Project overview

GAURAV ASTER is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700011796. GAURAV ASTER is located at 27/8, 27/9. This is a Ongoing being developed by Ravi Developments.

GAURAV ASTER has 2 BHK Apartments with carpet areas ranging from 421 to 443 Sq.ft. Carpet. The Project has total 73 of which 0 are currently available for sale.

GAURAV ASTER is being developed on a total land area of 6264 Sq.ft. GAURAV ASTER has 3 Wings / Towers A Wing,B Wing,C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    GAURAV ASTER
  • Location:
  • 27/8, 27/9
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Ravi Developments
  • Phone:
  • Address:
  • Laxmi Palace
Project RERA Details
MAHA REARA No: P51700011796
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Anish & Associates
Funding Bank
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2025
Litigations No Litigations
Last Modified 21 Nov 2023
Last Retrived 13 Feb 2026
GAURAV ASTER QR Code
GAURAV ASTER
MahaRERA - P51700011796
Apartment Details & Configuration
TypeArea
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )
2 BHK41.14 Sq.mts. ( 443 Sq.ft. )
2 BHK41.2 Sq.mts. ( 443 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of GAURAV ASTERlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
0
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply90% completed
90% Complete
Municipal Water Taker &Amp; Municipal Water
Buildings / Wings in GAURAV ASTER
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of GAURAV ASTER by Ravi Developmentslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

6264 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

73 apartments in total
Total
73
Booked
73
Available
0

Saleable Area Statistics (Sq. ft.)

31242 Total
Total
31242
Booked
31242
Available
0
Total 73 apartments in project. 73 apartments booked. 100% apartments booked.
Total 31242 Sq.ft. saleable area. 31242 saleable area booked.
100% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingOct 202017101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )23
23 Booked100% Booked
100% Booked
23 total apartments / 23 apartments booked. 100% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress26% done
26% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress26% done
26% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress83% done
83% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingOct 202018101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK41.14 Sq.mts. ( 443 Sq.ft. )13
13 Booked100% Booked
100% Booked
27 total apartments / 27 apartments booked. 100% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress67% done
67% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress83% done
83% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress67% done
67% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingOct 202017101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.07 Sq.mts. ( 421 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK41.2 Sq.mts. ( 443 Sq.ft. )11
11 Booked100% Booked
100% Booked
23 total apartments / 23 apartments booked. 100% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress26% done
26% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress26% done
26% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress83% done
83% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ravi Developments
for Project
GAURAV ASTER
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation