Project overview

Galaxy Emperia Phase-1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000017287. Galaxy Emperia Phase-1 is located at 401501. This is a New Project being developed by Galaxy Shine Developers.

Galaxy Emperia Phase-1 has FLAT Apartments with carpet areas ranging from 274 to 336 Sq.ft. Carpet. The Project has total 75 of which 30 are currently available for sale.

Galaxy Emperia Phase-1 is being developed on a total land area of 33336 Sq.ft. Galaxy Emperia Phase-1 has 3 Wings / Towers Building No-2,Building No-3,Building No-6

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Galaxy Emperia Phase-1
  • Location:
  • 401501
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Galaxy Shine Developers
  • Phone:
  • Address:
  • Shop No-3, Sanjay Nagar, Navapur Road, Opp Raymond Showroom, Boisar West, 401501
Project RERA Details
MAHA REARA No: P99000017287
Project Type Residential
RERA Project Status New Project
Funding Bank Tamilnad Mercantile bank Ltd
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 02 Feb 2024
Last Retrived 28 Jul 2025
Galaxy Emperia Phase-1 QR Code
Galaxy Emperia Phase-1
MahaRERA - P99000017287
Apartment Details & Configuration
TypeArea
FLAT41.47 Sq.mts. ( 446 Sq.ft. )
FLAT42.35 Sq.mts. ( 456 Sq.ft. )
FLAT47.85 Sq.mts. ( 515 Sq.ft. )
SHOP10 Sq.mts. ( 108 Sq.ft. )
SHOP14.5 Sq.mts. ( 156 Sq.ft. )
SHOP26.86 Sq.mts. ( 289 Sq.ft. )
FLAT30.37 Sq.mts. ( 327 Sq.ft. )
FLAT30.85 Sq.mts. ( 332 Sq.ft. )
FLAT33.6 Sq.mts. ( 362 Sq.ft. )
FLAT25.43 Sq.mts. ( 274 Sq.ft. )
FLAT26.68 Sq.mts. ( 287 Sq.ft. )
FLAT26.75 Sq.mts. ( 288 Sq.ft. )
FLAT27.45 Sq.mts. ( 295 Sq.ft. )
FLAT27.55 Sq.mts. ( 297 Sq.ft. )
FLAT27.92 Sq.mts. ( 301 Sq.ft. )
FLAT28.5 Sq.mts. ( 307 Sq.ft. )
FLAT28.91 Sq.mts. ( 311 Sq.ft. )
FLAT28.95 Sq.mts. ( 312 Sq.ft. )
FLAT29.73 Sq.mts. ( 320 Sq.ft. )
FLAT31.25 Sq.mts. ( 336 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Galaxy Emperia Phase-1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Open Area To Be Provided
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room Will Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Open Parking Available
Sewerage (Chamber, Lines, Septic Tank , STP)
Septik Tank Will Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Yet To Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Will Be Done
Water Supply100% completed
95% Complete
Borewell Will Be Provided
Buildings / Wings in Galaxy Emperia Phase-1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Galaxy Emperia Phase-1 by Galaxy Shine Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

33336 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

75 apartments in total
Total
75
Booked
45
Available
30

Saleable Area Statistics (Sq. ft.)

25656 Total
Total
25656
Booked
15024
Available
10632
Total 75 apartments in project. 45 apartments booked. 60% apartments booked.
Total 25656 Sq.ft. saleable area. 15024 saleable area booked.
59% area booked.

Building No-2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-2Dec 20215101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT41.47 Sq.mts. ( 446 Sq.ft. )2
None Booked0% Booked
0% Booked
FLAT42.35 Sq.mts. ( 456 Sq.ft. )8
4 Booked50% Booked
50% Booked
FLAT47.85 Sq.mts. ( 515 Sq.ft. )8
2 Booked25% Booked
25% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP26.86 Sq.mts. ( 289 Sq.ft. )2
None Booked0% Booked
0% Booked
25 total apartments / 7 apartments booked. 28% apartments booked.
Work Description in Building Building No-2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress52% done
52% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No-3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-3Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT30.37 Sq.mts. ( 327 Sq.ft. )4
3 Booked75% Booked
75% Booked
FLAT30.85 Sq.mts. ( 332 Sq.ft. )12
9 Booked75% Booked
75% Booked
FLAT33.6 Sq.mts. ( 362 Sq.ft. )4
3 Booked75% Booked
75% Booked
20 total apartments / 15 apartments booked. 75% apartments booked.
Work Description in Building Building No-3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress85% done
85% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No-6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No-6Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT25.43 Sq.mts. ( 274 Sq.ft. )4
2 Booked50% Booked
50% Booked
FLAT26.68 Sq.mts. ( 287 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT26.75 Sq.mts. ( 288 Sq.ft. )2
2 Booked100% Booked
100% Booked
FLAT27.45 Sq.mts. ( 295 Sq.ft. )4
3 Booked75% Booked
75% Booked
FLAT27.55 Sq.mts. ( 297 Sq.ft. )4
3 Booked75% Booked
75% Booked
FLAT27.92 Sq.mts. ( 301 Sq.ft. )4
3 Booked75% Booked
75% Booked
FLAT28.5 Sq.mts. ( 307 Sq.ft. )4
3 Booked75% Booked
75% Booked
FLAT28.91 Sq.mts. ( 311 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT28.95 Sq.mts. ( 312 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT29.73 Sq.mts. ( 320 Sq.ft. )1
1 Booked100% Booked
100% Booked
FLAT31.25 Sq.mts. ( 336 Sq.ft. )4
3 Booked75% Booked
75% Booked
30 total apartments / 23 apartments booked. 76% apartments booked.
Work Description in Building Building No-6Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Galaxy Shine Developers
for Project
Galaxy Emperia Phase-1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation