Project overview

Fennel H is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003652. Fennel H is located at 183. This is a Ongoing being developed by Royale Urbanspace Llp.

Fennel H has 1 BHK TYPE 1, 1 BHK TYPE 2, 1 RK TYPE 1 & 1 RK TYPE 2 Apartments with carpet areas ranging from 187 to 277 Sq.ft. Carpet. The Project has total 60 of which 20 are currently available for sale.

Fennel H is being developed on a total land area of 3934 Sq.ft. Fennel H has 2 Wings / Towers Fennel H 1,Fennel H2

ProjectDeveloperLocationPossession
Chintamani BuildersChintamani BuildersGut No 22P, 23 And 24 Na Plot No.1 And 231-12-2018 00:00:00
OrchidRoyale Urbanspace Llp206-21631-07-2019 00:00:00
Tulip NRoyale Urbanspace44/131-12-2019 00:00:00
Project Details
  • Project:
    Fennel H
  • Location:
  • 183
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Royale Urbanspace Llp
  • Phone:
  • Address:
  • Nanji Dayabhai Chawl
Project RERA Details
MAHA REARA No: P51700003652
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Triarch Design Studio
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 06 Aug 2017
Last Retrived 26 Jul 2025
Fennel H QR Code
Fennel H
MahaRERA - P51700003652
Apartment Details & Configuration
TypeArea
1 BHK TYPE 125.7 Sq.mts. ( 277 Sq.ft. )
1 BHK TYPE 225.65 Sq.mts. ( 276 Sq.ft. )
1 RK TYPE 117.41 Sq.mts. ( 187 Sq.ft. )
1 RK TYPE 218.74 Sq.mts. ( 202 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Fennel H last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Rg Common For Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electric Meter Room Will Be Provided
Energy management
Solar Water Heating System Will Be Provided
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Planting Only
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp For Common Between 4 Bldg
Solid Waste Management And Disposal
Na
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Will Be Provied
Water Supply
Ground Water
Buildings / Wings in Fennel H
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Fennel H by Royale Urbanspace Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

3934 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

60 apartments in total
Total
60
Booked
40
Available
20

Saleable Area Statistics (Sq. ft.)

13766 Total
Total
13766
Booked
9113
Available
4653
Total 60 apartments in project. 40 apartments booked. 66% apartments booked.
Total 13766 Sq.ft. saleable area. 9113 saleable area booked.
66% area booked.

Fennel H 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Fennel H 1Jan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 125.7 Sq.mts. ( 277 Sq.ft. )9
7 Booked77% Booked
77% Booked
1 BHK TYPE 225.65 Sq.mts. ( 276 Sq.ft. )5
4 Booked80% Booked
80% Booked
1 RK TYPE 117.41 Sq.mts. ( 187 Sq.ft. )15
10 Booked66% Booked
66% Booked
1 RK TYPE 218.74 Sq.mts. ( 202 Sq.ft. )1
1 Booked100% Booked
100% Booked
30 total apartments / 22 apartments booked. 73% apartments booked.
Work Description in Building Fennel H 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress94% done
94% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress94% done
94% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress94% done
94% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress94% done
94% Booked
Sanitary Fittings within the flats / premises
work-in-progress94% done
94% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress94% done
94% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress94% done
94% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress94% done
94% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Fennel H2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Fennel H2Jan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 125.7 Sq.mts. ( 277 Sq.ft. )9
5 Booked55% Booked
55% Booked
1 BHK TYPE 225.65 Sq.mts. ( 276 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 RK TYPE 117.41 Sq.mts. ( 187 Sq.ft. )15
11 Booked73% Booked
73% Booked
1 RK TYPE 218.74 Sq.mts. ( 202 Sq.ft. )1
None Booked0% Booked
0% Booked
30 total apartments / 18 apartments booked. 60% apartments booked.
Work Description in Building Fennel H2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress94% done
94% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress94% done
94% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress94% done
94% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress94% done
94% Booked
Sanitary Fittings within the flats / premises
work-in-progress94% done
94% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress94% done
94% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress94% done
94% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress94% done
94% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Royale Urbanspace Llp
for Project
Fennel H
last updated on 26 Jul 2025 as per information obtained from MARA RERA.