Project overview

Eastern Groves Phase 1A is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028005. Eastern Groves Phase 1A is located at 400083. This is a New Project being developed by Vl Savli Developers Llp.

Eastern Groves Phase 1A has 1 BHK, 2 BHK, 3 BHK & Shop Apartments with carpet areas ranging from 172 to 698 Sq.ft. Carpet. The Project has total 189 of which 29 are currently available for sale.

Eastern Groves Phase 1A is being developed on a total land area of 47913 Sq.ft. Eastern Groves Phase 1A has 2 Wings / Towers Wing E,Wing F

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Eastern Groves Phase 1A
  • Location:
  • 400083
  • Const. Stage:
    New Project
  • Possession:
    30 Jun 2027
Developer Details

  • Developer:
    Vl Savli Developers Llp
  • Phone:
  • Address:
  • Shop No 2, Stella Residency, Kannamwar Nagar 1, Axis Bank, Vikhroli, 400083
Project RERA Details
MAHA REARA No: P51800028005
Project Type Others
RERA Project Status New Project
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Feb 2024
Last Retrived 28 Jul 2025
Eastern Groves Phase 1A QR Code
Eastern Groves Phase 1A
MahaRERA - P51800028005
Apartment Details & Configuration
TypeArea
1 BHK36.98 Sq.mts. ( 398 Sq.ft. )
1RK27.68 Sq.mts. ( 298 Sq.ft. )
2 BHK46.82 Sq.mts. ( 504 Sq.ft. )
Office space114.55 Sq.mts. ( 1233 Sq.ft. )
Shop13.93 Sq.mts. ( 150 Sq.ft. )
Shop16.07 Sq.mts. ( 173 Sq.ft. )
Shop17.65 Sq.mts. ( 190 Sq.ft. )
Shop25.82 Sq.mts. ( 278 Sq.ft. )
1 BHK39.86 Sq.mts. ( 429 Sq.ft. )
2 BHK51.94 Sq.mts. ( 559 Sq.ft. )
2 BHK53.79 Sq.mts. ( 579 Sq.ft. )
3 BHK64.84 Sq.mts. ( 698 Sq.ft. )
Shop15.98 Sq.mts. ( 172 Sq.ft. )
Shop21.83 Sq.mts. ( 235 Sq.ft. )
Shop28.52 Sq.mts. ( 307 Sq.ft. )
Shop32.32 Sq.mts. ( 348 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Eastern Groves Phase 1Alast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Wip
Water Conservation, Rain water Harvesting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Na
Storm Water Drains
Wip
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Open Parking
Na
Landscaping & Tree Planting
Wip
Fire Protection And Fire Safety Requirements
Wip
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Eastern Groves Phase 1A
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Eastern Groves Phase 1A by Vl Savli Developers Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

47913 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

189 apartments in total
Total
189
Booked
160
Available
29

Saleable Area Statistics (Sq. ft.)

92542 Total
Total
92542
Booked
80728
Available
11814
Total 189 apartments in project. 160 apartments booked. 84% apartments booked.
Total 92542 Sq.ft. saleable area. 80728 saleable area booked.
87% area booked.

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EDec 2026241010020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.98 Sq.mts. ( 398 Sq.ft. )65
57 Booked87% Booked
87% Booked
1RK27.68 Sq.mts. ( 298 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK46.82 Sq.mts. ( 504 Sq.ft. )22
15 Booked68% Booked
68% Booked
Office space114.55 Sq.mts. ( 1233 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.93 Sq.mts. ( 150 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop16.07 Sq.mts. ( 173 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.65 Sq.mts. ( 190 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.82 Sq.mts. ( 278 Sq.ft. )1
None Booked0% Booked
0% Booked
94 total apartments / 72 apartments booked. 76% apartments booked.
Work Description in Building Wing ECompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing FDec 2026241010042
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.86 Sq.mts. ( 429 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.94 Sq.mts. ( 559 Sq.ft. )58
58 Booked100% Booked
100% Booked
2 BHK53.79 Sq.mts. ( 579 Sq.ft. )22
22 Booked100% Booked
100% Booked
3 BHK64.84 Sq.mts. ( 698 Sq.ft. )9
7 Booked77% Booked
77% Booked
Shop15.98 Sq.mts. ( 172 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop21.83 Sq.mts. ( 235 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.52 Sq.mts. ( 307 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32.32 Sq.mts. ( 348 Sq.ft. )1
None Booked0% Booked
0% Booked
95 total apartments / 88 apartments booked. 92% apartments booked.
Work Description in Building Wing FCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Vl Savli Developers Llp
for Project
Eastern Groves Phase 1A
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation