Project overview

Dosti Belleza is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900015989. Dosti Belleza is located at C S No. 242 Parel Sewree Division. This is a New being developed by Crystal Builders And Developers.

Dosti Belleza has 1 BHK, 2 BHK, 3 BHK TYPE 1, 3 BHK TYPE 2 & 3 BHK TYPE3 Apartments with carpet areas ranging from 1119 to 1037 Sq.ft. Carpet. The Project has total 49 of which 0 are currently available for sale.

Dosti Belleza is being developed on a total land area of 3807 Sq.ft. Dosti Belleza has 1 Wings / Towers Dosti Belleza

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Dosti Belleza
  • Location:
  • C S No. 242 Parel Sewree Division
  • Const. Stage:
    New
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Crystal Builders And Developers
  • Phone:
  • Address:
  • 276
Project RERA Details
MAHA REARA No: P51900015989
Project Type Residential / Group Housing
RERA Project Status New
Architect Hafeez Contractor
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 11 Apr 2018
Last Retrived 26 Jul 2025
Dosti Belleza QR Code
Dosti Belleza
MahaRERA - P51900015989
Apartment Details & Configuration
TypeArea
1 BHK45.65 Sq.mts. ( 491 Sq.ft. )
2 BHK78.36 Sq.mts. ( 843 Sq.ft. )
3 BHK TYPE 196.3 Sq.mts. ( 1037 Sq.ft. )
3 BHK TYPE 2104 Sq.mts. ( 1119 Sq.ft. )
3 BHK TYPE3105.71 Sq.mts. ( 1138 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Dosti Bellezalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Proposed As Per Sanction Municipal Plan
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room Below Bldg Substation For Layout
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Requirements
FITNESS CENTRE100% completed
95% Complete
Proposed As Amenity For Sale Component
Landscaping & Tree Planting
Provision Made In Layout
NA
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Only Chamber &Amp; Drainage Lines No Septic Tank &Amp; Stp
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Proposed As Layout Amenity
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Disposed To Muncipal Drain
Water Conservation, Rain water Harvesting100% completed
95% Complete
Proposed As Layout Amenity
Water Supply
By Brihanmumbai Municipal Corporation
Buildings / Wings in Dosti Belleza
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Dosti Belleza by Crystal Builders And Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

3807 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

49 apartments in total
Total
49
Booked
49
Available
0

Saleable Area Statistics (Sq. ft.)

48796 Total
Total
48796
Booked
48796
Available
0
Total 49 apartments in project. 49 apartments booked. 100% apartments booked.
Total 48796 Sq.ft. saleable area. 48796 saleable area booked.
100% area booked.

Dosti Belleza

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Dosti BellezaDec 2020241112060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.65 Sq.mts. ( 491 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK78.36 Sq.mts. ( 843 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK TYPE 196.3 Sq.mts. ( 1037 Sq.ft. )16
16 Booked100% Booked
100% Booked
3 BHK TYPE 2104 Sq.mts. ( 1119 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK TYPE3105.71 Sq.mts. ( 1138 Sq.ft. )2
2 Booked100% Booked
100% Booked
49 total apartments / 49 apartments booked. 100% apartments booked.
Work Description in Building Dosti BellezaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Crystal Builders And Developers
for Project
Dosti Belleza
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation