Project overview
Galaxy Emperia Phase-1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000017287. Galaxy Emperia Phase-1 is located at 401501. This is a New Project being developed by Galaxy Shine Developers.
Galaxy Emperia Phase-1 has FLAT Apartments with carpet areas ranging from 274 to 336 Sq.ft. Carpet. The Project has total 75 of which 30 are currently available for sale.
Galaxy Emperia Phase-1 is being developed on a total land area of 33336 Sq.ft. Galaxy Emperia Phase-1 has 3 Wings / Towers Building No-2,Building No-3,Building No-6
| Project | Developer | Location | Possession |
-
Project:
Galaxy Emperia Phase-1
-
Location:
-
401501
-
Const. Stage:
New Project
-
Possession:
30 Dec 2022
-
Developer:
Galaxy Shine Developers
-
Phone:
-
Address:
-
Shop No-3, Sanjay Nagar, Navapur Road, Opp Raymond Showroom, Boisar West, 401501
| MAHA REARA No: |
P99000017287 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
Tamilnad Mercantile bank Ltd |
| Proposed Possession |
30 Dec 2022 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
02 Feb 2024 |
| Last Retrived |
28 Jul 2025 |
Galaxy Emperia Phase-1 QR Code
Galaxy Emperia Phase-1
MahaRERA - P99000017287
| Type | Area |
| FLAT | 41.47 Sq.mts. ( 446 Sq.ft. ) |
| FLAT | 42.35 Sq.mts. ( 456 Sq.ft. ) |
| FLAT | 47.85 Sq.mts. ( 515 Sq.ft. ) |
| SHOP | 10 Sq.mts. ( 108 Sq.ft. ) |
| SHOP | 14.5 Sq.mts. ( 156 Sq.ft. ) |
| SHOP | 26.86 Sq.mts. ( 289 Sq.ft. ) |
| FLAT | 30.37 Sq.mts. ( 327 Sq.ft. ) |
| FLAT | 30.85 Sq.mts. ( 332 Sq.ft. ) |
| FLAT | 33.6 Sq.mts. ( 362 Sq.ft. ) |
| FLAT | 25.43 Sq.mts. ( 274 Sq.ft. ) |
| FLAT | 26.68 Sq.mts. ( 287 Sq.ft. ) |
| FLAT | 26.75 Sq.mts. ( 288 Sq.ft. ) |
| FLAT | 27.45 Sq.mts. ( 295 Sq.ft. ) |
| FLAT | 27.55 Sq.mts. ( 297 Sq.ft. ) |
| FLAT | 27.92 Sq.mts. ( 301 Sq.ft. ) |
| FLAT | 28.5 Sq.mts. ( 307 Sq.ft. ) |
| FLAT | 28.91 Sq.mts. ( 311 Sq.ft. ) |
| FLAT | 28.95 Sq.mts. ( 312 Sq.ft. ) |
| FLAT | 29.73 Sq.mts. ( 320 Sq.ft. ) |
| FLAT | 31.25 Sq.mts. ( 336 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Galaxy Emperia Phase-1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Open Area To Be Provided |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electric Meter Room Will Be Provided |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Na |
|
|
|
Open Parking Available |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Septik Tank Will Be Provided |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Na |
|
|
|
Yet To Be Provided |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting Will Be Done |
Water Supply100% completed
|
|
Borewell Will Be Provided |
Buildings / Wings in Galaxy Emperia Phase-1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Galaxy Emperia Phase-1 by Galaxy Shine Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
75
apartments in total
Saleable Area Statistics (Sq. ft.)
25656
Total
Total 75 apartments in project. 45 apartments booked. 60% apartments booked.
Total 25656 Sq.ft. saleable area. 15024 saleable area booked.
59% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No-2 | Dec 2021 | 5 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| FLAT | 41.47 Sq.mts. ( 446 Sq.ft. ) | 2 | |
| FLAT | 42.35 Sq.mts. ( 456 Sq.ft. ) | 8 | |
| FLAT | 47.85 Sq.mts. ( 515 Sq.ft. ) | 8 | |
| SHOP | 10 Sq.mts. ( 108 Sq.ft. ) | 3 | |
| SHOP | 14.5 Sq.mts. ( 156 Sq.ft. ) | 2 | |
| SHOP | 26.86 Sq.mts. ( 289 Sq.ft. ) | 2 | |
25 total apartments / 7 apartments booked. 28% apartments booked. |
| Work Description in Building Building No-2 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No-3 | Dec 2021 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| FLAT | 30.37 Sq.mts. ( 327 Sq.ft. ) | 4 | |
| FLAT | 30.85 Sq.mts. ( 332 Sq.ft. ) | 12 | |
| FLAT | 33.6 Sq.mts. ( 362 Sq.ft. ) | 4 | |
20 total apartments / 15 apartments booked. 75% apartments booked. |
| Work Description in Building Building No-3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No-6 | Dec 2021 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| FLAT | 25.43 Sq.mts. ( 274 Sq.ft. ) | 4 | |
| FLAT | 26.68 Sq.mts. ( 287 Sq.ft. ) | 1 | |
| FLAT | 26.75 Sq.mts. ( 288 Sq.ft. ) | 2 | |
| FLAT | 27.45 Sq.mts. ( 295 Sq.ft. ) | 4 | |
| FLAT | 27.55 Sq.mts. ( 297 Sq.ft. ) | 4 | |
| FLAT | 27.92 Sq.mts. ( 301 Sq.ft. ) | 4 | |
| FLAT | 28.5 Sq.mts. ( 307 Sq.ft. ) | 4 | |
| FLAT | 28.91 Sq.mts. ( 311 Sq.ft. ) | 1 | |
| FLAT | 28.95 Sq.mts. ( 312 Sq.ft. ) | 1 | |
| FLAT | 29.73 Sq.mts. ( 320 Sq.ft. ) | 1 | |
| FLAT | 31.25 Sq.mts. ( 336 Sq.ft. ) | 4 | |
30 total apartments / 23 apartments booked. 76% apartments booked. |
| Work Description in Building Building No-6 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Galaxy Shine Developers
for Project
Galaxy Emperia Phase-1
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |