Project overview

Ganesh Bhuvan Chs Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800032161. Ganesh Bhuvan Chs Ltd is located at 208/64 To 81. This is a New being developed by Shree Swami Samarth Developers (Project Ganesh Bhuvan).

Ganesh Bhuvan Chs Ltd has 1 BHK, 1RK, PTC, Rehab Shop & Shop Apartments with carpet areas ranging from 153 to 85 Sq.ft. Carpet. The Project has total 302 of which 284 are currently available for sale.

Ganesh Bhuvan Chs Ltd is being developed on a total land area of 17588 Sq.ft. out of which 1549 Sq.ft. i.e 9% is reserved for recreational purposes. Ganesh Bhuvan Chs Ltd has 2 Wings / Towers Rehab Wing A,Sale Wing B

ProjectDeveloperLocationPossession
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Project Details
  • Project:
    Ganesh Bhuvan Chs Ltd
  • Location:
  • 208/64 To 81
  • Const. Stage:
    New
  • Possession:
    31 Dec 2027
Developer Details

  • Developer:
    Shree Swami Samarth Developers (Project Ganesh Bhuvan)
  • Phone:
  • Address:
  • Shh Residency
Project RERA Details
MAHA REARA No: P51800032161
Project Type Residential / Group Housing
RERA Project Status New
Architect Design Crest
Funding Bank DOMBIVLI NAGARI SAHAKARI BANK LIMITED
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Dec 2021
Last Retrived 26 Jul 2025
Ganesh Bhuvan Chs Ltd QR Code
Ganesh Bhuvan Chs Ltd
MahaRERA - P51800032161
Apartment Details & Configuration
TypeArea
Prov. PAP27.88 Sq.mts. ( 300 Sq.ft. )
PTC29.77 Sq.mts. ( 320 Sq.ft. )
Rehab Shop83.01 Sq.mts. ( 894 Sq.ft. )
1 BHK33.87 Sq.mts. ( 365 Sq.ft. )
1RK21.49 Sq.mts. ( 231 Sq.ft. )
1RK22.2 Sq.mts. ( 239 Sq.ft. )
1RK22.53 Sq.mts. ( 243 Sq.ft. )
1RK22.66 Sq.mts. ( 244 Sq.ft. )
1RK22.92 Sq.mts. ( 247 Sq.ft. )
1RK23.71 Sq.mts. ( 255 Sq.ft. )
Rehab Shop19.03 Sq.mts. ( 205 Sq.ft. )
Rehab Shop19.14 Sq.mts. ( 206 Sq.ft. )
Rehab Shop19.72 Sq.mts. ( 212 Sq.ft. )
Rehab Shop20.13 Sq.mts. ( 217 Sq.ft. )
Rehab Shop3.19 Sq.mts. ( 34 Sq.ft. )
Rehab Shop5.55 Sq.mts. ( 60 Sq.ft. )
Rehab Shop6.72 Sq.mts. ( 72 Sq.ft. )
Rehab Shop7.92 Sq.mts. ( 85 Sq.ft. )
Shop14.19 Sq.mts. ( 153 Sq.ft. )
Shop14.58 Sq.mts. ( 157 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ganesh Bhuvan Chs Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Done As Per Approved Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Completed Before Possession To Rehab Wing
Energy management
Na
Fire Protection And Fire Safety Requirements
Will Be Complied As Per Cfo Noc
Landscaping & Tree Planting
Na
Open Parking
Will Be Done As Per Approved Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Complied As Per Spp&Amp; D Remarks Of Mcgm
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Complied As Per Swd Remarks Of Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Complied As Per Rwh Remarks
Water Supply
Will Be Supplied As Required
Buildings / Wings in Ganesh Bhuvan Chs Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ganesh Bhuvan Chs Ltd by Shree Swami Samarth Developers (Project Ganesh Bhuvan)last updated on 26 Jul 2025 as per information obtained from MARA RERA.

17588 Sq. ft.

Project Area

1549 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

302 apartments in total
Total
302
Booked
18
Available
284

Saleable Area Statistics (Sq. ft.)

85068 Total
Total
85068
Booked
5900
Available
79167
Total 302 apartments in project. 18 apartments booked. 5% apartments booked.
Total 85068 Sq.ft. saleable area. 5900 saleable area booked.
7% area booked.

Rehab Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab Wing ADec 202720101201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Prov. PAP27.88 Sq.mts. ( 300 Sq.ft. )6
None Booked0% Booked
0% Booked
PTC29.77 Sq.mts. ( 320 Sq.ft. )8
8 Booked100% Booked
100% Booked
Rehab Flat27.88 Sq.mts. ( 300 Sq.ft. )95
None Booked0% Booked
0% Booked
Rehab Shop83.01 Sq.mts. ( 894 Sq.ft. )1
None Booked0% Booked
0% Booked
Resi cum commercial27.88 Sq.mts. ( 300 Sq.ft. )1
None Booked0% Booked
0% Booked
111 total apartments / 8 apartments booked. 7% apartments booked.
Work Description in Building Rehab Wing ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Sale Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Wing BDec 202719101201
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.77 Sq.mts. ( 320 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK33.87 Sq.mts. ( 365 Sq.ft. )35
1RK21.49 Sq.mts. ( 231 Sq.ft. )17
None Booked0% Booked
0% Booked
1RK22.2 Sq.mts. ( 239 Sq.ft. )18
None Booked0% Booked
0% Booked
1RK22.53 Sq.mts. ( 243 Sq.ft. )19
None Booked0% Booked
0% Booked
1RK22.66 Sq.mts. ( 244 Sq.ft. )38
None Booked0% Booked
0% Booked
1RK22.92 Sq.mts. ( 247 Sq.ft. )19
None Booked0% Booked
0% Booked
1RK23.71 Sq.mts. ( 255 Sq.ft. )18
None Booked0% Booked
0% Booked
PTC29.77 Sq.mts. ( 320 Sq.ft. )7
7 Booked100% Booked
100% Booked
Rehab Shop19.03 Sq.mts. ( 205 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop19.14 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop19.72 Sq.mts. ( 212 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop20.13 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop3.19 Sq.mts. ( 34 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop5.55 Sq.mts. ( 60 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop6.72 Sq.mts. ( 72 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab Shop7.92 Sq.mts. ( 85 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.19 Sq.mts. ( 153 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.58 Sq.mts. ( 157 Sq.ft. )1
None Booked0% Booked
0% Booked
191 total apartments / 10 apartments booked. 5% apartments booked.
Work Description in Building Sale Wing BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Swami Samarth Developers (Project Ganesh Bhuvan)
for Project
Ganesh Bhuvan Chs Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation