Project overview

Dosti West County - Dosti Nest - Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700033663. Dosti West County - Dosti Nest - Phase 2 is located at 25/7(Pt) 25/9(Pt) 25/10A(Pt) 44/1(Pt) 43/1(Pt). This is a New being developed by Dosti Enterprises.

Dosti West County - Dosti Nest - Phase 2 has 1 BHK Apartments with carpet areas ranging from 266 to 289 Sq.ft. Carpet. The Project has total 373 of which 2 are currently available for sale.

Dosti West County - Dosti Nest - Phase 2 is being developed on a total land area of 26479 Sq.ft. Dosti West County - Dosti Nest - Phase 2 has 1 Wings / Towers Wing A Of Dosti Dove Building

ProjectDeveloperLocationPossession
NandigramYogesh Kishor MahajanTikka No 5, 62A/131-03-2025 00:00:00
Windermere Building No 1 To 6A G Superstructures Pvt LtdNew S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,731-12-2027 00:00:00
The EmpressUnique Shanti Developers LlpOld S.No.479/230-03-2023 00:00:00
Lotus ParkReal Enterprise842-A, Plot No. 02,0330-12-2022 00:00:00
Paramount BKalpataru Homes Private LimitedS.No. 114/8-Part,114/4-Part30-06-2025 00:00:00
Rental Building A-1 R2Sonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Raviraj ApartmentRajendra GhorpadeS.No 85,H. No 11, Plot No 930-12-2022 00:00:00
Krupa SindhuAshish Waman GoleS No 48 H No 8/428-11-2021 00:00:00
Arvind GalaxySanchit EnterprisesTika No 16 Cts No 7830-12-2023 00:00:00
Shree Sai Pooja ApartmentOm Sai RealtyS No 29/A H No 19 Plot No 8730-09-2019 00:00:00
Mauli MadhusudhanRameshwar Patil42160530-03-2023 00:00:00
Salangpur NirmanSalangpur Nirman252 6,7 Part30-12-2022 00:00:00
Golden Hills B- 3Vihang Enterprises921,923,9241,9243,928130-12-2024 00:00:00
Classic ResidencyClassic ConstructionThane30-06-2021 00:00:00
Sarvodaya ClassicEkta BuildersSurvey No. 28 H.No 530-03-2026 00:00:00
Ten X Era Raymond Realty Tower CRaymond Limited121 Pt 83/3 83/130-01-2029 00:00:00
Guru Ganesh ChsVadnere Builder & DevelopersSurvey No 13 Hissa No 6(A) Plot No 2631-12-2025 00:00:00
Mangeshi NeptuneMangesh GaikarThane31-12-2027 00:00:00
Payal PrideMit Enterprises10430-03-2022 00:00:00
Panvelkar Estate - GreenfordPanvelkar Infrastructures Private LimitedSurvey No. 42 Hissa No 2 And 330-12-2022 00:00:00
Plot 1 Sector 10 GhansoliCidco Of Maharashtra Ltd.Plot No 130-06-2021 00:00:00
M K Thakur Complex Phase 1Vraj Ratan Buildcon Pvt LtdSurvey No 77 1A 2 4 501-12-2021 00:00:00
My City - Phase I - Part IiHorizon Projects Pvt LtdSurvey No 36Pt 77Pt31-12-2018 00:00:00
Silver ArcadeSiddhivinayak Enterprises5831-12-2018 00:00:00
Kashi Darshan B WingVarad Raj Construction98/1920-12-2023 00:00:00
Saroj Sadan Chs LtdShrusti DevelopersThane19-01-2026 00:00:00
Narang Privado - BNarang Realty Private Limited146/5/B And 146/6/B/131-03-2028 00:00:00
AvesaJagdale Infrastructure Pvt. Ltd.50602-10-2026 00:00:00
Teri KudratVishnu Jethanand BadlaniPlot No 433, Sheet No 48, Cts No 2578331-10-2024 00:00:00
Kanha ResidencyKulkarnii Builder105A/4/2/3/4/5/4114-05-2025 00:00:00
Bharat Ecovistas Phase IiBharat Realty Venture Private Limited67/2/P, 67/3A, Sub Plot B30-12-2023 00:00:00
Panvelkar Estate - Stanford - Phase 1Panvelkar Infrastructures Private LimitedGut No 42/131-12-2018 00:00:00
Jai MatadeeAaradhana Developers37531-03-2018 00:00:00
Lodha Majiwada - Tower 1Macrotech Developers Limited28/5P, 29/6P, 29/7P, 29/8, 29/9P, 31/8P, 31/4P28-11-2022 00:00:00
Sun OrchidMohammed Siraj Basheer30130-12-2018 00:00:00
Lodha Majiwada - Tower 4Macrotech Developers Limited31/3P, 31/4P, 31/5P, 31/6P, 31/9P28-11-2022 00:00:00
Cosmos Horizon Phase IiConcorde Developers192/2A30-03-2024 00:00:00
Simone ResidencyM R M DevelopersDaighar Village30-12-2022 00:00:00
Delta WoodsDelta Venture1883Pt30-09-2023 00:00:00
Keyur Co-Operative Housing Society LtdDhanashree DevelopersKansai31-12-2025 00:00:00
Suyog ApartmentTelange Builders & Developers Private Limited4693 To 469930-03-2025 00:00:00
Prabhat DarshanYashomalhar Construction7015A/1A30-06-2023 00:00:00
One Indiabulls Thane - 1Tapir Constructions Limited71/1/A/1/1, 71/229-08-2024 00:00:00
Lodha Amara - Tower 26, 27, 28, 30, 34, 35Macrotech Developers Limited64/3,64/7,65/2,65/3,65/4,65/5, 68/3,68/4,68/5,69/2,69/6,70/1,70/2,70/3,70/430-12-2021 00:00:00
Kapil ContinentalSacvir Realtors Llp87/3/3 & 88/1/C11-04-2025 00:00:00
Sarthi ElanzaSarthi DevelopersS No-264/58 Plot No-5531-10-2023 00:00:00
Bsc It ParkBansal Steel CorporationA21601-06-2024 00:00:00
Tulsi Vrindavan SocietyGaurang AssociatesThane, 40060220-10-2017 00:00:00
Delta VrindavanDelta VentureCts 1838 1840 1883 To 1886 1968 To 1971 2039 To 2044 2100 To 2103 2157 2221 2222 2294 2158 2295 174130-09-2020 00:00:00
Trinity MokshRattanraj LifespacesS No 64 1 And 64 231-03-2025 00:00:00
Ganesh BhuvanMagnum Homes66830-09-2024 00:00:00
Audumber Flower ValleyAudumber SuperstructuresS No 5/4/D 5/4/B 5/23/B30-06-2025 00:00:00
Shivsai ParadiseBharat Agri Fert & Realty Realty Ltd112/2A,3,4,5/1,5/2,5/330-12-2028 00:00:00
RubaShreyas Enterprises112/5/430-09-2020 00:00:00
Krishna - B WingNeelkanth Palm Realty149/4/1 Pt, 412/2 Pt30-05-2022 00:00:00
Spm Dream City Phase 1D K BuildconS No 52 H No 4/531-12-2028 00:00:00
Paramount CKalpataru Homes Private LimitedSno 115/5Pt 115/9Pt 115/12Pt,115/13Pt Of Village Majiwade 212/1Pt Of Village Balkum30-06-2025 00:00:00
My City Phase Ii Cluster 5 Part IiHorizon Projects Pvt Ltd108/1 And 93 Part31-12-2027 00:00:00
Raj Tattva Wing A B And EKothari Autoparts Manufacturers Private Limited1411, 2, 3, 144, 1451, 2, 4, 1462, 3, 4, 1481, 1421, 1483130-12-2023 00:00:00
Ashar Metro TowersShree Saibaba Grihanirimiti Private LimitedS.No 229 Pt H.No 1,S.No 207 Pt And 208 Pt H No 7 Pt30-12-2024 00:00:00
Seven Eleven CourtyardS.S.S AssoicatesThane30-11-2025 00:00:00
Shivanjali HeightsShivanjali ConstructionSurvey No 73, 74, 75, 7630-06-2022 00:00:00
Shreeji LandmarkVinayak DevelopersSurvey No 46 Hissa No 5-130-12-2029 00:00:00
Panvelkar Estate - Oxford - Phase 1Panvelkar Infrastructures Private LimitedGut No.45/2,46/2,47,49/4,49/9,49/11,49/1230-12-2023 00:00:00
Om Yashodhan ChslSilver Stone RealtyTika No 16, Cts No 10005-11-2026 00:00:00
Embassy One ThaneTapir Constructions Limited53/1,55/1,2,3,70/2A,70/1(Pt.),70/4(Pt.),70/6(Pt.),70/7(Pt.),70/8(Pt.),70/9B,71/231-12-2030 00:00:00
Green Square- Phase Ii Tower 1 And 3Squarefeet Enterprises166/3131-12-2030 00:00:00
Shri Laxmi Nivas Co Op Hsg Soc LtdOjass Govind Infra LlpCts 46/C/1 Tika No 1531-12-2027 00:00:00
Saket ImperialNirmaan Realty9570,957107-08-2025 00:00:00
Maruti Square Building No 7Maruti Dwellers Private LimitedNew Survey Nos 63 66 And 69 Pt31-12-2027 00:00:00
Nirman SignatureShree Sha DevelopersSuevey No.180 Hissa No.3/231-03-2026 00:00:00
Runwal Lands EndRunwal Construction Private Limited20/3 Part30-06-2029 00:00:00
Bhagwan Krishna NiwasQuick Developers27/1201-07-2024 00:00:00
ZenithRunwal Developers Private LimitedSurvey No 51 Hissa No 1 To 15 Survey No 52 Hissa No 1 To 3 Survey No 5330-09-2028 00:00:00
Shree Moreshwar Chs LtdAjay Sanjay MohorikarS No 33 H No. 6/15 Cts No 897331-12-2024 00:00:00
Swami Narendra ResidencyRaj Ratneshwari Developers274/1-B31-12-2026 00:00:00
Shapoorji Pallonji Skyraa At Northern LightsJaykali Developers Private Limited509 And 510/A31-12-2027 00:00:00
Urban Nest Bldg - 1Cllaro Enterprises Llp127-1A31-12-2024 00:00:00
Green SquareSquarefeet Enterprises166/3131-12-2027 00:00:00
Larkins NestPride Property Developers68/13/3F And 68/13/3G31-12-2025 00:00:00
Sheth Avalon - Phase 1Sheth Developers Private LimitedOut Of Survey No. 48/1P, 2, 3, 4, 5P, 49/2P, 4, 73/1, 2, 3, 430-12-2021 00:00:00
Indraprasth Wing CSonam Spark Infra Private Limited30/11,14,15,21,22,24,29/1,23/2,22/1,2,330-09-2020 00:00:00
Orion -3Vijay Suraksha Realty LlpSurvey No 238/9Pt, Survey No 252/3/3Pt, Survey No 252/4/1 30-12-2020 00:00:00
Sai SrushtiJyotirmay Developers55 Hissa No 331-05-2018 00:00:00
Krishna Vihar Co-Operative Housing Society LimitedBal Ganapati Laabh DevelopersCts Nos 20/7 And 33A T No 1630-12-2021 00:00:00
Yashanand Chsl Ojass ConstructionsOjass ConstructionsCts No. 4030-03-2022 00:00:00
Orion - Northern LightsJaykali Developers Private LimitedS No 509 And 510 P30-03-2025 00:00:00
RadhakrishnaM/S Nirmaan Developers6230-11-2020 00:00:00
Cosmos Habitate A WingConcorde AssociatesS No 123 / 1A And 1B30-09-2021 00:00:00
Sheth Avalon - Phase 2Sheth Developers Private LimitedOut Of Survey No48/1P,2,3,4,5P, 49/2P,4,73/1,2,3,4,530-12-2025 00:00:00
Omega - Northern LightsJaykali Developers Private LimitedS No 509 And 510 P30-03-2025 00:00:00
Royal EmpireSai Pooja ConstructionsS No 184 H No 2A30-12-2024 00:00:00
Guru SakshatSadguru EnterprisesPlot No 3 Gut No 46/3 H No 4 And 530-12-2025 00:00:00
Shanti LegacyAnmol InfraOld S. No. 368, New S. No. 7031-03-2025 00:00:00
Rukmani ResidencyClay Nest Developers42130831-12-2027 00:00:00
Shree Chintamani Co Op Hsg Soc LtdShree Ganesh Construction400602, Thane, Kumbharwada Shivaji Path31-03-2024 00:00:00
Hcs HorizonHcs Realtors LlpOld Survey No 271 New Survey No 82 Hissa No 1131-12-2026 00:00:00
Maplewoods Phase 1M/S Bks Galaxy Realtors Llp51(2) 56 And 57(2)31-12-2028 00:00:00
Newa Bhakti Park B WingNewa Technocity (I) Private LimitedIt 631-12-2027 00:00:00
Laxmi ArcadeSatish Kashinath Gujarathi36231-12-2024 00:00:00
KrishnapingakshaPrashant Tukaram BaeetS No 51 , H No 2/A/26 , Plot No 2631-12-2026 00:00:00
Navsundaram Co Op Hsg SocietyShreekanth DevelopersS No 4 ,H No 18 , Plot No 2 & Plot No 331-03-2026 00:00:00
Sheth ZuriSheth Developers Private LimitedOut Of Survey No 85/1P, 81/1A, 83/2, 83/5, 85/230-12-2024 00:00:00
Gloria VistaMadireddy Konda Reddy14921-09-2018 00:00:00
CallistaOtto ConstructionsThane, 40060130-12-2025 00:00:00
Teejadeep HeightsTeejadeep Developers39B30-09-2018 00:00:00
Elegant OlympiaElegant Homes2314-05-2018 00:00:00
Dream SolitaireSatyam Concast Private LimitedPlot No 103 And 11505-12-2018 00:00:00
Om Ashish ChsGreen Heights Infra42150331-12-2025 00:00:00
Shiv Ganga ApartmentShree Swami Samarth Construction21534, 21552 Plot No. 253 Section - 3 A31-12-2024 00:00:00
Thanekar Civic Phase IiThanekar Construction LlpSurvey No. 133 Hissa No. 230-12-2024 00:00:00
Project Details
  • Project:
    Dosti West County - Dosti Nest - Phase 2
  • Location:
  • 25/7(Pt) 25/9(Pt) 25/10A(Pt) 44/1(Pt) 43/1(Pt)
  • Const. Stage:
    New
  • Possession:
    30 Jun 2027
Developer Details

  • Developer:
    Dosti Enterprises
  • Phone:
  • Address:
  • 1St Floor Lawrence & Mayo House
Project RERA Details
MAHA REARA No: P51700033663
Project Type Residential / Group Housing
RERA Project Status New
Architect Architect Jay R Vora
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Jun 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Apr 2025
Last Retrived 26 Jul 2025
Dosti West County - Dosti Nest - Phase 2 QR Code
Dosti West County - Dosti Nest - Phase 2
MahaRERA - P51700033663
Apartment Details & Configuration
TypeArea
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )
1 BHK26.81 Sq.mts. ( 289 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dosti West County - Dosti Nest - Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
No Receiving Station
Energy management
Solar Panels At Terrece Level
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Provision For Stp Made In The Layout
Solid Waste Management And Disposal
Provision For Owc Made In The Layout
Storm Water Drains
Provision Made In Layout
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Provision Made In Layout
Water Conservation, Rain water Harvesting
Provision Made In Layout
Water Supply
As Per Tmc
Buildings / Wings in Dosti West County - Dosti Nest - Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dosti West County - Dosti Nest - Phase 2 by Dosti Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

26479 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

373 apartments in total
Total
373
Booked
371
Available
2

Saleable Area Statistics (Sq. ft.)

103502 Total
Total
103502
Booked
102947
Available
555
Total 373 apartments in project. 371 apartments booked. 99% apartments booked.
Total 103502 Sq.ft. saleable area. 102947 saleable area booked.
99% area booked.

Wing A Of Dosti Dove Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A Of Dosti Dove BuildingJun 202733101300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.72 Sq.mts. ( 266 Sq.ft. )184
183 Booked99% Booked
99% Booked
1 BHK26.81 Sq.mts. ( 289 Sq.ft. )189
188 Booked99% Booked
99% Booked
373 total apartments / 371 apartments booked. 99% apartments booked.
Work Description in Building Wing A Of Dosti Dove BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress67% done
67% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress67% done
67% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress45% done
45% Booked
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress52% done
52% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress52% done
52% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dosti Enterprises
for Project
Dosti West County - Dosti Nest - Phase 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation