Project overview

Ekta Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800012424. Ekta Residency is located at Plot No 79 Cts 14 Pt Village Chembur And Cts 508 Pt Village Kirol. This is a Ongoing being developed by Ashok Hazarimal Tharwani.

Ekta Residency has RESIDENTIAL & SHOP Apartments with carpet areas ranging from 194 to 1040 Sq.ft. Carpet. The Project has total 117 of which 3 are currently available for sale.

Ekta Residency is being developed on a total land area of 23074 Sq.ft. out of which 9813 Sq.ft. i.e 43% is reserved for recreational purposes. Ekta Residency has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ekta Residency
  • Location:
  • Plot No 79 Cts 14 Pt Village Chembur And Cts 508 Pt Village Kirol
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Ashok Hazarimal Tharwani
  • Phone:
  • Address:
  • Hazarivilla
Project RERA Details
MAHA REARA No: P51800012424
Project Type Others
RERA Project Status Ongoing
Architect Architect Collaboration
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 01 Sep 2017
Last Retrived 26 Jul 2025
Ekta Residency QR Code
Ekta Residency
MahaRERA - P51800012424
Apartment Details & Configuration
TypeArea
RESIDENTIAL30 Sq.mts. ( 323 Sq.ft. )
RESIDENTIAL65.24 Sq.mts. ( 702 Sq.ft. )
RESIDENTIAL68.64 Sq.mts. ( 739 Sq.ft. )
RESIDENTIAL74.26 Sq.mts. ( 799 Sq.ft. )
RESIDENTIAL78.8 Sq.mts. ( 848 Sq.ft. )
RESIDENTIAL96.66 Sq.mts. ( 1040 Sq.ft. )
SHOP18 Sq.mts. ( 194 Sq.ft. )
SHOP24.55 Sq.mts. ( 264 Sq.ft. )
SHOP26.56 Sq.mts. ( 286 Sq.ft. )
SHOP31.76 Sq.mts. ( 342 Sq.ft. )
SHOP38.19 Sq.mts. ( 411 Sq.ft. )
SHOP63 Sq.mts. ( 678 Sq.ft. )
SHOP63.28 Sq.mts. ( 681 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ekta Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Mhada Layout Rg
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Reliance Energy Issued Sub Station Noc
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Cfo Noc Are Completed On Side
Landscaping & Tree Planting50% completed
50% Complete
Tree Noc Is Obtained
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Drains Are Laid On Site.
Solid Waste Management And Disposal100% completed
95% Complete
The Debric Noc From Dept Obtained
Storm Water Drains50% completed
50% Complete
Completed On Site
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
No Treatment
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Mcgm Connection Has Been Received
Buildings / Wings in Ekta Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ekta Residency by Ashok Hazarimal Tharwanilast updated on 26 Jul 2025 as per information obtained from MARA RERA.

23074 Sq. ft.

Project Area

9813 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

117 apartments in total
Total
117
Booked
114
Available
3

Saleable Area Statistics (Sq. ft.)

70329 Total
Total
70329
Booked
68626
Available
1703
Total 117 apartments in project. 114 apartments booked. 97% apartments booked.
Total 70329 Sq.ft. saleable area. 68626 saleable area booked.
98% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJan 1900131010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL30 Sq.mts. ( 323 Sq.ft. )47
47 Booked100% Booked
100% Booked
47 total apartments / 47 apartments booked. 100% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJan 1900171010030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL65.24 Sq.mts. ( 702 Sq.ft. )16
16 Booked100% Booked
100% Booked
RESIDENTIAL68.64 Sq.mts. ( 739 Sq.ft. )15
14 Booked93% Booked
93% Booked
RESIDENTIAL74.26 Sq.mts. ( 799 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL78.8 Sq.mts. ( 848 Sq.ft. )16
16 Booked100% Booked
100% Booked
RESIDENTIAL96.66 Sq.mts. ( 1040 Sq.ft. )15
15 Booked100% Booked
100% Booked
SHOP18 Sq.mts. ( 194 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP24.55 Sq.mts. ( 264 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP26.56 Sq.mts. ( 286 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP31.76 Sq.mts. ( 342 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP38.19 Sq.mts. ( 411 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP63 Sq.mts. ( 678 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP63.28 Sq.mts. ( 681 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 67 apartments booked. 95% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress85% done
85% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
Ashok Hazarimal Tharwani
for Project
Ekta Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation