Project overview

Fairmont is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800024818. Fairmont is located at 112, 112 /1 To 16. This is a New being developed by Trident Ozone Llp.

Fairmont has 1 BHK, FITNESS CENTER, REHAB FLAT, REHAB SHOP & SOCIETY OFFICE Apartments with carpet areas ranging from 191 to 873 Sq.ft. Carpet. The Project has total 212 of which 191 are currently available for sale.

Fairmont is being developed on a total land area of 17578 Sq.ft. out of which 1488 Sq.ft. i.e 8% is reserved for recreational purposes. Fairmont has 2 Wings / Towers Wing A Rehab,Wing B Sale

ProjectDeveloperLocationPossession
Deeplaxmi HeightDeep Laxmi DevelopersS No 159, H No 11 Part31-12-2020 00:00:00
Sini EnterprisesVinod Balnath PatilSurvey No. 1330-12-2023 00:00:00
Vivanta S BlissJai Bhawani Orchid Infra Llp53/5 53/6 310/2 310/3 310/430-06-2022 00:00:00
Ashar Maple BirchMs Ashar RealtorsCts No.18 B Of Village Mulund30-12-2025 00:00:00
Pushpanjali ResidencyShree Dham Developers352 Pt30-12-2023 00:00:00
Sheetal Standard BatteriesSheetal Developers97A 2630-12-2023 00:00:00
Kadri ResidencyKadri Construction122A/1 To 7, 122A30-12-2024 00:00:00
HorizonCrescent SheltersCts No 13330-12-2023 00:00:00
Shivdarshan Phase ISpace Developer575, 35130-10-2020 00:00:00
Ghatkopar Avenue Aaradhya One Earth Phase IMan Realtors And Holdings Private LimitedS No 236 A Part And Cts No 194 A30-03-2025 00:00:00
Saptarshi ClassicRockford Ventures Llp1130-12-2025 00:00:00
FairmontTrident Ozone Llp112, 112 /1 To 1630-12-2026 00:00:00
Eksar Gurukripa Chs LtdWestin Homes Llp2247-B30-06-2023 00:00:00
Durgamata HouseZulfiqar Haider Safdar Sayyed529-530-53130-12-2021 00:00:00
Swastik PearlSuvasya Builders And Developers Llp352 Pt30-12-2024 00:00:00
Gayatri Chsl 8Th 9Th FloorKhushi Associates268/B30-12-2021 00:00:00
Ghatkopar Avenue Aaradhya One Earth Phase IiMan Realtors And Holdings Private LimitedS No 236 A Part And Cts No 194 A30-03-2028 00:00:00
Pratap PalaceJpv Realtors Private LimitedCts No 15/1 To 15/8, Cts No 1530-03-2025 00:00:00
Shree SiddhivinayakSimco Developer5/231-12-2018 00:00:00
Arkade SereneArkade Developers Private Limited33/1430-06-2024 00:00:00
Kush SymphonyKush Buildcon LlpCts No 784 Of Village Mulund West31-12-2023 00:00:00
Redevelopment Of Malad Amber ChslPranav Constructions Limited647/1 To 10, Village Malad North, Cts No. 64730-10-2023 00:00:00
The Sanctuary - Tower 4Runwal Construction Private Limited544 And 544/130-06-2026 00:00:00
Om Residency 1132-A30-06-2023 00:00:00
19 NorthDimple Realtors Private LimitedCts No 692, 721, 719, 711C. Land Area Of This Project Is Inclusive Of Ptc Building And Recreational Open Space, 710, 711B30-06-2025 00:00:00
Urban WaterfrontHarekrushna Developers LlpB906 B/1 Pt, B-1152 Pt30-06-2026 00:00:00
Urban WavesHarekrushna Developers LlpB-906 B/1 Pt, B-1152 Pt30-06-2025 00:00:00
Shraddha ChhayaShraddha Chhaya Developers Llp441-44230-03-2023 00:00:00
66 PalazzioParsh Realty36A/ 164/ 164/1 /164/715-06-2025 00:00:00
Saraswati SadanLakshmi Builders And Developers739 1 To 4, 73901-07-2024 00:00:00
Taxmen Coop Hsg Society LtdRaj BuildersPlot No 11/Cts No 308/6 Of Valnai Village02-04-2024 00:00:00
Jyotika HeightsIcon DevelopersOpp. Mcgm Office, Kandivali - West, M. G. Cross Road No - 02, Mumbai.29-02-2024 00:00:00
Redevelopment Of Borivali Shivdarshan ChslPranav Constructions LimitedNew Final Plot No 719/1130-03-2024 00:00:00
Sheetal Ganga GobindSheetala Developers638701-05-2024 00:00:00
Varshkrushna HeightsKrishna Thale &Amp; Kailash ThaleMumbai Suburban01-06-2024 00:00:00
Shradha ResidencyKonark Shradha RealtorsCts 72, 72/1 To 1030-06-2023 00:00:00
Tulsi Chamber Phase IiSurana Construction (Chembur )38530-06-2024 00:00:00
Pallavi ChhayaAtharva DevelopersBuilding No 5, Chembur Village, Cts No 58 Pt, Mumbai Suburban: 40007130-06-2025 00:00:00
Pant Nagar Saraswati ChslKyraa Infra Projects574030-06-2026 00:00:00
Hari Prasad BuildingNirmitee DevelopersC.T.S. Nos. 2117, 2117 1 To 530-11-2022 00:00:00
Ghatkopar Avenue Aaradhya One Earth E Phase IiMan Realtors And Holdings Private LimitedS No 236 A Part And Cts No 194 A30-09-2025 00:00:00
Ghatkopar Avenue Aaradhya One Earth B Phase IiiMan Realtors And Holdings Private LimitedS No 236A Part And Cts No 194A30-03-2025 00:00:00
Ghatkopar Avenue Aaradhya One Earth F Phase IvMan Realtors And Holdings Pvt LtdS. No 236A Part And Cts No 194A30-09-2025 00:00:00
Ghatkopar Avenue Aaradhya One Earth I Phase VMan Realtors And Holdings Private LimitedS No 236A Part And Cts No 194A30-06-2026 00:00:00
Shreenaths LegacyMehul Kirit Mehta23731-07-2024 00:00:00
Raheja AscencioK Raheja Corp Real Estate Private LimitedMumbai, Taluka Kurla, 119D/1A/1 Of Village Tungwa30-05-2025 00:00:00
Auris Ilaria Tower ATranscon-Sheth Creators Private Limited40006430-10-2027 00:00:00
RajkamalKhushi Associates2114/B/130-06-2025 00:00:00
Pratap GrandeurM/S Jpv RealtorsCts No 34630-06-2025 00:00:00
Goregaon Sukhniwas Co-Operative Housing Society LimitedDilip Doshi349 Part 3491 To 430-06-2024 00:00:00
Tower 28 - C And FShiv Shakti Builders And Developers19/1 To 67, 20 And 20/1 To 121, 1930-06-2025 00:00:00
Jayant VillaYog Life Spaces Llp5179 To 518711-01-2025 00:00:00
Kush SolitaireKush Buildcon LlpCts No 769 Of Village Malad East30-12-2023 00:00:00
Auris Ilaria Tower C Phase I Commercial ShopTranscon-Sheth Creators Private Limited40006430-04-2027 00:00:00
Pranay ApsaraPranay Real Estate Developers2728H-275531-12-2024 00:00:00
Panom Park Wing E Sale Building No.3Panom Developers Llp354Pt28-02-2023 00:00:00
Rishabraj SurajH Rishabraj RealtyPlot No 2231-05-2024 00:00:00
Ghatkopar Avenue Aaradhya One Earth G Phase ViMan Realtors And Holdings Private LimitedS No 236A Part And Cts No 194A30-06-2025 00:00:00
Redevelopment Of Popular Terrace ChslPranav Constructions LimitedFinal Plot No 62030-09-2024 00:00:00
The Sanctuary - Tower 5Runwal Construction Private Limited544 And 544/131-03-2026 00:00:00
KavitaManisha Elite Realty Private Limited568 A/230-05-2024 00:00:00
Borivali Nirmala Sadan Chs LtdShreenath Realty Llp246D30-06-2023 00:00:00
Jai Mata Di-Phase IiiaJagdish Jairam Patil10/231-03-2019 00:00:00
Laxminarayan Sra Chs LtdShree S S Developers Private Limited226 Part 226/1 And 226/20 Part30-12-2025 00:00:00
AnantyaShree Krishna Homes Pvt. Ltd.566230-09-2022 00:00:00
Ganesh ResidencyShree Venkateshwara Developers2725-07-2023 00:00:00
Priya Co-Operative Housing Society Ltd.Arjunsingh Bhoorsingh Rathore521/230-06-2023 00:00:00
Kukreja Gardens Wing BTolaram And CoCts No 465/A 465 A/1 To 20 And 465/B Of Village Bhandup Taluka Kurla S Ward, Mumbai Suburban District Lbs Marg Bhandup West30-04-2026 00:00:00
The Sagar Co-Op. Housing Society Ltd.J.K.Construction Co.Mumbai Suburban31-07-2023 00:00:00
La PrendaD M Lifespaces262, 2661 To 8, 26630-12-2024 00:00:00
IconRaghu Leela Realtors Private Limited37 1 To 85 Of Village Kandivali, 32 Pt, 3731-12-2027 00:00:00
Neelkanth Jyot Chs Ltd.SchemaaticsCts No. 195126, Plot No. 16830-12-2024 00:00:00
Arkade Earth - HazelArkade Developers Private Limited101930-12-2023 00:00:00
Sheetal GrandeurD.G. Land Developers Private Limited7262 6951 Pt Old And 7262 6951 A New01-10-2023 00:00:00
Hs OzoneHs Chetana Enterprises Nx Llp5662 Part30-06-2024 00:00:00
ShrishtiDhruva Mahendra RathodPlot No 358/A Cts No 370E25-12-2024 00:00:00
Lashkaria PearlLashkaria Housing & Infrastructure Private LimitedCts No 325 325/1 32601-11-2025 00:00:00
Project Details
  • Project:
    Fairmont
  • Location:
  • 112, 112 /1 To 16
  • Const. Stage:
    New
  • Possession:
    30 Dec 2026
Developer Details

  • Developer:
    Trident Ozone Llp
  • Phone:
  • Address:
  • Sachdev Complex
Project RERA Details
MAHA REARA No: P51800024818
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank AU SMALL FINANCE BANK LIMITED
Proposed Possession 30 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Jun 2025
Last Retrived 26 Jul 2025
Fairmont QR Code
Fairmont
MahaRERA - P51800024818
Apartment Details & Configuration
TypeArea
1 BHK28.01 Sq.mts. ( 301 Sq.ft. )
1 BHK29.16 Sq.mts. ( 314 Sq.ft. )
Shop12.75 Sq.mts. ( 137 Sq.ft. )
Shop18.58 Sq.mts. ( 200 Sq.ft. )
Shop18.77 Sq.mts. ( 202 Sq.ft. )
Shop19.52 Sq.mts. ( 210 Sq.ft. )
Shop19.94 Sq.mts. ( 215 Sq.ft. )
Shop20.44 Sq.mts. ( 220 Sq.ft. )
Shop20.75 Sq.mts. ( 223 Sq.ft. )
Shop21.06 Sq.mts. ( 227 Sq.ft. )
Shop21.07 Sq.mts. ( 227 Sq.ft. )
Shop21.11 Sq.mts. ( 227 Sq.ft. )
Shop22.33 Sq.mts. ( 240 Sq.ft. )
Shop24.02 Sq.mts. ( 259 Sq.ft. )
Shop26.63 Sq.mts. ( 287 Sq.ft. )
Shop26.74 Sq.mts. ( 288 Sq.ft. )
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )
1 BHK29.7 Sq.mts. ( 320 Sq.ft. )
1 BHK29.83 Sq.mts. ( 321 Sq.ft. )
1 BHK29.93 Sq.mts. ( 322 Sq.ft. )
FITNESS CENTER81.15 Sq.mts. ( 873 Sq.ft. )
REHAB FLAT27.88 Sq.mts. ( 300 Sq.ft. )
SOCIETY OFFICE17.78 Sq.mts. ( 191 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Fairmontlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Developer
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Developer
Energy management
Na
Fire Protection And Fire Safety Requirements
Developer
Landscaping & Tree Planting
Na
Open Parking
Na
PUMP ROOM
Developer
Sewerage (Chamber, Lines, Septic Tank , STP)
Mcgm
Solid Waste Management And Disposal
Na
Storm Water Drains
Developer
Street Lighting
Mcgm
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Developers
Water Supply
Mcgm
Buildings / Wings in Fairmont
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Fairmont by Trident Ozone Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

17578 Sq. ft.

Project Area

1488 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

212 apartments in total
Total
212
Booked
21
Available
191

Saleable Area Statistics (Sq. ft.)

65511 Total
Total
65511
Booked
6721
Available
58790
Total 212 apartments in project. 21 apartments booked. 9% apartments booked.
Total 65511 Sq.ft. saleable area. 6721 saleable area booked.
10% area booked.

Wing A Rehab

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A RehabDec 2025231010021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.01 Sq.mts. ( 301 Sq.ft. )73
None Booked0% Booked
0% Booked
1 BHK29.16 Sq.mts. ( 314 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop12.75 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.58 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.77 Sq.mts. ( 202 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.52 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.94 Sq.mts. ( 215 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.44 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.75 Sq.mts. ( 223 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.06 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.07 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.11 Sq.mts. ( 227 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.33 Sq.mts. ( 240 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.02 Sq.mts. ( 259 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.63 Sq.mts. ( 287 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.74 Sq.mts. ( 288 Sq.ft. )1
None Booked0% Booked
0% Booked
91 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A RehabCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress86% done
86% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress78% done
78% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress91% done
91% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress91% done
91% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress86% done
86% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B Sale

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B SaleDec 2025231010023
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )19
4 Booked21% Booked
21% Booked
1 BHK29.7 Sq.mts. ( 320 Sq.ft. )58
12 Booked20% Booked
20% Booked
1 BHK29.83 Sq.mts. ( 321 Sq.ft. )20
1 BHK29.93 Sq.mts. ( 322 Sq.ft. )20
4 Booked20% Booked
20% Booked
FITNESS CENTER81.15 Sq.mts. ( 873 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB FLAT27.88 Sq.mts. ( 300 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB SHOP24.02 Sq.mts. ( 259 Sq.ft. )1
None Booked0% Booked
0% Booked
SOCIETY OFFICE17.78 Sq.mts. ( 191 Sq.ft. )1
None Booked0% Booked
0% Booked
121 total apartments / 21 apartments booked. 17% apartments booked.
Work Description in Building Wing B SaleCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress43% done
43% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress91% done
91% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress91% done
91% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress43% done
43% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Trident Ozone Llp
for Project
Fairmont
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation