Project overview
Excellence Residency 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000020176. Excellence Residency 1 is located at Palghar. This is a New Project being developed by Sai Shraddha Developers.
Excellence Residency 1 has BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 178 to 426 Sq.ft. Carpet. The Project has total 90 of which 90 are currently available for sale.
Excellence Residency 1 is being developed on a total land area of 33771 Sq.ft. out of which 7769 Sq.ft. i.e 23% is reserved for recreational purposes. Excellence Residency 1 has 3 Wings / Towers Building No 18 Wing A,Building No 18 Wing B,Building No 18 Wing C
| Project | Developer | Location | Possession |
-
Project:
Excellence Residency 1
-
Location:
-
Palghar
-
Const. Stage:
New Project
-
Possession:
30 Dec 2023
-
Developer:
Sai Shraddha Developers
-
Phone:
-
Address:
-
505, Shakti Co Op Hsg Soc, Bolinj Road, -, Virar West, 401303
| MAHA REARA No: |
P99000020176 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
30 Dec 2023 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
20 Mar 2020 |
| Last Retrived |
28 Jul 2025 |
Excellence Residency 1 QR Code
Excellence Residency 1
MahaRERA - P99000020176
| Type | Area |
| 1 BHK | 25.32 Sq.mts. ( 273 Sq.ft. ) |
| 1 BHK | 28.32 Sq.mts. ( 305 Sq.ft. ) |
| 1 BHK | 28.52 Sq.mts. ( 307 Sq.ft. ) |
| 1RK | 16.42 Sq.mts. ( 177 Sq.ft. ) |
| 1RK | 16.56 Sq.mts. ( 178 Sq.ft. ) |
| 2 BHK | 39.57 Sq.mts. ( 426 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Excellence Residency 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Not Started Yet |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Na |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Not Started Yet |
Solid Waste Management And Disposal
|
|
Not Started Yet |
|
|
|
Not Started Yet |
|
|
|
Not Started Yet |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Not Started Yet |
Water Conservation, Rain water Harvesting
|
|
Not Started Yet |
|
|
|
Bore Well |
Buildings / Wings in Excellence Residency 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Excellence Residency 1 by Sai Shraddha Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
90
apartments in total
Saleable Area Statistics (Sq. ft.)
25240
Total
Total 90 apartments in project. 0 apartments booked. 0% apartments booked.
Total 25240 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 18 Wing A | Dec 2022 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 25.32 Sq.mts. ( 273 Sq.ft. ) | 9 | |
| 1 BHK | 28.32 Sq.mts. ( 305 Sq.ft. ) | 1 | |
| 1 BHK | 28.52 Sq.mts. ( 307 Sq.ft. ) | 4 | |
| 1RK | 16.42 Sq.mts. ( 177 Sq.ft. ) | 10 | |
| 1RK | 16.56 Sq.mts. ( 178 Sq.ft. ) | 1 | |
| 2 BHK | 39.57 Sq.mts. ( 426 Sq.ft. ) | 5 | |
30 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 18 Wing A | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 18 Wing B | Dec 2022 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 25.32 Sq.mts. ( 273 Sq.ft. ) | 10 | |
| 1 BHK | 28.52 Sq.mts. ( 307 Sq.ft. ) | 5 | |
| 1RK | 16.42 Sq.mts. ( 177 Sq.ft. ) | 10 | |
| 2 BHK | 39.57 Sq.mts. ( 426 Sq.ft. ) | 5 | |
30 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 18 Wing B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 18 Wing C | Dec 2022 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| BHK | 25.32 Sq.mts. ( 273 Sq.ft. ) | 19 | |
| BHK | 28.52 Sq.mts. ( 307 Sq.ft. ) | 5 | |
| 1RK | 16.56 Sq.mts. ( 178 Sq.ft. ) | 1 | |
| 2 BHK | 39.57 Sq.mts. ( 426 Sq.ft. ) | 5 | |
30 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 18 Wing C | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Sai Shraddha Developers
for Project
Excellence Residency 1
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |