Project overview

Fairmont is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800024818. Fairmont is located at 112, 112 /1 To 16. This is a New being developed by Trident Ozone Llp.

Fairmont has 1 BHK, FITNESS CENTER, REHAB FLAT, REHAB SHOP & SOCIETY OFFICE Apartments with carpet areas ranging from 191 to 873 Sq.ft. Carpet. The Project has total 212 of which 191 are currently available for sale.

Fairmont is being developed on a total land area of 17578 Sq.ft. out of which 1488 Sq.ft. i.e 8% is reserved for recreational purposes. Fairmont has 2 Wings / Towers Wing A Rehab,Wing B Sale

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Fairmont
  • Location:
  • 112, 112 /1 To 16
  • Const. Stage:
    New
  • Possession:
    30 Dec 2026
Developer Details

  • Developer:
    Trident Ozone Llp
  • Phone:
  • Address:
  • Sachdev Complex
Project RERA Details
MAHA REARA No: P51800024818
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Jun 2025
Last Retrived 26 Jul 2025
Fairmont QR Code
Fairmont
MahaRERA - P51800024818
Apartment Details & Configuration
TypeArea
1 BHK28.01 Sq.mts. ( 301 Sq.ft. )
1 BHK29.16 Sq.mts. ( 314 Sq.ft. )
Shop12.75 Sq.mts. ( 137 Sq.ft. )
Shop18.58 Sq.mts. ( 200 Sq.ft. )
Shop18.77 Sq.mts. ( 202 Sq.ft. )
Shop19.52 Sq.mts. ( 210 Sq.ft. )
Shop19.94 Sq.mts. ( 215 Sq.ft. )
Shop20.44 Sq.mts. ( 220 Sq.ft. )
Shop20.75 Sq.mts. ( 223 Sq.ft. )
Shop21.06 Sq.mts. ( 227 Sq.ft. )
Shop21.07 Sq.mts. ( 227 Sq.ft. )
Shop21.11 Sq.mts. ( 227 Sq.ft. )
Shop22.33 Sq.mts. ( 240 Sq.ft. )
Shop24.02 Sq.mts. ( 259 Sq.ft. )
Shop26.63 Sq.mts. ( 287 Sq.ft. )
Shop26.74 Sq.mts. ( 288 Sq.ft. )
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )
1 BHK29.7 Sq.mts. ( 320 Sq.ft. )
1 BHK29.83 Sq.mts. ( 321 Sq.ft. )
1 BHK29.93 Sq.mts. ( 322 Sq.ft. )
FITNESS CENTER81.15 Sq.mts. ( 873 Sq.ft. )
REHAB FLAT27.88 Sq.mts. ( 300 Sq.ft. )
SOCIETY OFFICE17.78 Sq.mts. ( 191 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Fairmontlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Developer
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Developer
Energy management
Na
Fire Protection And Fire Safety Requirements
Developer
Landscaping & Tree Planting
Na
Open Parking
Na
PUMP ROOM
Developer
Sewerage (Chamber, Lines, Septic Tank , STP)
Mcgm
Solid Waste Management And Disposal
Na
Storm Water Drains
Developer
Street Lighting
Mcgm
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Developers
Water Supply
Mcgm
Buildings / Wings in Fairmont
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Fairmont by Trident Ozone Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

17578 Sq. ft.

Project Area

1488 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

212 apartments in total
Total
212
Booked
21
Available
191

Saleable Area Statistics (Sq. ft.)

65511 Total
Total
65511
Booked
6721
Available
58790
Total 212 apartments in project. 21 apartments booked. 9% apartments booked.
Total 65511 Sq.ft. saleable area. 6721 saleable area booked.
10% area booked.

Wing A Rehab

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A RehabDec 2025231010021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.01 Sq.mts. ( 301 Sq.ft. )73
None Booked0% Booked
0% Booked
1 BHK29.16 Sq.mts. ( 314 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop12.75 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.58 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.77 Sq.mts. ( 202 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.52 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.94 Sq.mts. ( 215 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.44 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.75 Sq.mts. ( 223 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.06 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.07 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.11 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.33 Sq.mts. ( 240 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.02 Sq.mts. ( 259 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.63 Sq.mts. ( 287 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.74 Sq.mts. ( 288 Sq.ft. )1
None Booked0% Booked
0% Booked
91 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A RehabCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress86% done
86% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress78% done
78% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress91% done
91% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress91% done
91% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress86% done
86% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B Sale

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B SaleDec 2025231010023
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )19
4 Booked21% Booked
21% Booked
1 BHK29.7 Sq.mts. ( 320 Sq.ft. )58
12 Booked20% Booked
20% Booked
1 BHK29.83 Sq.mts. ( 321 Sq.ft. )20
1 BHK29.93 Sq.mts. ( 322 Sq.ft. )20
4 Booked20% Booked
20% Booked
FITNESS CENTER81.15 Sq.mts. ( 873 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB FLAT27.88 Sq.mts. ( 300 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB SHOP24.02 Sq.mts. ( 259 Sq.ft. )1
None Booked0% Booked
0% Booked
SOCIETY OFFICE17.78 Sq.mts. ( 191 Sq.ft. )1
None Booked0% Booked
0% Booked
121 total apartments / 21 apartments booked. 17% apartments booked.
Work Description in Building Wing B SaleCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress43% done
43% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress91% done
91% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress91% done
91% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress43% done
43% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Trident Ozone Llp
for Project
Fairmont
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation