Project overview

G S Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000021282. G S Residency is located at Pasthal Village Boisar. This is a New Project being developed by Anupam Giri.

G S Residency has 1 BHK Apartments with carpet areas ranging from 219 to 329 Sq.ft. Carpet. The Project has total 24 of which 24 are currently available for sale.

G S Residency is being developed on a total land area of 7535 Sq.ft. out of which 757 Sq.ft. i.e 10% is reserved for recreational purposes. G S Residency has 1 Wings / Towers G S Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    G S Residency
  • Location:
  • Pasthal Village Boisar
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Anupam Giri
  • Phone:
  • Address:
  • Shop No 2A, Janki Kunj Chs, Universal Complex, Boisar Tarapur Road, Boisar West, 401501
Project RERA Details
MAHA REARA No: P99000021282
Project Type Residential
RERA Project Status New Project
Funding Bank BASSEIN CATHOLIC CO-OPERATIVE BANK LTD
Proposed Possession 30 Jun 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 06 Aug 2021
Last Retrived 28 Jul 2025
G S Residency QR Code
G S Residency
MahaRERA - P99000021282
Apartment Details & Configuration
TypeArea
1 BHK20.3 Sq.mts. ( 219 Sq.ft. )
1 BHK22.86 Sq.mts. ( 246 Sq.ft. )
1 BHK23.88 Sq.mts. ( 257 Sq.ft. )
1 BHK23.9 Sq.mts. ( 257 Sq.ft. )
1 BHK27.1 Sq.mts. ( 292 Sq.ft. )
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of G S Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station25% completed
25% Complete
25 Percent
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
50 Percent
Landscaping & Tree Planting25% completed
25% Complete
Few Plantation Work Has Been Don
Open Parking25% completed
25% Complete
Pcc Completed
Sewerage (Chamber, Lines, Septic Tank , STP)65% completed
65% Complete
Sewerage Tank Construction Completed
Solid Waste Management And Disposal
Na
Storm Water Drains60% completed
60% Complete
Outer Rain Water Outlet Fitting Don
Street Lighting25% completed
25% Complete
Wiring Done
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply50% completed
50% Complete
Plumbing Work Don
Buildings / Wings in G S Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of G S Residency by Anupam Girilast updated on 28 Jul 2025 as per information obtained from MARA RERA.

7535 Sq. ft.

Project Area

757 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
0
Available
24

Saleable Area Statistics (Sq. ft.)

6411 Total
Total
6411
Booked
0
Available
6411
Total 24 apartments in project. 0 apartments booked. 0% apartments booked.
Total 6411 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

G S Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G S ResidencyDec 20204100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK20.3 Sq.mts. ( 219 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK22.86 Sq.mts. ( 246 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK23.88 Sq.mts. ( 257 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK23.9 Sq.mts. ( 257 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK27.1 Sq.mts. ( 292 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )3
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building G S ResidencyCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress85% done
85% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Anupam Giri
for Project
G S Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.