Project overview

Garden Avenue - K K3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000007110. Garden Avenue - K K3 is located at 5,5B. This is a Ongoing being developed by Sridutt Constructions.

Garden Avenue - K K3 has 2 BHK & Shop Apartments with carpet areas ranging from 110 to 565 Sq.ft. Carpet. The Project has total 427 of which 156 are currently available for sale.

Garden Avenue - K K3 is being developed on a total land area of 79008 Sq.ft. Garden Avenue - K K3 has 5 Wings / Towers K10,K7,K7a,K8,K9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Garden Avenue - K K3
  • Location:
  • 5,5B
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Sridutt Constructions
  • Phone:
  • Address:
  • Pancharatna Building
Project RERA Details
MAHA REARA No: P99000007110
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Divyesh Shah
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession 29 Dec 2024
Litigations No Litigations
Last Modified 05 Apr 2024
Last Retrived 28 Jul 2025
Garden Avenue - K K3 QR Code
Garden Avenue - K K3
MahaRERA - P99000007110
Apartment Details & Configuration
TypeArea
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )
1 BHK35 Sq.mts. ( 377 Sq.ft. )
2 BHK43.68 Sq.mts. ( 470 Sq.ft. )
2 BHK45.14 Sq.mts. ( 486 Sq.ft. )
2 BHK45.34 Sq.mts. ( 488 Sq.ft. )
2 BHK45.98 Sq.mts. ( 495 Sq.ft. )
2 BHK52.14 Sq.mts. ( 561 Sq.ft. )
2 BHK52.53 Sq.mts. ( 565 Sq.ft. )
Shop11.31 Sq.mts. ( 122 Sq.ft. )
Shop13.35 Sq.mts. ( 144 Sq.ft. )
Shop13.75 Sq.mts. ( 148 Sq.ft. )
Shop16.17 Sq.mts. ( 174 Sq.ft. )
Shop18.24 Sq.mts. ( 196 Sq.ft. )
Shop18.68 Sq.mts. ( 201 Sq.ft. )
Shop18.86 Sq.mts. ( 203 Sq.ft. )
Shop21.12 Sq.mts. ( 227 Sq.ft. )
Shop21.72 Sq.mts. ( 234 Sq.ft. )
Shop24.35 Sq.mts. ( 262 Sq.ft. )
Shop31.71 Sq.mts. ( 341 Sq.ft. )
Shop32.87 Sq.mts. ( 354 Sq.ft. )
1 BHK32.06 Sq.mts. ( 345 Sq.ft. )
1 BHK34.33 Sq.mts. ( 370 Sq.ft. )
1 BHK35.01 Sq.mts. ( 377 Sq.ft. )
2 BHK45.48 Sq.mts. ( 490 Sq.ft. )
2 BHK45.49 Sq.mts. ( 490 Sq.ft. )
2 BHK45.88 Sq.mts. ( 494 Sq.ft. )
Shop51.53 Sq.mts. ( 555 Sq.ft. )
Shop81.77 Sq.mts. ( 880 Sq.ft. )
Shop11.39 Sq.mts. ( 123 Sq.ft. )
Shop13.12 Sq.mts. ( 141 Sq.ft. )
Shop15.25 Sq.mts. ( 164 Sq.ft. )
Shop16.95 Sq.mts. ( 182 Sq.ft. )
Shop25 Sq.mts. ( 269 Sq.ft. )
Shop131.7 Sq.mts. ( 1418 Sq.ft. )
Shop23.69 Sq.mts. ( 255 Sq.ft. )
Shop25.55 Sq.mts. ( 275 Sq.ft. )
2 BHK44.81 Sq.mts. ( 482 Sq.ft. )
Shop10.19 Sq.mts. ( 110 Sq.ft. )
Shop13.5 Sq.mts. ( 145 Sq.ft. )
Shop13.9 Sq.mts. ( 150 Sq.ft. )
Shop14.86 Sq.mts. ( 160 Sq.ft. )
Shop16.72 Sq.mts. ( 180 Sq.ft. )
Shop18.11 Sq.mts. ( 195 Sq.ft. )
Shop18.58 Sq.mts. ( 200 Sq.ft. )
Shop19.93 Sq.mts. ( 215 Sq.ft. )
Shop22.64 Sq.mts. ( 244 Sq.ft. )
Shop26.18 Sq.mts. ( 282 Sq.ft. )
Shop34.84 Sq.mts. ( 375 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Garden Avenue - K K3last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Completed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
OPEN PARKING100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Vvcmc Water Connection Awaited
Buildings / Wings in Garden Avenue - K K3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Garden Avenue - K K3 by Sridutt Constructionslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

79008 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

427 apartments in total
Total
427
Booked
271
Available
156

Saleable Area Statistics (Sq. ft.)

187164 Total
Total
187164
Booked
117384
Available
69780
Total 427 apartments in project. 271 apartments booked. 63% apartments booked.
Total 187164 Sq.ft. saleable area. 117384 saleable area booked.
63% area booked.

K10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
K10Dec 2022151001151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )22
20 Booked90% Booked
90% Booked
1 BHK35 Sq.mts. ( 377 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK43.68 Sq.mts. ( 470 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK45.14 Sq.mts. ( 486 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK45.34 Sq.mts. ( 488 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK45.98 Sq.mts. ( 495 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK52.14 Sq.mts. ( 561 Sq.ft. )26
20 Booked76% Booked
76% Booked
2 BHK52.53 Sq.mts. ( 565 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.31 Sq.mts. ( 122 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.35 Sq.mts. ( 144 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.75 Sq.mts. ( 148 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.17 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.24 Sq.mts. ( 196 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.68 Sq.mts. ( 201 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.86 Sq.mts. ( 203 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop21.12 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.72 Sq.mts. ( 234 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop24.35 Sq.mts. ( 262 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.71 Sq.mts. ( 341 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop32.87 Sq.mts. ( 354 Sq.ft. )1
1 Booked100% Booked
100% Booked
90 total apartments / 80 apartments booked. 88% apartments booked.
Work Description in Building K10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

K7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
K7Dec 2022151001151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.06 Sq.mts. ( 345 Sq.ft. )25
10 Booked40% Booked
40% Booked
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )23
10 Booked43% Booked
43% Booked
2 BHK45.34 Sq.mts. ( 488 Sq.ft. )28
76 total apartments / 21 apartments booked. 27% apartments booked.
Work Description in Building K7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

K7a

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
K7aDec 2022151001151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.06 Sq.mts. ( 345 Sq.ft. )26
20 Booked76% Booked
76% Booked
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK34.33 Sq.mts. ( 370 Sq.ft. )11
7 Booked63% Booked
63% Booked
1 BHK35.01 Sq.mts. ( 377 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK45.48 Sq.mts. ( 490 Sq.ft. )13
11 Booked84% Booked
84% Booked
2 BHK45.49 Sq.mts. ( 490 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK45.88 Sq.mts. ( 494 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop51.53 Sq.mts. ( 555 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop81.77 Sq.mts. ( 880 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.39 Sq.mts. ( 123 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.12 Sq.mts. ( 141 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.25 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.95 Sq.mts. ( 182 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25 Sq.mts. ( 269 Sq.ft. )1
1 Booked100% Booked
100% Booked
83 total apartments / 70 apartments booked. 84% apartments booked.
Work Description in Building K7aCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

K8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
K8Dec 2022151001151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )50
35 Booked70% Booked
70% Booked
2 BHK45.34 Sq.mts. ( 488 Sq.ft. )28
22 Booked78% Booked
78% Booked
Shop131.7 Sq.mts. ( 1418 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.69 Sq.mts. ( 255 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.55 Sq.mts. ( 275 Sq.ft. )1
None Booked0% Booked
0% Booked
81 total apartments / 57 apartments booked. 70% apartments booked.
Work Description in Building K8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

K9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
K9Dec 2022151001151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.81 Sq.mts. ( 482 Sq.ft. )14
None Booked0% Booked
0% Booked
2 BHK52.53 Sq.mts. ( 565 Sq.ft. )72
40 Booked55% Booked
55% Booked
Shop10.19 Sq.mts. ( 110 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.5 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.9 Sq.mts. ( 150 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.86 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.72 Sq.mts. ( 180 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.11 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.58 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.93 Sq.mts. ( 215 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop22.64 Sq.mts. ( 244 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.18 Sq.mts. ( 282 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.84 Sq.mts. ( 375 Sq.ft. )1
None Booked0% Booked
0% Booked
97 total apartments / 43 apartments booked. 44% apartments booked.
Work Description in Building K9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sridutt Constructions
for Project
Garden Avenue - K K3
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation