Project overview

Galaxygarden Plot No 2 And Plot No 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000018423. Galaxygarden Plot No 2 And Plot No 4 is located at Plot No 2 And Plot No 4 At Sarvey No 20145. This is a New being developed by S K Developers.

Galaxygarden Plot No 2 And Plot No 4 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 266 to 402 Sq.ft. Carpet. The Project has total 224 of which 38 are currently available for sale.

Galaxygarden Plot No 2 And Plot No 4 is being developed on a total land area of 61247 Sq.ft. Galaxygarden Plot No 2 And Plot No 4 has 9 Wings / Towers Galaxy Garden Plot 2 Buildingno 12,Plot 2 Building No 13,Plot 4 Building No 19,Plot 4 Building No 20,Plot 4 Building No 21,Plot 4 Building No 22,Plot 4 Building No 23,Plot 4 Building No 24,Plot 4 Building No 25

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Galaxygarden Plot No 2 And Plot No 4
  • Location:
  • Plot No 2 And Plot No 4 At Sarvey No 20145
  • Const. Stage:
    New
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    S K Developers
  • Phone:
  • Address:
  • Sarvoday Garden, Bldg No.1
Project RERA Details
MAHA REARA No: P52000018423
Project Type Residential / Group Housing
RERA Project Status New
Architect Dharmesh Bhalani Destination
Funding Bank BANK OF BARODA
Proposed Possession 30 Jun 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 01 Jul 2024
Last Retrived 28 Jul 2025
Galaxygarden Plot No 2 And Plot No 4 QR Code
Galaxygarden Plot No 2 And Plot No 4
MahaRERA - P52000018423
Apartment Details & Configuration
TypeArea
1 BHK24.73 Sq.mts. ( 266 Sq.ft. )
1 BHK24.86 Sq.mts. ( 268 Sq.ft. )
1 BHK25.22 Sq.mts. ( 271 Sq.ft. )
1RK18.15 Sq.mts. ( 195 Sq.ft. )
1 BHK24.74 Sq.mts. ( 266 Sq.ft. )
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )
1 BHK26.48 Sq.mts. ( 285 Sq.ft. )
1 BHK26.49 Sq.mts. ( 285 Sq.ft. )
1 BHK26.67 Sq.mts. ( 287 Sq.ft. )
2 BHK37.21 Sq.mts. ( 401 Sq.ft. )
1 BHK26.66 Sq.mts. ( 287 Sq.ft. )
2 BHK37.2 Sq.mts. ( 400 Sq.ft. )
1 BHK26.47 Sq.mts. ( 285 Sq.ft. )
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )
1 BHK26.53 Sq.mts. ( 286 Sq.ft. )
2 BHK37.34 Sq.mts. ( 402 Sq.ft. )
1 BHK24.8 Sq.mts. ( 267 Sq.ft. )
1 BHK25.16 Sq.mts. ( 271 Sq.ft. )
1RK18.22 Sq.mts. ( 196 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Galaxygarden Plot No 2 And Plot No 4last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Comenced Will Be Done As Per Dc Rule
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Not Comenced Will Be Done As Per Dc Rule
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Comenced Will Be Done As Per Dc Rule
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Comenced Will Be Done As Per Dc Rule
Street Lighting
Not Comenced Will Be Done As Per Dc Rule
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Not Comenced Will Be Done As Per Dc Rule
Buildings / Wings in Galaxygarden Plot No 2 And Plot No 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Galaxygarden Plot No 2 And Plot No 4 by S K Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

61247 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

224 apartments in total
Total
224
Booked
186
Available
38

Saleable Area Statistics (Sq. ft.)

63235 Total
Total
63235
Booked
53773
Available
9462
Total 224 apartments in project. 186 apartments booked. 83% apartments booked.
Total 63235 Sq.ft. saleable area. 53773 saleable area booked.
85% area booked.

Galaxy Garden Plot 2 Buildingno 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Galaxy Garden Plot 2 Buildingno 12Dec 20215101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.73 Sq.mts. ( 266 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK24.86 Sq.mts. ( 268 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK25.22 Sq.mts. ( 271 Sq.ft. )12
9 Booked75% Booked
75% Booked
1RK18.15 Sq.mts. ( 195 Sq.ft. )8
4 Booked50% Booked
50% Booked
28 total apartments / 16 apartments booked. 57% apartments booked.
Work Description in Building Galaxy Garden Plot 2 Buildingno 12Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

Plot 2 Building No 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 2 Building No 13Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.73 Sq.mts. ( 266 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK24.86 Sq.mts. ( 268 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.22 Sq.mts. ( 271 Sq.ft. )12
5 Booked41% Booked
41% Booked
1RK18.15 Sq.mts. ( 195 Sq.ft. )8
None Booked0% Booked
0% Booked
28 total apartments / 11 apartments booked. 39% apartments booked.
Work Description in Building Plot 2 Building No 13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Plot 4 Building No 19

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 4 Building No 19Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.74 Sq.mts. ( 266 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.48 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.49 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.67 Sq.mts. ( 287 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK37.21 Sq.mts. ( 401 Sq.ft. )4
4 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building Plot 4 Building No 19Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Plot 4 Building No 20

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 4 Building No 20Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.74 Sq.mts. ( 266 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.48 Sq.mts. ( 285 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK26.66 Sq.mts. ( 287 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK37.2 Sq.mts. ( 400 Sq.ft. )4
4 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building Plot 4 Building No 20Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Plot 4 Building No 21

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 4 Building No 21Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.74 Sq.mts. ( 266 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.47 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.53 Sq.mts. ( 286 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK37.34 Sq.mts. ( 402 Sq.ft. )4
4 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building Plot 4 Building No 21Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Plot 4 Building No 22

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 4 Building No 22Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.74 Sq.mts. ( 266 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.47 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.53 Sq.mts. ( 286 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK37.34 Sq.mts. ( 402 Sq.ft. )4
4 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building Plot 4 Building No 22Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Plot 4 Building No 23

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 4 Building No 23Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.8 Sq.mts. ( 267 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.16 Sq.mts. ( 271 Sq.ft. )16
16 Booked100% Booked
100% Booked
1RK18.22 Sq.mts. ( 196 Sq.ft. )4
4 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building Plot 4 Building No 23Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Plot 4 Building No 24

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 4 Building No 24Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.74 Sq.mts. ( 266 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK26.47 Sq.mts. ( 285 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK26.53 Sq.mts. ( 286 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK37.34 Sq.mts. ( 402 Sq.ft. )4
4 Booked100% Booked
100% Booked
24 total apartments / 16 apartments booked. 66% apartments booked.
Work Description in Building Plot 4 Building No 24Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Plot 4 Building No 25

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Plot 4 Building No 25Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.74 Sq.mts. ( 266 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.47 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.51 Sq.mts. ( 285 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.53 Sq.mts. ( 286 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK37.34 Sq.mts. ( 402 Sq.ft. )4
4 Booked100% Booked
100% Booked
24 total apartments / 23 apartments booked. 95% apartments booked.
Work Description in Building Plot 4 Building No 25Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
S K Developers
for Project
Galaxygarden Plot No 2 And Plot No 4
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation