Project overview

Elite Solitaire 15 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700006610. Elite Solitaire 15 is located at Part Of Survey No 37-13. This is a Ongoing being developed by Vijay Associates (Wadhwa).

Elite Solitaire 15 has 2 BHK & 2 BHKWithStudy Apartments with carpet areas ranging from 590 to 833 Sq.ft. Carpet. The Project has total 132 of which 33 are currently available for sale.

Elite Solitaire 15 is being developed on a total land area of 6994 Sq.ft. Elite Solitaire 15 has 1 Wings / Towers Elite Solitaire 15

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Elite Solitaire 15
  • Location:
  • Part Of Survey No 37-13
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Vijay Associates (Wadhwa)
  • Phone:
  • Address:
  • Platina
Project RERA Details
MAHA REARA No: P51700006610
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Saakar Architects
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 24 Dec 2020
Last Retrived 26 Jul 2025
Elite Solitaire 15 QR Code
Elite Solitaire 15
MahaRERA - P51700006610
Apartment Details & Configuration
TypeArea
2 BHK54.82 Sq.mts. ( 590 Sq.ft. )
2 BHK55.91 Sq.mts. ( 602 Sq.ft. )
2 BHK64.12 Sq.mts. ( 690 Sq.ft. )
2 BHK65.58 Sq.mts. ( 706 Sq.ft. )
2 BHKWithStudy73.86 Sq.mts. ( 795 Sq.ft. )
2 BHKWithStudy77.38 Sq.mts. ( 833 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Elite Solitaire 15last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station33% completed
33% Complete
Substation/Trasnformer
Energy management33% completed
33% Complete
Solar Water Heater To Be Installed Before Oc
Fire Protection And Fire Safety Requirements33% completed
33% Complete
As Per Cfo Noc
Landscaping & Tree Planting33% completed
33% Complete
On Ground
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Chamber Lines Will Be Connected To Existing Stp
Solid Waste Management And Disposal
Organic Waste Composter
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water90% completed
90% Complete
Treated Water Will Be Used For Flushing &Amp; Gardenin
Water Conservation, Rain water Harvesting33% completed
33% Complete
Rain Water Harvesting To Be Completed Before Oc
Water Supply50% completed
50% Complete
Connection After Oc
Buildings / Wings in Elite Solitaire 15
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Elite Solitaire 15 by Vijay Associates (Wadhwa)last updated on 26 Jul 2025 as per information obtained from MARA RERA.

6994 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

132 apartments in total
Total
132
Booked
99
Available
33

Saleable Area Statistics (Sq. ft.)

93414 Total
Total
93414
Booked
68083
Available
25331
Total 132 apartments in project. 99 apartments booked. 75% apartments booked.
Total 93414 Sq.ft. saleable area. 68083 saleable area booked.
73% area booked.

Elite Solitaire 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Elite Solitaire 15Dec 202024101029104
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.82 Sq.mts. ( 590 Sq.ft. )18
17 Booked94% Booked
94% Booked
2 BHK55.91 Sq.mts. ( 602 Sq.ft. )22
21 Booked95% Booked
95% Booked
2 BHK64.12 Sq.mts. ( 690 Sq.ft. )23
17 Booked73% Booked
73% Booked
2 BHK65.58 Sq.mts. ( 706 Sq.ft. )23
18 Booked78% Booked
78% Booked
2 BHKWithStudy73.86 Sq.mts. ( 795 Sq.ft. )23
18 Booked78% Booked
78% Booked
2 BHKWithStudy77.38 Sq.mts. ( 833 Sq.ft. )23
8 Booked34% Booked
34% Booked
132 total apartments / 99 apartments booked. 75% apartments booked.
Work Description in Building Elite Solitaire 15Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vijay Associates (Wadhwa)
for Project
Elite Solitaire 15
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation