Project overview

Dwarkadhish Nagar is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000045481. Dwarkadhish Nagar is located at Gat Number 159/2, Village Man. This is a New being developed by Shree Geetanjali Builders.

Dwarkadhish Nagar has Bungalow Apartments with carpet areas ranging from 1065 to 1065 Sq.ft. Carpet. The Project has total 256 of which 218 are currently available for sale.

Dwarkadhish Nagar is being developed on a total land area of 173300 Sq.ft. out of which 14814 Sq.ft. i.e 9% is reserved for recreational purposes. Dwarkadhish Nagar has 6 Wings / Towers Building No 1,Building No 2,Building No 3,Building No 4,Building No 5,Building No 7

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Dwarkadhish Nagar
  • Location:
  • Gat Number 159/2, Village Man
  • Const. Stage:
    New
  • Possession:
    31 Mar 2028
Developer Details

  • Developer:
    Shree Geetanjali Builders
  • Phone:
  • Address:
  • Geetanjali
Project RERA Details
MAHA REARA No: P99000045481
Project Type Others
RERA Project Status New
Architect Skyline Pouraj Kore
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 31 Mar 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Jul 2024
Last Retrived 28 Jul 2025
Dwarkadhish Nagar QR Code
Dwarkadhish Nagar
MahaRERA - P99000045481
Apartment Details & Configuration
TypeArea
1 BHK50.04 Sq.mts. ( 539 Sq.ft. )
2 BHK59.45 Sq.mts. ( 640 Sq.ft. )
2 BHK59.65 Sq.mts. ( 642 Sq.ft. )
2 BHK61.57 Sq.mts. ( 663 Sq.ft. )
3 BHK78.35 Sq.mts. ( 843 Sq.ft. )
3 BHK87.25 Sq.mts. ( 939 Sq.ft. )
3 BHK88.06 Sq.mts. ( 948 Sq.ft. )
Office space16.71 Sq.mts. ( 180 Sq.ft. )
Office space24.85 Sq.mts. ( 267 Sq.ft. )
Office space25.67 Sq.mts. ( 276 Sq.ft. )
Office space27.52 Sq.mts. ( 296 Sq.ft. )
Office space28.61 Sq.mts. ( 308 Sq.ft. )
Office space38.83 Sq.mts. ( 418 Sq.ft. )
Office space39.23 Sq.mts. ( 422 Sq.ft. )
Shop28.92 Sq.mts. ( 311 Sq.ft. )
Shop30.54 Sq.mts. ( 329 Sq.ft. )
Shop27.85 Sq.mts. ( 300 Sq.ft. )
Shop28.03 Sq.mts. ( 302 Sq.ft. )
Shop21.87 Sq.mts. ( 235 Sq.ft. )
1 BHK46.69 Sq.mts. ( 503 Sq.ft. )
2 BHK59.48 Sq.mts. ( 640 Sq.ft. )
2 BHK61.48 Sq.mts. ( 662 Sq.ft. )
3 BHK83.9 Sq.mts. ( 903 Sq.ft. )
Office space22.48 Sq.mts. ( 242 Sq.ft. )
Shop33.31 Sq.mts. ( 359 Sq.ft. )
Shop36.01 Sq.mts. ( 388 Sq.ft. )
Shop26.31 Sq.mts. ( 283 Sq.ft. )
Shop24.91 Sq.mts. ( 268 Sq.ft. )
Shop25.41 Sq.mts. ( 274 Sq.ft. )
Shop15.37 Sq.mts. ( 165 Sq.ft. )
Shop17.95 Sq.mts. ( 193 Sq.ft. )
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )
1 BHK39.06 Sq.mts. ( 420 Sq.ft. )
Shop12.2 Sq.mts. ( 131 Sq.ft. )
Shop14.96 Sq.mts. ( 161 Sq.ft. )
Shop16.38 Sq.mts. ( 176 Sq.ft. )
Shop19.45 Sq.mts. ( 209 Sq.ft. )
Bungalow98.91 Sq.mts. ( 1065 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dwarkadhish Nagarlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Open Space
Community Buildings
Club House To Be Provided
Electrical Meter Room, Sub-Station, Receiving Station
Only Electric Meter Room To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Along The Road And Pathway
Open Parking
Open Space
Sewerage (Chamber, Lines, Septic Tank , STP)
Sewearge Chamber Lines To Be Provided
Solid Waste Management And Disposal
To Be Provided
Storm Water Drains
Storm Water Drains To Be Provided
Street Lighting
Along The Road And Pathway
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harwesting Pit With Borewell
Water Supply
Borewell To Be Provided
Buildings / Wings in Dwarkadhish Nagar
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dwarkadhish Nagar by Shree Geetanjali Builderslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

173300 Sq. ft.

Project Area

14814 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

256 apartments in total
Total
256
Booked
38
Available
218

Saleable Area Statistics (Sq. ft.)

115818 Total
Total
115818
Booked
14391
Available
101427
Total 256 apartments in project. 38 apartments booked. 14% apartments booked.
Total 115818 Sq.ft. saleable area. 14391 saleable area booked.
12% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Mar 20287101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK50.04 Sq.mts. ( 539 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.45 Sq.mts. ( 640 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK59.65 Sq.mts. ( 642 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK61.57 Sq.mts. ( 663 Sq.ft. )5
1 Booked20% Booked
20% Booked
3 BHK78.35 Sq.mts. ( 843 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK87.25 Sq.mts. ( 939 Sq.ft. )6
None Booked0% Booked
0% Booked
3 BHK88.06 Sq.mts. ( 948 Sq.ft. )4
None Booked0% Booked
0% Booked
Office space16.71 Sq.mts. ( 180 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space24.85 Sq.mts. ( 267 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space25.67 Sq.mts. ( 276 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space27.52 Sq.mts. ( 296 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space28.61 Sq.mts. ( 308 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space38.83 Sq.mts. ( 418 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space39.23 Sq.mts. ( 422 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.61 Sq.mts. ( 308 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.92 Sq.mts. ( 311 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop30.54 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.85 Sq.mts. ( 300 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.03 Sq.mts. ( 302 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.85 Sq.mts. ( 267 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.87 Sq.mts. ( 235 Sq.ft. )1
None Booked0% Booked
0% Booked
42 total apartments / 2 apartments booked. 4% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress57% done
57% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Mar 20287101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.69 Sq.mts. ( 503 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.48 Sq.mts. ( 640 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK59.65 Sq.mts. ( 642 Sq.ft. )6
2 Booked33% Booked
33% Booked
2 BHK61.48 Sq.mts. ( 662 Sq.ft. )5
3 Booked60% Booked
60% Booked
3 BHK78.35 Sq.mts. ( 843 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK83.9 Sq.mts. ( 903 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK87.25 Sq.mts. ( 939 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK88.06 Sq.mts. ( 948 Sq.ft. )4
None Booked0% Booked
0% Booked
Office space27.52 Sq.mts. ( 296 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space38.83 Sq.mts. ( 418 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space39.23 Sq.mts. ( 422 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space22.48 Sq.mts. ( 242 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space24.85 Sq.mts. ( 267 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space25.67 Sq.mts. ( 276 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space28.61 Sq.mts. ( 308 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop28.61 Sq.mts. ( 308 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop30.54 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop33.31 Sq.mts. ( 359 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop36.01 Sq.mts. ( 388 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.67 Sq.mts. ( 276 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.31 Sq.mts. ( 283 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop24.85 Sq.mts. ( 267 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.91 Sq.mts. ( 268 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.41 Sq.mts. ( 274 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.37 Sq.mts. ( 165 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.95 Sq.mts. ( 193 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop21.87 Sq.mts. ( 235 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.52 Sq.mts. ( 296 Sq.ft. )1
1 Booked100% Booked
100% Booked
48 total apartments / 25 apartments booked. 52% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress34% done
34% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Mar 20287101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK39.06 Sq.mts. ( 420 Sq.ft. )44
Shop12.2 Sq.mts. ( 131 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop14.96 Sq.mts. ( 161 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop16.38 Sq.mts. ( 176 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.45 Sq.mts. ( 209 Sq.ft. )4
2 Booked50% Booked
50% Booked
61 total apartments / 11 apartments booked. 18% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Mar 20287101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK39.06 Sq.mts. ( 420 Sq.ft. )44
None Booked0% Booked
0% Booked
Shop12.2 Sq.mts. ( 131 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop14.96 Sq.mts. ( 161 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop16.38 Sq.mts. ( 176 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.45 Sq.mts. ( 209 Sq.ft. )4
None Booked0% Booked
0% Booked
61 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 4Completion
Basement (if any)
Excavation
work-in-progress50% done
50% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5Mar 20287101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.06 Sq.mts. ( 420 Sq.ft. )43
None Booked0% Booked
0% Booked
43 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 5Completion
Basement (if any)
Excavation
work-in-progress30% done
30% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 7Mar 20281100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow98.91 Sq.mts. ( 1065 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 7Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shree Geetanjali Builders
for Project
Dwarkadhish Nagar
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation