Project overview

Fatima Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900001563. Fatima Heights is located at 1521. This is a Ongoing being developed by M K Enterprises.

Fatima Heights has 1 BHK Apartments with carpet areas ranging from 383 to 384 Sq.ft. Carpet. The Project has total 1271 of which 940 are currently available for sale.

Fatima Heights is being developed on a total land area of 150733 Sq.ft. out of which 6656 Sq.ft. i.e 4% is reserved for recreational purposes. Fatima Heights has 8 Wings / Towers Fatima Heights - Sale,Wing A -Rehab - Kgn Chs Ltd,Wing B - Rehab,Wing C - Rehab - Shree Laxminarayan Chs Ltd,Wing D -Rehab -Shree Laxminarayan Chs Ltd,Wing E -Rehab,Wing F -Rehab,Wing G -Rehab - Baitulaman Chs Ltd

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Fatima Heights
  • Location:
  • 1521
  • Const. Stage:
    Ongoing
  • Possession:
    04 Dec 2023
Developer Details

  • Developer:
    M K Enterprises
  • Phone:
  • Address:
  • Mehfil
Project RERA Details
MAHA REARA No: P51900001563
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Amir Maredia
Funding Bank UNION BANK OF INDIA
Proposed Possession 04 Dec 2023
Revised Possession 04 Dec 2023
Extended Possession 03 Dec 2024
Litigations No Litigations
Last Modified 25 Feb 2025
Last Retrived 26 Jul 2025
Fatima Heights QR Code
Fatima Heights
MahaRERA - P51900001563
Apartment Details & Configuration
TypeArea
1 BHK44 Sq.mts. ( 474 Sq.ft. )
1 BHK45.04 Sq.mts. ( 485 Sq.ft. )
1 BHK45.27 Sq.mts. ( 487 Sq.ft. )
2 BHK63.65 Sq.mts. ( 685 Sq.ft. )
2 BHK66.46 Sq.mts. ( 715 Sq.ft. )
2 BHK72.15 Sq.mts. ( 777 Sq.ft. )
2 BHK78.13 Sq.mts. ( 841 Sq.ft. )
1 BHK35.46 Sq.mts. ( 382 Sq.ft. )
1 BHK35.54 Sq.mts. ( 383 Sq.ft. )
1 BHK35.68 Sq.mts. ( 384 Sq.ft. )
1 BHK35.84 Sq.mts. ( 386 Sq.ft. )
1 BHK35.88 Sq.mts. ( 386 Sq.ft. )
1 BHK33.34 Sq.mts. ( 359 Sq.ft. )
1 BHK34.35 Sq.mts. ( 370 Sq.ft. )
1 BHK34.69 Sq.mts. ( 373 Sq.ft. )
1 BHK35.6 Sq.mts. ( 383 Sq.ft. )
1 BHK35.69 Sq.mts. ( 384 Sq.ft. )
1 BHK35.63 Sq.mts. ( 384 Sq.ft. )
1 BHK35.67 Sq.mts. ( 384 Sq.ft. )
1 BHK35.71 Sq.mts. ( 384 Sq.ft. )
1 BHK35.86 Sq.mts. ( 386 Sq.ft. )
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )
1 BHK27.88 Sq.mts. ( 300 Sq.ft. )
1 BHK35.58 Sq.mts. ( 383 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Fatima Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Commenced
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Meters Provided For 4 Completed Wings
Energy management20% completed
20% Complete
Work Not Commenced
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
Work Not Commenced
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Chamber Provided As Per Bmc Norms
Solid Waste Management And Disposal90% completed
90% Complete
Work Started
Storm Water Drains90% completed
90% Complete
Provided As Per Bmc
Street Lighting65% completed
65% Complete
Work Not Commenced
Treatment And Disposal Of Sewage And Sullage Water90% completed
90% Complete
Work Started
Water Conservation, Rain water Harvesting90% completed
90% Complete
Completed
Water Supply85% completed
85% Complete
Water Supply To 4 Wings -A / C / D / G
Buildings / Wings in Fatima Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Fatima Heights by M K Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

150733 Sq. ft.

Project Area

6656 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

1271 apartments in total
Total
1271
Booked
331
Available
940

Saleable Area Statistics (Sq. ft.)

542546 Total
Total
542546
Booked
188930
Available
353616
Total 1271 apartments in project. 331 apartments booked. 26% apartments booked.
Total 542546 Sq.ft. saleable area. 188930 saleable area booked.
35% area booked.

Fatima Heights - Sale

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Fatima Heights - SaleApr 202342101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44 Sq.mts. ( 474 Sq.ft. )78
64 Booked82% Booked
82% Booked
1 BHK45.04 Sq.mts. ( 485 Sq.ft. )81
67 Booked82% Booked
82% Booked
1 BHK45.27 Sq.mts. ( 487 Sq.ft. )77
67 Booked87% Booked
87% Booked
2 BHK63.65 Sq.mts. ( 685 Sq.ft. )73
65 Booked89% Booked
89% Booked
2 BHK66.46 Sq.mts. ( 715 Sq.ft. )82
64 Booked78% Booked
78% Booked
2 BHK72.15 Sq.mts. ( 777 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK78.13 Sq.mts. ( 841 Sq.ft. )1
1 Booked100% Booked
100% Booked
395 total apartments / 331 apartments booked. 83% apartments booked.
Work Description in Building Fatima Heights - SaleCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress95% done
95% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing A -Rehab - Kgn Chs Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A -Rehab - Kgn Chs LtdApr 202323101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.46 Sq.mts. ( 382 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK35.54 Sq.mts. ( 383 Sq.ft. )46
None Booked0% Booked
0% Booked
1 BHK35.68 Sq.mts. ( 384 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK35.84 Sq.mts. ( 386 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK35.88 Sq.mts. ( 386 Sq.ft. )23
None Booked0% Booked
0% Booked
134 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A -Rehab - Kgn Chs LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B - Rehab

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - RehabApr 202313101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.34 Sq.mts. ( 359 Sq.ft. )13
None Booked0% Booked
0% Booked
1 BHK34.35 Sq.mts. ( 370 Sq.ft. )13
None Booked0% Booked
0% Booked
1 BHK34.69 Sq.mts. ( 373 Sq.ft. )74
None Booked0% Booked
0% Booked
100 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing B - RehabCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C - Rehab - Shree Laxminarayan Chs Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C - Rehab - Shree Laxminarayan Chs LtdJun 202323101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.6 Sq.mts. ( 383 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK35.69 Sq.mts. ( 384 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK35.84 Sq.mts. ( 386 Sq.ft. )90
None Booked0% Booked
0% Booked
133 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C - Rehab - Shree Laxminarayan Chs LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress75% done
75% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D -Rehab -Shree Laxminarayan Chs Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D -Rehab -Shree Laxminarayan Chs LtdApr 202323101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.63 Sq.mts. ( 384 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK35.67 Sq.mts. ( 384 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK35.71 Sq.mts. ( 384 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK35.86 Sq.mts. ( 386 Sq.ft. )44
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )21
None Booked0% Booked
0% Booked
134 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing D -Rehab -Shree Laxminarayan Chs LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E -Rehab

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing E -RehabJan 190024101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.88 Sq.mts. ( 300 Sq.ft. )172
None Booked0% Booked
0% Booked
172 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing E -RehabCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing F -Rehab

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing F -RehabJan 19008101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.88 Sq.mts. ( 300 Sq.ft. )47
None Booked0% Booked
0% Booked
47 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing F -RehabCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing G -Rehab - Baitulaman Chs Ltd

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing G -Rehab - Baitulaman Chs LtdApr 202323101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.58 Sq.mts. ( 383 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK35.6 Sq.mts. ( 383 Sq.ft. )23
None Booked0% Booked
0% Booked
1 BHK35.69 Sq.mts. ( 384 Sq.ft. )68
None Booked0% Booked
0% Booked
1 BHK35.71 Sq.mts. ( 384 Sq.ft. )44
None Booked0% Booked
0% Booked
156 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing G -Rehab - Baitulaman Chs LtdCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M K Enterprises
for Project
Fatima Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation