Project overview

Eden is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800027245. Eden is located at 97. This is a New being developed by Sambhavparshva Developers Pvt. Ltd..

Eden has 2 BHK, 3 BHK & Add. Tenant Area Apartments with carpet areas ranging from 2 to 1003 Sq.ft. Carpet. The Project has total 32 of which 1 are currently available for sale.

Eden is being developed on a total land area of 8100 Sq.ft. Eden has 1 Wings / Towers Eden

ProjectDeveloperLocationPossession
Neumec NiwaraNeumec Venture419Pt 419/1 To 4 And 426Pt 426/1430-03-2020 00:00:00
Shukratara ChslHariom Developers34-A31-10-2019 00:00:00
Zee ShaanTrisul Developers579 B30-12-2024 00:00:00
Vile Parle Kalpavriksha Cooperative Housing Society LimitedRelcon Infraprojects Ltd299, 29831-03-2018 00:00:00
Madhu Vasant Chs Ltd.Amal Realtors Private Limited738 A30-12-2023 00:00:00
Harshail Dhanuka ResidencyHarshmaan Construction1338, 1338/1 To 530-04-2018 00:00:00
Marvel PrideMarvellous Builders Private LimitedC.T.S No.181330-09-2020 00:00:00
Ramchandra NiwasShree Tirupati DevelopersPlot No.189, Cts No. 1416, Survey No. 100030-12-2021 00:00:00
Zee NayakPragatee Zee400057, Mumbai Suburban31-12-2020 00:00:00
Kakad ImperialNiraj Kakad Builders LlpCts No F/35 Final Plot No 594/A31-12-2019 00:00:00
Sudarsan Chs LtdRegent Spaces88831-03-2019 00:00:00
PrathamVardhman EnterprisesFinal Plot No 58 Of Tps No Ii31-12-2017 00:00:00
Redevelopment Of Vishva Anand Chs LtdR R ConstructionsFp No 102 Of Tps I At Vile Parle East31-12-2019 00:00:00
Sheela Smruti ChslBlack Gold Developers Pvt Ltd507, 507/1 And 507/204-05-2020 00:00:00
Aniket Chs LtdR. R. Infraventures Private LimitedCts No.834-835 F.P.58-5931-12-2019 00:00:00
Amardeep Mahal Chs LtdNitin Harshadrai Maniar1667/1 To 8, 1669, 167031-12-2019 00:00:00
Datta Ramanand Chs LtdDisha Construction717 /1 To 51, 71731-12-2019 00:00:00
Swarup NiketanSun-Vision Estates LtdPlot No. 49 Cts No. 146/1328-02-2019 00:00:00
Yoga Yog Chs - CrestHariom Sayaji Properties LlpF.P 197/201 Tps 2, Fp 253 Tps 505-05-2022 00:00:00
Niramaya Chs LtdShamik Enterprises Pvt Ltd.Cts No. 1798 Part / Final Plot No. 328 And 32930-06-2018 00:00:00
Sun-Vison SolitaireDhan International Pvt LtdFinal Plot No. 47, Cts Nos. 903 A And B31-03-2018 00:00:00
Forefront PrimeriaForefront Private LimitedFinal Plot No.291, Cts No. 157030-06-2021 00:00:00
Kavya ResidencyPragati Infrasquare Llp40131-12-2019 00:00:00
Sangita Aspire - Sale Portion And Ratilal Thakarshi Sra Chs Ltd - Rehab PortionSangita Realty25031-12-2017 00:00:00
Parleshwar AanganPanom Developers Llp332/1 To 42, 354 (Pt), 364/1 To 12, 366, 354/17, 366/1 To 15, 333 (Pt), 2095/1 To 10, 365/1 To 6, 360 (Pt) 364, 369/1 To 18 And 2095, 368/1 To 10, Cst No 331, 332, 365, 369, 36731-12-2025 00:00:00
NavratnaOm Navratna Enterprises Llp3331-03-2026 00:00:00
Medinee Chs LtdShamik Enterprises Pvt Ltd.Cts No. 1167, 1167/1 To 3 Part/ Final Plot No. 28531-12-2017 00:00:00
Paresh KunjSun-Vision Estates LtdCts No 146/5, Plot No 6630-04-2019 00:00:00
Vile Parle Shiv Swami Kripa Cooperative Housing Society LimitedRelcon Infraprojects Ltd5081 To 5, 50831-12-2019 00:00:00
Audumbar Chs LtdRegent BuildersCts No 128130-03-2022 00:00:00
New Deepali Co-Op. Housing Society Ltd.Akme PropertiesMumbai Suburban30-12-2022 00:00:00
Medinee NiketanSs EnterpriseBamanwada30-12-2021 00:00:00
Vaidya Cottage Chs LtdShamik Enterprises Pvt Ltd.Cts No. 1250, 1250/1 To 6 / Final Plot No. 24929-06-2020 00:00:00
Amrut ElleganceAmrut Enterprises1743/2, 1743/130-06-2019 00:00:00
Sudhanshu Chs LtdHariom Developers22431-10-2018 00:00:00
My ResidencyHitesh Indravadan PatelCts 162131-12-2019 00:00:00
Shree Madhusudan ChslSpark Builders & Infra Projects Pvt Ltd1165B31-12-2017 00:00:00
Neel Gagan Sra Chs LtdR G CorporationPlot 373374 Cts No 186330-12-2024 00:00:00
RoshniAspy CaptainMumbai Suburban, 40005730-10-2018 00:00:00
SamkitJitendra Kantilal Shah104631-07-2023 00:00:00
East EdenPrima Terra Landmark Pvt LtdCts No-66331-12-2019 00:00:00
Kalpawriksha Cooperative Housing Society Limited Relcon Realty Private Limited604 And 606 Now Amalgamated As 60431-12-2018 00:00:00
Trinity SquareP &Amp; K Plinth Pvt. Ltd.Mumbai Suburban, 40005731-01-2019 00:00:00
Ganga Niwas Chs Ltd.Konark Infra24031-12-2029 00:00:00
Prabhu KrupaMehul Kirit Mehta27531-12-2027 00:00:00
Nirmaan HeenaM/S. Ramkripa Enterprises12709-12-2025 00:00:00
Om ParasOm Arch Realty Llp8520-04-2027 00:00:00
Kumbh BuildingShreeji Associates34330-12-2021 00:00:00
Universal Paradise D WingPagarani Universal Infrastructure Pvt Ltd400057, Mumbai Suburban31-12-2016 00:00:00
Universal Paradise A And BPagarani Universal Infrastructure Pvt LtdE, 188-A, H And I, B, G31-12-2018 00:00:00
Parle Nimesh Co-Op. Hsg. Soc. Ltd.Chintamani Commercial Ventures1084/1 To 2, 1085, Cts No. 108430-09-2024 00:00:00
The Vile Parle Meghalaya ChslDhruv Infrastructure1550, 1551, 154931-08-2024 00:00:00
Om Madhusadan Chs LtdRegent BuildersCts No 1166 1166/131-03-2025 00:00:00
Hirani VillaAmi Infra Projects Private Limited1663B/1-430-03-2023 00:00:00
Deepa Chs LtdRegent SpacesFinal Plot No 148 Of Tps V28-02-2025 00:00:00
Shri Audumbar Niwas ChslRakkhyan Construction LlpF P No 28730-06-2024 00:00:00
Suparshwa TrinitySuparshwa Developers238, 238A, 25031-12-2026 00:00:00
Vileparle Trimbak Sadan Chs LtdNivara Infradevelopers Llp10631-12-2025 00:00:00
Vaastu OmkarVaastu Creations Pvt. Ltd.110 ,10930-09-2027 00:00:00
Santoor ResidencySpade Realtors Llp1663A/ 1 F P Nos 342, 343 Pt, 1663A31-03-2018 00:00:00
Sairah Metro Associates724/12 Of Village Vile Parle East30-06-2019 00:00:00
Sun-Vision Heritage-SwatiS.S.Primespace Pvt. Ltd.Fp No 276, Cts No. 1155, 1155/1 To 331-12-2018 00:00:00
Saket Residency Co Op Hsg Soc LtdRegent BuildersCts No 620 620/1 To 231-03-2018 00:00:00
Grace Iconic Wing A-BGrace Property Development Ventures1780, F.P. No. 359, 1781/1-731-10-2019 00:00:00
Zee ChahyaZee Infra Projects Private Limited101130-09-2020 00:00:00
Zee SwastikZee Rpm Builders And Developers Llp165330-12-2021 00:00:00
Gem PlazaGem Path Developers48630-06-2018 00:00:00
Jalmeena ChsNivara Infraabuild India Pvt LtdMumbai Suburban, 40005724-03-2017 00:00:00
Redevelopment Of Sbi Employees Kanchan Mrig Chs Ltd.R R Constructions225A30-04-2018 00:00:00
Sanniwas Premises Co-Operative Society Ltd.Pruthvi Enclave LlpFinal Plot No. 60 61 T.P.S. Ii Vile Parle East30-06-2018 00:00:00
Madhu Madhura ChslVijayraj Developers1107-08-2019 00:00:00
RoyaleMangal Buildhome Private Limited1530 1 To 12 Of Final Plot No 174 Of Tps Ii, 1529, 1529 1 To 5 & 153031-05-2025 00:00:00
Pruthvi Park ViewPruthvi Enterprise24630-09-2025 00:00:00
Krishna BhuvanAshraj Developers Private Limited12230-06-2027 00:00:00
Project Details
  • Project:
    Eden
  • Location:
  • 97
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    Sambhavparshva Developers Pvt. Ltd.
  • Phone:
  • Address:
  • Lodha Supremus
Project RERA Details
MAHA REARA No: P51800027245
Project Type Others
RERA Project Status New
Architect Hm Jhaveri & Sons
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Nov 2020
Last Retrived 26 Jul 2025
Eden QR Code
Eden
MahaRERA - P51800027245
Apartment Details & Configuration
TypeArea
2 BHK70.45 Sq.mts. ( 758 Sq.ft. )
2 BHK71.19 Sq.mts. ( 766 Sq.ft. )
2 BHK74.04 Sq.mts. ( 797 Sq.ft. )
3 BHK93.18 Sq.mts. ( 1003 Sq.ft. )
3 BHK93.21 Sq.mts. ( 1003 Sq.ft. )
Add. Tenant Area0.19 Sq.mts. ( 2 Sq.ft. )
Add. Tenant Area0.37 Sq.mts. ( 4 Sq.ft. )
Add. Tenant Area0.6 Sq.mts. ( 6 Sq.ft. )
Add. Tenant Area0.84 Sq.mts. ( 9 Sq.ft. )
Add. Tenant Area0.93 Sq.mts. ( 10 Sq.ft. )
Add. Tenant Area1.11 Sq.mts. ( 12 Sq.ft. )
Add. Tenant Area1.3 Sq.mts. ( 14 Sq.ft. )
Add. Tenant Area1.58 Sq.mts. ( 17 Sq.ft. )
Add. Tenant Area1.95 Sq.mts. ( 21 Sq.ft. )
Add. Tenant Area2.42 Sq.mts. ( 26 Sq.ft. )
Add. Tenant Area3.44 Sq.mts. ( 37 Sq.ft. )
Add. Tenant Area3.53 Sq.mts. ( 38 Sq.ft. )
Add. Tenant Area3.72 Sq.mts. ( 40 Sq.ft. )
Add. Tenant Area3.81 Sq.mts. ( 41 Sq.ft. )
Add. Tenant Area3.9 Sq.mts. ( 42 Sq.ft. )
Add. Tenant Area5.2 Sq.mts. ( 56 Sq.ft. )
Add. Tenant Area5.57 Sq.mts. ( 60 Sq.ft. )
Add. Tenant Area7.25 Sq.mts. ( 78 Sq.ft. )
Add. Tenant Area11.61 Sq.mts. ( 125 Sq.ft. )
Add. Tenant Area18.21 Sq.mts. ( 196 Sq.ft. )
Add. Tenant Area18.86 Sq.mts. ( 203 Sq.ft. )
Add. Tenant Area22.11 Sq.mts. ( 238 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Edenlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Eden
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Eden by Sambhavparshva Developers Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

8100 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

32 apartments in total
Total
32
Booked
31
Available
1

Saleable Area Statistics (Sq. ft.)

7220 Total
Total
7220
Booked
6423
Available
797
Total 32 apartments in project. 31 apartments booked. 96% apartments booked.
Total 7220 Sq.ft. saleable area. 6423 saleable area booked.
89% area booked.

Eden

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
EdenDec 20249111101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.45 Sq.mts. ( 758 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK71.19 Sq.mts. ( 766 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK74.04 Sq.mts. ( 797 Sq.ft. )3
2 Booked66% Booked
66% Booked
3 BHK93.18 Sq.mts. ( 1003 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK93.21 Sq.mts. ( 1003 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area0.19 Sq.mts. ( 2 Sq.ft. )2
2 Booked100% Booked
100% Booked
Add. Tenant Area0.37 Sq.mts. ( 4 Sq.ft. )2
2 Booked100% Booked
100% Booked
Add. Tenant Area0.6 Sq.mts. ( 6 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area0.84 Sq.mts. ( 9 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area0.93 Sq.mts. ( 10 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area1.11 Sq.mts. ( 12 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area1.3 Sq.mts. ( 14 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area1.58 Sq.mts. ( 17 Sq.ft. )2
2 Booked100% Booked
100% Booked
Add. Tenant Area1.95 Sq.mts. ( 21 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area2.42 Sq.mts. ( 26 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area3.44 Sq.mts. ( 37 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area3.53 Sq.mts. ( 38 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area3.72 Sq.mts. ( 40 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area3.81 Sq.mts. ( 41 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area3.9 Sq.mts. ( 42 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area5.2 Sq.mts. ( 56 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area5.57 Sq.mts. ( 60 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area7.25 Sq.mts. ( 78 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area11.61 Sq.mts. ( 125 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area18.21 Sq.mts. ( 196 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area18.86 Sq.mts. ( 203 Sq.ft. )1
1 Booked100% Booked
100% Booked
Add. Tenant Area22.11 Sq.mts. ( 238 Sq.ft. )1
1 Booked100% Booked
100% Booked
32 total apartments / 31 apartments booked. 96% apartments booked.
Work Description in Building EdenCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sambhavparshva Developers Pvt. Ltd.
for Project
Eden
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation