Project overview

Fairmont Moksh is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003351. Fairmont Moksh is located at Cts 155. This is a Ongoing being developed by Fairmont Constructions Private Limited.

Fairmont Moksh has 1 BHK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 429 to 1039 Sq.ft. Carpet. The Project has total 30 of which 26 are currently available for sale.

Fairmont Moksh is being developed on a total land area of 9207 Sq.ft. Fairmont Moksh has 1 Wings / Towers Fairmont Moksh

ProjectDeveloperLocationPossession
Platinum Tower - 7Tirupati Gruhpravesh Llp1/6A, Survey No 106 /1A, 195 Pt30-06-2019 00:00:00
Kabra ParadiseKabra Estate And Investment Consultants195 Part/106A31-12-2018 00:00:00
Stadium ViewAcme Avenue Infrastructure Pvt. Ltd.Cts No 835 Part31-12-2019 00:00:00
Pearl HazelineChandiwala Enterprises474/A 474/A/1 474/A/2 475 484 484/1 484/2 48531-05-2018 00:00:00
Saffron HeightsPratham Varadvinayak Developers LlpCts No 83830-09-2021 00:00:00
Fairmont MokshFairmont Constructions Private LimitedCts 15531-12-2019 00:00:00
Green WoodPerfect Construction1A/287/C31-12-2019 00:00:00
Shrey ApartmentAditi Constructions145C31-12-2019 00:00:00
Hubtown Premiere Residences - CommercialHubtown LimitedCts No 141 A31-07-2026 00:00:00
Auris BlissTranscon-Sheth Creators Private LimitedCts No. 3654 3653 3652 3651 365 366 367 368 371 Pt30-12-2024 00:00:00
Ideal ChslNeumec Infrastructure Llp195/16931-12-2019 00:00:00
Milap Co-Operative Housing SocietyGolden Eyecon164, 164/ 1 To 620-03-2018 00:00:00
Project Details
  • Project:
    Fairmont Moksh
  • Location:
  • Cts 155
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Fairmont Constructions Private Limited
  • Phone:
  • Address:
  • Vastu Prestige
Project RERA Details
MAHA REARA No: P51800003351
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ellora Project Consultants Pvt Ltd
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2020
Litigations No Litigations
Last Modified 10 Jan 2021
Last Retrived 26 Jul 2025
Fairmont Moksh QR Code
Fairmont Moksh
MahaRERA - P51800003351
Apartment Details & Configuration
TypeArea
1 BHK39.82 Sq.mts. ( 429 Sq.ft. )
2 BHK72.73 Sq.mts. ( 783 Sq.ft. )
2 BHK75.98 Sq.mts. ( 818 Sq.ft. )
3 BHK96.56 Sq.mts. ( 1039 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Fairmont Mokshlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Children???s mini pool
Proposed
Close circuit security with intercom connections
Proposed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Sub Station/Transformer
Elegant & well designed entrance lobby
Proposed
Energy management
Reliance Substation
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Gymnasium
Proposed
Landscaping & Tree Planting
Na
Open Gazebo/Garden/sitting area
Proposed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Swd Remarks
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Vigilant security system
Proposed
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Fairmont Moksh
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Fairmont Moksh by Fairmont Constructions Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9207 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

30 apartments in total
Total
30
Booked
4
Available
26

Saleable Area Statistics (Sq. ft.)

26758 Total
Total
26758
Booked
3901
Available
22857
Total 30 apartments in project. 4 apartments booked. 13% apartments booked.
Total 26758 Sq.ft. saleable area. 3901 saleable area booked.
15% area booked.

Fairmont Moksh

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Fairmont MokshJan 1900171110034
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.82 Sq.mts. ( 429 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK72.73 Sq.mts. ( 783 Sq.ft. )14
2 BHK75.98 Sq.mts. ( 818 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK96.56 Sq.mts. ( 1039 Sq.ft. )14
3 Booked21% Booked
21% Booked
30 total apartments / 4 apartments booked. 13% apartments booked.
Work Description in Building Fairmont MokshCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress50% done
50% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress30% done
30% Booked
Channel Partners
Channel Partners Registered by Developer
Fairmont Constructions Private Limited
for Project
Fairmont Moksh
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation