-07-2019 00:00:00
Pratham HeightsPratham Infrastructure69/931-12-2017 00:00:00
Rassaz GreensRais Ahmad377/New 75/H No 4 And 931-12-2019 00:00:00
Tirupati HeightsM/S Shri Tirupati RealtySurvey No 559, New Survey No 207, Hissa No.130-12-2022 00:00:00
Urban Grandeur Bldg-2Cllaro Enterprises Llp127-1A30-06-2027 00:00:00
Ostwal Paradise Building No.9 Wing A - B - CShree Ostwal Builders LtdOld S No 364 New S No 67 H No 4B Old S No 365 New S No 71 Hissa No 1731-12-2028 00:00:00
Mahadev TowerNandkumar Mahadev Patil249/2, 250/3 252/10 Part31-07-2022 00:00:00
Natwar House Co-Op Hsg Soc LtdPadamavati Builders And Infrastructures401105, Thane31-12-2019 00:00:00
Jay Vanadana Chs LtdDayanand Sanjeev Shetty143/9 Part30-09-2020 00:00:00
Benevolent Mb HeightsBenevolent M.B Constructions Pvt LtdOld Survey.No- 508, New Survey No - 101/8 & 931-12-2027 00:00:00
Oak Leaf TowersAxis Housing Private LimitedS.No. 472/5 Mouje Navghar Dist Thane31-12-2030 00:00:00
FlorentiaSiddhivinayak Homes Pvt. Ltd.Survey No 27/7, 3A, 3B, Survey No 41/530-12-2022 00:00:00
Shree PanchamShree Pancham Associates442 Old 115 New To North 441 Old 114 New To South 442 Old 115 New To West Taluka Thane30-06-2018 00:00:00
Raviraj SpringM/S Raviraj Housing (Prince City)15215-12-2018 00:00:00
Poonam Estate Mhada Bldg No 8 And 9Ravi DevelopmentsOld S No 150Pt 151Pt Village Mira Old S No 226 227 228 229 230 Village Penkarpada31-12-2017 00:00:00
Sea Green Apartment Aakash Builders & DevelopersSurvey No 53/6 Vill Navghar31-12-2019 00:00:00
Shree Kamakhya ChambersShriprakash Vijaynath RaiOld Sno 56/9 And 10 New 13/9/1030-03-2022 00:00:00
Shreedham ExcellencyShreedham Construction Private LimitedOld Survey No. 338,Survey No. 24,Hissa No. 830-12-2022 00:00:00
IndrayaniJangid Developers42/3C,3D30-06-2019 00:00:00
Sagar AccordM/ S. S A RealtyThane30-12-2021 00:00:00
Usha Kiran HeightsSai Sparsh DevelopersNear Vinayak Temple30-12-2022 00:00:00
Project Details
  • Project:
    Gaurav Enclave
  • Location:
  • 401107, Thane
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2021
Developer Details

  • Developer:
    Ravi Developments
  • Phone:
  • Address:
  • 76, Laxmi Palace, Mathuradas Road, Near Kapol Bank, Kandivali West, 400067
Project RERA Details
MAHA REARA No: P51700007276
Project Type Residential
RERA Project Status On-Going Project
Architect Design And Concepts
Funding Bank YES BANK
Proposed Possession 31 Dec 2021
Revised Possession 30 Dec 2022
Extended Possession 31 Dec 2025
Litigations No Litigations
Last Modified 26 Feb 2024
Last Retrived 28 Jul 2025
Gaurav Enclave QR Code
Gaurav Enclave
MahaRERA - P51700007276
Apartment Details & Configuration
TypeArea
1 Bhk35.72 Sq.mts. ( 384 Sq.ft. )
2 Bhk45.44 Sq.mts. ( 489 Sq.ft. )
2 BHK47.34 Sq.mts. ( 510 Sq.ft. )
Shop18.14 Sq.mts. ( 195 Sq.ft. )
Shop19.31 Sq.mts. ( 208 Sq.ft. )
Shop20.84 Sq.mts. ( 224 Sq.ft. )
Shop22.2 Sq.mts. ( 239 Sq.ft. )
Shop25.39 Sq.mts. ( 273 Sq.ft. )
Shop27.12 Sq.mts. ( 292 Sq.ft. )
Shop31.33 Sq.mts. ( 337 Sq.ft. )
2 BHK46.84 Sq.mts. ( 504 Sq.ft. )
2 BHK50.84 Sq.mts. ( 547 Sq.ft. )
3 BHK72.62 Sq.mts. ( 782 Sq.ft. )
Shop15.4 Sq.mts. ( 166 Sq.ft. )
Shop16.2 Sq.mts. ( 174 Sq.ft. )
Shop16.93 Sq.mts. ( 182 Sq.ft. )
Shop17.34 Sq.mts. ( 187 Sq.ft. )
Shop17.42 Sq.mts. ( 188 Sq.ft. )
Shop18.08 Sq.mts. ( 195 Sq.ft. )
Shop19.87 Sq.mts. ( 214 Sq.ft. )
Shop20.12 Sq.mts. ( 217 Sq.ft. )
Shop21.51 Sq.mts. ( 232 Sq.ft. )
Shop22.29 Sq.mts. ( 240 Sq.ft. )
Shop23.3 Sq.mts. ( 251 Sq.ft. )
Shop25.67 Sq.mts. ( 276 Sq.ft. )
Shop25.95 Sq.mts. ( 279 Sq.ft. )
Shop26.09 Sq.mts. ( 281 Sq.ft. )
Shop29.96 Sq.mts. ( 322 Sq.ft. )
Shop41.6 Sq.mts. ( 448 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Gaurav Enclavelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
Na
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
Na
Buildings / Wings in Gaurav Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gaurav Enclave by Ravi Developmentslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

21610 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

108 apartments in total
Total
108
Booked
43
Available
65

Saleable Area Statistics (Sq. ft.)

48731 Total
Total
48731
Booked
15503
Available
33228
Total 108 apartments in project. 43 apartments booked. 39% apartments booked.
Total 48731 Sq.ft. saleable area. 15503 saleable area booked.
32% area booked.

Gaurav Enclave Building 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gaurav Enclave Building 1Dec 202222101201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 Bhk35.72 Sq.mts. ( 384 Sq.ft. )28
2 Bhk45.44 Sq.mts. ( 489 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK47.34 Sq.mts. ( 510 Sq.ft. )7
2 Booked28% Booked
28% Booked
Shop18.14 Sq.mts. ( 195 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.31 Sq.mts. ( 208 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop20.84 Sq.mts. ( 224 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop22.2 Sq.mts. ( 239 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.39 Sq.mts. ( 273 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop27.12 Sq.mts. ( 292 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.33 Sq.mts. ( 337 Sq.ft. )1
1 Booked100% Booked
100% Booked
50 total apartments / 13 apartments booked. 26% apartments booked.
Work Description in Building Gaurav Enclave Building 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress29% done
29% Booked

Gaurav Enclave Building 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gaurav Enclave Building 2Dec 202222101201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.84 Sq.mts. ( 504 Sq.ft. )13
4 Booked30% Booked
30% Booked
2 BHK50.84 Sq.mts. ( 547 Sq.ft. )14
7 Booked50% Booked
50% Booked
3 BHK72.62 Sq.mts. ( 782 Sq.ft. )14
Shop15.4 Sq.mts. ( 166 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.2 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.93 Sq.mts. ( 182 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.34 Sq.mts. ( 187 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.42 Sq.mts. ( 188 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop18.08 Sq.mts. ( 195 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.87 Sq.mts. ( 214 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop20.12 Sq.mts. ( 217 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop21.51 Sq.mts. ( 232 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop22.29 Sq.mts. ( 240 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.3 Sq.mts. ( 251 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.67 Sq.mts. ( 276 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.95 Sq.mts. ( 279 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.09 Sq.mts. ( 281 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop29.96 Sq.mts. ( 322 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop41.6 Sq.mts. ( 448 Sq.ft. )1
1 Booked100% Booked
100% Booked
58 total apartments / 30 apartments booked. 51% apartments booked.
Work Description in Building Gaurav Enclave Building 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress42% done
42% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress63% done
63% Booked
Channel Partners
Channel Partners Registered by Developer
Ravi Developments
for Project
Gaurav Enclave
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation